Development application - 14 Grosvenor Tce, Noosa Heads

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

DA Form 1 - Development application details
Approved form (version 1.1 effective 22 JUNE 2018) made under section 282 of the Planning Act 2016.

This form must be used to make a development application involving code assessment or impact assessment,
except when applying for development involving building work.
For a development application involving building work only, use DA Form 2- Building work details.
For a development application involving building work associated with any other type of assessable development
(i.e. material change of use, operational work or reconfiguring a lot), use this form (DA Form 1) and parts 4 to 6 of
DA Form 2 - Building work details.
Unless stated otherwise, all parts of this form must be completed in full and all required supporting information must
accompany the development application.
One or more additional pages may be attached as a schedule to this development application if there is insufficient
space on the form to include all the necessary information.

 This form and any other form relevant to the development application must be used to make a development
 application relating to strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994,
 and airport land under the Airport Assets (Restructuring and Disposal) Act 2008. For the purpose of assessing a
 development application relating to strategic port land and Brisbane core port land, any reference to a planning
 scheme is taken to mean a land use plan for the strategic port land, Brisbane port land use plan for Brisbane core
 port land, or a land use plan for airport land.
Note:    All terms used In this form have the meaning given under the Planning Act 2016, the Planning Regulation 2017, or the Development
         Assessment Rules (DA Rules).


PART 1 - APPLICANT DETAILS

 Applicant name(s) (individual or company full name)                 NifAs- i^oeL,                    iv\c rv\gf\i Am ms
 Contact name (only applicable for companies)

 Postal address (P.O. Box or street address)                               C5 RoSu'grSiOR
 Suburb                                                                NCOS A
 State                                                                  cup
 Postcode                                                              4-S1B7
 Country                                                                 Australia
 Contact number                                                              i ?>q aar/
 Email address (non-mandatory)                                         Pu-fe-l l 4- CA ouTiccL. < corn
 Mobile number (non-mandatory)                                         Q             t        a3.-f
 Fax number (non-mandatory)                                              A) A
 Applicant’s reference number(s) (if applicable)



 2.1) Is written consent of the owner required for this development application?
 □ Yes - the written consent of the owner(s) is attached to this developmeflf^^pliLit^n
 0 No - proceed to 3)                                                  /C y'>>T ^
                                                                                                            \p
                                                                   ~                           Received
PART 2 - LOCATION DETAILS
                                                                                         j 18 DEC 2020
                                                                                     [•<4 \
                                                                                                               f-
                                                                                                                             Queensland
                                                    Box:   3j5§;            ,:r<rf)                                          Government
Log in to download the original file

Development application - 14 Grosvenor Tce, Noosa Heads.pdf · 11.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 15 pages

Page 2

[7] Street address AND lot on plan {all lots must be listed), or
□ Street address AND lot on plan for an adjoining or adjacent property of the premises (appropriate for development in
water but adjoining or adjacent to land e.g. jetty, pontoon; all lots must be listed).
        Unit No.      Street No.      Street Name and Type                          Suburb

 a)
                        14                       i/g rtiQ (Z                        fttepSA       \AB(\PS.
        Postcode      Lot No.         Plan Type and Number (e.g. RP, SP)            Local Government Area(s)
                        <3.0               SP             ZLX                        l^iOPSfX CpUfNjCfL-
        Unit No.      Street No.      Street Name and Type                          Suburb

 b)
        Postcode      Lot No.         Plan Type and Number (e.g. RP, SP)            Local Government Area(s)




E] Coordinates of premises by longitude and latitude
Longitude(s)                    Latitude(s)                Datum                  Local Government Area(s) (if applicable)
                                                           □ WGS84
                                                           □ GDA94
                                                           □ Other:
□ Coordinates of premises by easting and northing
Easting(s)              Northing(s)           Zone Ref.    Datum                  Local Government Area(s) (if applicable)
                                              □ 54         □ WGS84
                                              □ 55         □ GDA94
                                              □ 56         □ Other:

□ Additional premises are relevant to this development application and their details have been attached in a
schedule to this application
0 Not required




□ In or adjacent to a water body or watercourse or in or above an aquifer
Name of water body, watercourse or aquifer:
□ On strategic port land under the Transport Infrastructure Act 1994
Lot on plan description of strategic port land:
Name of port authority for the lot:
□ In a tidal area
Name of local government for the tidal area (if applicable):
Name of port authority for tidal area (if applicable):
□ On airport land under the Airport Assets (Restructuring and Disposal) Act 2008
Name of airport:
□ Listed on the Environmental Management Register (EMR) under the Environmental Protection Act 1994
EMR site identification:
□ Listed on the Contaminated Land Register (CLR) under the Environmental Protection Act 1994
CLR site identification:




