• CR2SM Project, Sunshine Coast, Qld – On behalf of FHSWJV and TMR, led the assessment and remediation of
various contaminated sites to facilitate road construction. Works included former landfills and impact from former
industrial and residential land use.
• Former Asbestos Mine, Baryulgil, New South Wales – Various asbestos management services during the
rehabilitation of tailings from a former chrysotile asbestos mine affecting an adjacent community. Services included
building surveys, air and soil assessments and monitoring of civil and rehabilitation works for the Aboriginal and
Torres Strait Islander Commission.
• Maryvale Reserve, Qld – Southern Downs Regional Council, led the assessment of soil and groundwater of a former
railways yard including the assessment of livestock dip risks, to facilitate removal from the EMR.
• Defence Establishments at Meeandah, Bulimba and Amberley, Qld – One of the largest asbestos auditing and
abatement projects in Queensland to date, with Andrew Project Managing and technical lead for surveying and
supporting asbestos removal works across multiple establishments and buildings to promote limited disruption to key
Defence services. The value of the assessment and abatement works to Defence was in excess of $20M. Additional
project management and technical lead of base wide asbestos surveys of HMAS Shoalhaven, NSW and RAAF
Townsville.
• Superintendency and Remediation Management, Howard Power Station Demolition, Qld – Above and below
ground environmental assessment, inclusive of hazardous materials assessment of structures and site
contamination assessment. Preparation of relevant sections of the Specification for Demolition and Rehabilitation
and site supervision for 18 months. Transitioned into the Superintendent role for remaining year of works involving
demolition, finalisation of site rehabilitation, waste containment cell capping and construction of boat ramp and
parklands on behalf of Qld Power Trading Corporation (Enertrade).
• Sundale, Tewantin, Qld – Provision of contaminated land assessment and remediation planning. Project managed
the performance and documentation of remediation works that occurred over several months, involving removal of
large quantities of fill impacted with various contaminants.
• Hood St, Warner, Qld – Contaminated land and groundwater assessment, and project management of
remediation works over several weeks for removal of the Site from the EMR.
• Former Commonwealth Games Site, Perth, WA – Asbestos and other hazardous materials survey, specification,
air monitoring and project management for demolition of a large grandstand complex at the Perry Lakes Urban
Redevelopment Site for LandCorp. Works included innovative asbestos removal trials and subsequent application
and granting of an exemption by the WA Worksafe Commissioner with regards to the recommended asbestos
removal and demolition approach, which provided a significant time and cost saving to the Client.
• Tennyson Power Station, Brisbane, Qld – Provision of hazardous materials assessment, land contamination
assessment, pre-tender cost estimate for demolition and designing remediation works.
• Hazardous Materials, International Experience - Since 2007 Andrew has spent a total of six months on
international projects including the Solomon Islands, Philippines and Indonesia. Project work involved an asbestos
survey of a hydroelectric power station in the Philippines and hazardous materials assessments assisting the
reconstruction of Aceh, Indonesia.
• Asbestos Audits, Somerset, North Pine and Wivenhoe Dams – Project Manager and Lead Auditor for three
major dams located in south east Queensland on behalf of SEQ Water, including follow-up annual reinspections.
• Dalby Central, Qld – Detailed building and land contamination assessment for this former small power station,
gasworks and electrical substation site. Project manager and technical lead for remediation phase services and
validation, including specification and certifying soil remediation and friable asbestos removal for Ergon Energy.
Andrew Winters – Curriculum Vitae
Document Set ID: 23717062
Version: 0, Version Date: 01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCE DOCUMENTS - RAL25/0004 (As Published)Related documentApplication case desk ↗
About this file
- File size
- 40.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.