Log in to see the plans as drawn EXCAVATION AND CULTIVATION & FILL & TOPSOIL EROSION AND
EARTHWORKS SUBSURFACE SEDIMENT CONTROL
DRAINAGE Fill and subsoil material used to
make up levels shall be re-used from
Inspect the site and ascertain the The Landscape Contractor shall
nature of excavation required and previous earthworks operations on ensure measures to minimise
The Landscape Subcontractor is to site where possible which is
the working conditions that will be erosion and situation.
provide for sufficient surface and composed of natural site subsoils
encountered prior to the Take all precautions necessary to
sub-surface drainage to garden and but free from stones, sticks, roots, prevent erosion, contamination and
commencement of work. The
grass areas to ensure adequately rubbish and material toxic to plant
location of topsoil stockpiles, sedimentation of the site,
drained soft landscaped areas free growth. surrounding areas, water and
roadway and cut embankment
from surface ponding water and drainage systems, in accordance
profiles and water connection points
heavy/ waterlogged soils. Surface Supply and install imported topsoil with the Environmental Protection
must be taken into account.
and sub-surface drainage is to aid in where necessary that complies with
(Water) Policy 1997.
Surface drainage shall be diverted the healthy growth and continued Australian Standards to all turf
clear of excavations and covers shall thriving of all plant stock and grass (100mm) and garden (300mm) areas Methods of protection shall include
areas. as shown on drawings unless
GENERAL be provided where necessary for
safety. Ensure that run-off is not otherwise specified. Ensure modified
but not be limited to the following:
Comply with the relevant Australian · Construction of temporary surface
concentrated onto adjoining Standards to the extent that they are site soil is free from stones, sticks,
All works to be performed by a Convey soils, earth, sand, loose debris Unless otherwise specified, reinstate roots, rubbish and material toxic to swales;
properties and does not cause a relevant and not over-ridden by the
licensed Contractor familiar with and the like to or from the site in a all existing surfaces, items, structures nuisance thereto. Finished surfaces plant growth. Modified topsoil shall · Diversion and dispersal of
specification. concentrated flows to point where
landscape construction of this nature. manner that will prevent dropping of and anything disturbed or damaged by shall be graded in accordance with have a friable structure with good
The Contractor shall verify the location materials on streets, public and the performance of the works, to its drainage and high organic content. the water can pass through the
Construction Plans. Cultivate sub-grade to a minimum
of utilities on site prior to the private areas. Ensure that the wheels, condition at the commencement of site without damage;
Erect barriers as required to depth of 150mm prior to placing
commencement of construction, and tracks and body surfaces of all vehicles the Contract, other than that forming · Construction and maintenance of
topsoil to all planting and turf areas
ensure that they will not have an and plant leaving the site are free of part of or directly modified by the new prevent excavated material and on ground.
silt traps (eg hay bales) to prevent
effect on the works. The Landscape mud and that mud is not carried onto work. rocks from intruding onto adjoining the discharge of scoured materials
Contractor is advised to visit the site adjacent paved streets or other areas. Remove and cart away debris, spoil properties. to downstream areas;
Minimum cross falls of 1:50 on
to satisfy themselves as to local Restrict dust caused by the Works to a and surplus building materials from · Progressive restoration of
planting and pathways to drainage
conditions, accessibility, storage minimum. Take all practicable steps the site and buildings, with the disturbed areas;
collection points and overflow
space, the full extent and character of to minimise noise resulting from the exception of those works associated · Construction of temporary siltation
points. Planting areas should not
the works and the site, the nature of Works. with others prior to practical fencing.
exceed 1:3.
the ground, the supply of materials completion. Any erosion damage reinstatement
and water and the execution of the Check all delivery tickets, labels, or cleanup as a result of the
contract generally. No claim will be identification marks and, the goods Fire Ant Control contractor not adequately protecting
allowed for any alleged inadequacy of themselves to ensure that all The Landscape Subcontractor is to the site, materials or the works shall
the description herein. Should there products comply with the project allow to carry out all necessary be the responsibility of the
be any conflict, the Contractor shall documents. Where different types of measures, inspections and safeguards landscape contractor.
notify the Landscape Architect any product are specified, check to to ensure Fire Ants do not enter the
ensure that the correct type is being site via equipment, machinery, Remove temporary erosion control
immediately.
used in each location. In particular, materials and plant stock. measures when they are no longer
check that:- required.
