Original source · versioned page text
MCU24/0084 Material Change Of Use - Function Facility – 658 Louis Bazzo Drive, Ringtail Creek · Attachment 2 - (MCU24 0084) - Planning Officer'S Report
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024 The acoustic report demonstrates that the proposed facility will comply with the relevant noise criteria, subject to its recommendation that an acoustic barrier is provided between the access driveway and nearby residences. This barrier is to be 30m long, 1.8m high, and constructed adjacent to the eastern residence at 642 Louis Bazzo Drive. It is noted that that the nearest dwelling, which is located at 35 Hessen Place, Ringtail Creek, is located approximately 725m from the proposed location of the Function Facility. The existing driveway is located approximately 40m from the neighbouring dwelling at 642 Louis Bazzo Drive. Acoustic measures and treatments, including the recommended acoustic barrier with the nominated construction Weighted Sound Reduction Index (RW) must be incorporated into the development in accordance with the Environmental Noise Impact report and maintained onsite. It is recommended that the development be conditioned, in accordance with the recommendations of Council’s consulting noise expert, to manage noise to ensure that the amenity of nearby residents is maintained. These include conditions recommended to limit the nature and extent of the proposed use, the hours of operation, amplified music, the submission of a Noise Management Plan and construction of the acoustic barrier as details above. An Operational Management Plan has also been provided, the plan includes a comprehensive overview of how the events will be managed particularly regarding operating hours, noise requirements patron behaviour management and complaint procedures. To address the issue of dust causing a nuisance, it is recommended that a condition be included requiring the access/driveway be sealed. The driveway will be signed to be a low-speed environment that is restricted to 20km/h. The sealing of the driveway will also reduce the noise caused by vehicles and buses while traversing the driveway. Traffic Access into the subject site is taken from Louis Bazzo Drive, a state-controlled road. The number of car parking spaces (50) provided in the car parking area is more than the minimum amount (47) required. The proposed development is supported by a Traffic Engineering report that is RPEQ certified. The report confirms that the anticipated number of vehicles will not adversely impact on the operational performance of the surrounding road network. The layout of the carpark is generally compliant with the relevant Australian standard. A set of vehicle turn paths demonstrating the coaches are able to manoeuvre on site has been provided. The carpark includes a fire egress road that crosses a dam outlet. Further assessment of the interface between the existing outlet and fire egress road is to be undertaken as part of the Operational Works phase. The application was referred to SARA due to Louis Bazzo Drive being a State controlled road. Accordingly, the Department of Transport and Main Roads has reviewed the application requiring conditions to be included on any approval regarding road access works. These works include turn treatments for a Basic Right Turn and Basic Left Turn are to be carried out in accordance with DTMR requirements. As the responsible authority, SARA has deemed the revised access arrangement suitable. Waste servicing is to occur via the proposed carpark. Vehicle turn paths for the waste collection vehicle have been provided, demonstrating the vehicle can service the bins and manoeuvre the site to exit in a forward gear. Environmental Impacts The proposal has addressed the potential impacts on biodiversity, ecosystem health, ecological processes, soil, air and water quality through the submission of an Ecological Report and Stormwater Management Plan.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.