RFI engineering - 20230504 RFI response
4th May 2023
Council Ref: MCU23/0007 RAL23/001
Ms N Gorton
PO Box 141
Tewantin, QLD 4565
Attention: Nadine Gorton
Dear Ms Gorton,
Re: Information Request
At: 45 Maple Street, 4563
With reference to the abovementioned development application and the subsequent
information request from Council, we have prepared a response to the engineering matters
raised as follows.
Issue: Earthworks
1. Provide additional detail demonstrating how the proposed earthworks will be
undertaken to not undermine 7 & 11 Myall Street and 47 & 49 Maple Street and associated
structures. The additional detail must be prepared by a suitably qualified person (RPEQ –
Registered Professional Engineer of Queensland) and include, but not be limited to:
a. demonstrate the construction methodology required to carry out the proposed
earthworks; and
b. demonstrate the structural integrity of the neighbouring structures and properties will
not be adversely affected due to the proposed earthworks (cut).
The proposed retaining wall, subsoil drainage and footings, including any temporary and
permanent systems required during construction of the retaining wall are to be designed
and certified by the geotechnical and structural RPEQ engineer as part of the detailed
structural design. These systems – temporary and/or permanent – will be wholly contained
within the subject site’s property boundaries and will not adversely affect the structural
integrity neighbouring properties during installation (and/or removal, in the case of
temporary systems) as is typical for constrained infill developments.
A dilapidation report of the neighbouring structures may be conditioned prior to
commencement of works to ensure no impacts arise to neighbouring structures as a result
of the development.
Issue: Sight Distance Analysis
2. Provide a ‘Traffic Impact Report’ (or the like) and amended plans that demonstrates the
proposed access is safe for all road users by complying with Austroads’ Guide to Road Design
Part 4A. The ‘Traffic Impact Report’ (or the like) and amended plans must be prepared by a
suitably qualified person (RPEQ – Registered Professional Engineer of Queensland) and
include, but not be limited to:
P +61 7 5211 1003 A 75 Noosa Dr, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI engineering - 20230504 RFI response.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.