REFERENCE DOCUMENTS - RAL25/0004 (As Published)
Very large file (40.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 40, section 1. The text section number identifies this passage in the reader.
6.3 Place acceptable limits on the likelihood of Analytical results of sampled media compared to
making decision errors. the assessment criteria, with statistical analysis
Methods to determine if sufficient numbers or modelling as may be required, will determine
of samples have been collected, and to if unacceptable contamination is present.
assess if the assumed hotspot size and Observations of waste types and likely volumes
shape are justifiable, should also be and comparison with assessment criteria and
documented. guidance for classifying Regulated Waste and
Notifiable Activities.
Collection and analysis of samples in
accordance with the first stage of the DSI
sampling strategy as detailed within this SAQP,
to at least the minimum sampling densities
recommended by relevant guidance documents.
Refer to Appendix B for more information on the
stages of contamination assessment and
Section 11 for the general limitations of
contaminated land assessments.
7 Optimise the design for obtaining data – to identify a resource effective sampling and analysis
design for generating data that are expected to satisfy the DQOs.
7.1 Document the final sampling and analysis See following Sections.
design, along with a discussion of the key
assumptions underlying this design.
7.2 Detail how the design should be See following Sections.
implemented, together with contingency
plans for unexpected events.
7.3 Determine the quality assurance and quality See following Sections.
control (QA/QC) procedures that would be
performed to detect and correct problems to
ensure defensible results.
7.4 Document the operational details and See following Sections.
theoretical assumptions of the selected
design in the sampling, analysis and quality
plan (SAQP).
6.2. SOIL OR FILL SAMPLING
6.2.1. RATIONALE
The soil and fill assessment effort was based on the following strategy presented within the PSI fee
proposal and subsequent DSI SAQP:
• PSI soil sampling - 11 targeted locations based upon the two suspected waste disposal AEC as
identified by the desktop assessment (5 locations within AEC 1 and 6 within AEC 2) that included one
test pit that was extended into a 15m transect (being TP7) and one location where a background
NEPM sample was collected for derivation of relevant site-derived criteria, sourced from
representative natural soil at location TP4 at a depth of 1mbgl.
125 Lot 105 SP118458 Cooroy DSI 12062024 Rev0 Lot 105 SP118458, Cooroy, QLD, 4563
12/06/2024 36 Detailed Site Contamination Investigation
Document Set ID: 23717062
Version: 0, Version Date: 01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.