Skip to the record
Accept no substitutions.

Council archive · source document

MCU10/2116 & REC10/2072 Development Application part 1 covering letter, IDAS forms 1, 5 and 7 5 Opal Street Cooroy

of 32

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                  Integrated Development Assessment System checklist



Reconfiguring a lot - IDAS checklist 3
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)


This checklist only applies when the development application seeks approval to reconfigure a lot.

You are not required to complete this checklist as part of your development application, however you may submit the
checklist with your application if you wish. The purpose of the checklist is to assist you in identifying:

•          whether you need to make a development application for the proposed development

•          if a development application is required, the relevant IDAS forms you need to complete as part of your
           application, and

•          whether you need to give a copy of your application to any referral agencies.

You should complete all questions unless the checklist indicates otherwise.

If you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
Department of Infrastructure and Planning's website, www di gld.gov au

All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.

The checklist and relevant parts do not need to be completed for applications relating only to building work requiring
assessment against the Building Act 1975.


Part 1 - General questions
1.1        Is any part of the land located in part of a future state-controlled road or within 100m of a
           state-controlled road?


             •     It is recommended that you complete part 2, question 2.1 of this checklist.

® Yes       I•     It is recommended that you complete part 2, question 2.2 of this checklist.

1.2        Is any part of the premises within a coastal management district?


      No
             •     This application requires assessment by the Department of Environment and Resource Management
q Yes
                   as a concurrence agency

Section reference:
•     Sustainable Planning Regulation 2009, schedule 7, table 2, item 14(a)

1.3        Is any lot before the proposed reconfiguration two hectares or larger?


® No

q Yes       •      It is recommended that you complete part 3 of this checklist.


1.4        Is any part of the lot subject to an easement?


q No

X Yes       •      It is recommended that you complete part 4 of this checklist.




    Department of Infrastructure and Planning                            QPIan                   `\   Queensland
                                                                                                 ♦1   fnvPrnmPnf

Used in these records

About this file

File size
5.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU10_2116 & REC10_2072 Development Application part 1 covering letter, IDAS forms 1, 5 and 7 5 Opal Street Cooroy.pdf · 5.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.