Original source · versioned page text
REFERENCE DOCUMENTS - RAL25/0004 (As Published)
Very large file (40.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 11, section 1. The text section number identifies this passage in the reader.
This Report is subject to the limitations set out in Section 11. It is to be read in conjunction with these
limitations, as well as the assumptions and qualifications contained throughout the Report, with no part
taken in isolation to represent the findings.
General information on the framework and stages of contaminated land assessment, including a
flowchart, is presented as Appendix B.
1.3. CHRONOLOGY
The timing of sample collection activities contributing to this DSI is:
• 24 February 2023 - PSI soil sampling
• 19 to 22 February 2024 – first DSI soil sampling effort with landfill gas field screening (DSI 1)
• 14 March 2024 – groundwater monitoring bores sampling
• 23 April 2024 – soil sampling associated with trial mechanical soil screening
• 7 May 2024 – second DSI soil sampling effort (DSI 2)
• 9 June 2024 – landfill gas bores monitoring.
125 Lot 105 SP118458 Cooroy DSI 12062024 Rev0 Lot 105 SP118458, Cooroy, QLD, 4563
12/06/2024 7 Detailed Site Contamination Investigation
Document Set ID: 23717062
Version: 0, Version Date: 01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.