Establish exact locations of services,
drains, sewers and water supply lines All stock has been adequately
and points prior to commencing works protected for loading and in transit.
and ensure their protection during the The sources, types, qualities, finishes
works. and colours are correct, and match
any approved samples.
Figured dimensions shall take The correct species, cultivars, pot
precedence over scale measurements sizes, plant height, girth or spread
and large scale drawings over small have been supplied for each
scale. Unless otherwise specified the consignment from the supplier.
Drawings and Specification shall All materials should be clean,
include everything reasonable for the undamaged and otherwise in good
proper and entire completion of the condition.
work.
Verify discrepancies between Ensure adequate provision is made for
Specification and Drawings with the the protection and storage of
Landscape Architect before
proceeding with the particular work.
deliveries. In particular ensure that:-
Materials which may deteriorate with
PLANT SUPPLY EXISTING TREES ENVIRONMENTAL TURFING
Failure to do so will not be taken as a storage must not be stockpiled on site. PROTECTION
reason to claim for extra work. Adequate and appropriate provision is The Landscape Contractor shall Protect all existing vegetation unless Supply and install A-grade turf
made for storage prior to deliveries supply plants as specified in the otherwise specified. All vegetation (variety specified on drawings) to
The Landscape Contractor should
arriving on site. ALL materials in planting schedule. Plants shall be and weed removal is to be carried areas shown on drawings. Finishing
consider in every instance whether
storage are to be suitably protected delivered on site true to pot size, out using industry standard accepted levels should be flush with adjacent
the use of chemicals is strictly
from physical damage and extremes species and type, and free of weeds, safety procedures and equipment to surfaces unless otherwise detailed.
necessary before application, and
of weather. Keep storage areas neat disease and fungal infection. ensure personal and environmental Spread topsoil and grade surface to
assess the product, site conditions
and tidy. Substitutes will not be made without protection. Avoid damage to nearby ensure a level finished surface,
and species to ensure minimum risk
prior consent of the Landscape trees and surroundings. which drains to nominated field
to his employees, other users of the
Architect. gullies.
site and the environment, and take
Grub out stumps and roots over
Ensure that trunks and branches appropriate safety precautions in Turf to be free from nutgrass or
75mm diameter to a minimum depth
are free of dieback, cavities, accordance with all current statutory other noxious weeds or any other
of 500mm below sub-grade. Stumps
sunburn and secretions. Trunk and regulations. material deleterious to plant growth.
less than 75mm diameter shall be
branches are to be evenly tapered cut off at ground level and treated to
and textured typical of the specie. prevent regrowth. Deliver the turf within 24 hours of
Plant material is to be matured cutting, and lay it within 36 hours
enough to support themselves Completely remove woody weeds of cutting. Prevent it from drying
without staking. within the extent of works. out between cutting and laying.
MULCH FERTILISER MAINTENANCE/ESTABLISHMENT
Supply and install organic mulch to a Provide proprietary fertilisers,
PERIOD
minimum of 100mm and gravel delivered to the site in sealed bags
mulch to a minimum of 50mm. marked to show manufacturer or Maintenance of all landscape works
Ensure mulch meets Australian vendor, weight, fertiliser type, N:P:K is to be carried out by the Contractor
Standards and is free from ratio, recommended uses and until completion of the landscape
deleterious matter, fungi and application rates. Store in a dry works.
disease. Mulch shall finish 25mm secure environment. Apply Maintenance includes replacement
below adjacent surfaces. according to manufacturer's of dead and/or diseased plant stock,
recommendations removal of weeds and rubbish, weed
(rate/reapplication/watering). spraying and mowing.
PROJECT
211207
DRAWING
specifications
CLIENT
auxilium property
seed landscape design
19 werin street drawing no drawn scale date issue t 07 3217 6491 m04 1616 9858
tewantin qld 4565 211207 02 st na dec 2021 a po box 527 paddington qld 4064
www.seedlandscapes.com.au
abn 85 468 007 510
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.