                                                                                                                        Page 2
                                                                                     DA Form 1 - Development Application details
                                                                                                    Version 1.1—22 JUNE 2018

Page 3

 n Yes - All easement locations, types and dimensions are included in plans submitted with this development
         application
 □ No

PART 3 - DEVELOPMENT DETAILS

Section 1 - Aspects of development

 a) What is the type of development? (tick only one box)
 □ Material change of use                    □ Reconfiguring a lot                 0 Operational work                      □ Building work
 b) What is the approval type? (tick only one box)
 □ Development permit                        □ Preliminary approval                □ Preliminary approval that includes
                                                                                        a variation approval
 c) What is the level of assessment?
 □ Code assessment                           I I Impact assessment (requires public notification)
 d) Provide a brief description of the proposal (e.g. 6 unit apartment building defined as multi-unit dwelling, reconfiguration of 1 lot into 3
 lots)'.


    PR. \ \t fVre       Pom&Srtc                                          ^
 e) Relevant plans
 Note: Relevant plans are required to be submitted for all aspects of this development application. For further information, see DA Forms guide:
 Relevant plans.
 0 Relevant plans of the proposed development are attached to the development application


 a) What is the type of development? (tick only one box)
 □ Material change of use                    □ Reconfiguring a lot                 Q/Operational work                     E] Building work
 b) What is the approval type? (tick only one box)
 [7] Development permit                      □ Preliminary approval                E] Preliminary approval that includes a variation
                                                                                   approval
 c) What is the level of assessment?
 □ Code assessment                           □ Impact assessment (requires public notification)
 d) Provide a brief description Of the proposal (e.g. 6 unit apartment building defined as multi-unit dwelling, reconfiguration of 1 lot into 3
 lots).



 e) Relevant plans
 Note: Relevant plans are required to be submitted for all aspects of this development application. For further information, see DA Forms Guide:
 Relevant plans.
 LH Relevant plans of the proposed development are attached to the development application




0 Additional aspects of development are relevant to this development application and the details for these aspects
that would be required under Part 3 Section 1 of this form have been attached to this development application
0 Not required


Section 2 - Further development details

                                                                                                                                          Page 3
                                                                                                       DA Form 1 - Development Application details
                                                                                                                      Version 1.1—22 JUNE 2018

Page 4

 Material change of use                    □ Yes - complete division 1 if assessable against a local planning instrument
 Reconfiguring a lot                       □ Yes - complete division 2
 Operational work                          [7] Yes - complete division 3
 Building work                             □ Yes - complete DA Form 2 - Building work details

Division 1 - Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
local planning instrument.____________________________________________________________________________________________________


 Provide a general description of the                   Provide the planning scheme definition                  Number of dwelling        Gross floor
 proposed use                                           (include each definition in a new row)                  units (if applicable)     area (m2)
                                                                                                                                          (if applicable)




 □ Yes
 □ No

Division 2 - Reconfiguring a lot
Note: This division is only required to be completed if an<   iart of the development application involves reconfiguring a lot.




 □ Subdivision (complete 10))                                          □ Dividing land into parts by agreement (complete 11))
 □ Boundary realignment (complete 12))                                 □ Creating or changing an easement giving access to a lot
                                                                         from a construction road (complete 13))




 Intended use of lots created                Residential               Commercial                Industrial              Other, please specify:


 Number of lots created


 □ Yes - provide additional details below
 □ No
 How many stages will the works include?
 What stage(s) will this development application
 apply to?




 Intended use of parts created               Residential               Commercial                Industrial              Other, please specify:


 Number of parts created




                                                                                                                                                 Page 4
                                                                                                              DA Form 1 - Development Application details
                                                                                                                             Version 1.1—22 JUNE 2018

Page 5

                                   Current lot                                                                 Proposed lot
 Lot on plan description                     Area (m2)                               Lot on plan description                 Area (m2)




 Existing or                Width (m)       Length (m)         Purpose of the easement? (e.g.                     Identify the land/lot(s)
 proposed?                                                    pedestrian access)                                  benefitted by the easement




Division 3 - Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.


 □ Road work                                              FI Stormwater                          □ Water infrastructure
 □ Drainage work                                          □ Earthworks                           □ Sewage infrastructure
 □ Landscaping                                            □ Signage                              □ Clearing vegetation
 0 Other - please specify:
                                                            Oomesne o

 l~l Yes - specify number of new lots:
 □ No

 $

PART 4 - ASSESSMENT MANAGER DETAILS




 FI Yes - a copy of the decision notice is attached to this development application
 □ Local government is taken to have agreed to the superseded planning scheme request - relevant documents
 attached
 □ No



PART 5 - REFERRAL DETAILS


 □ No, there are no referral requirements relevant to any development aspects identified in this development
 application - proceed to Part 6
 Matters requiring referral to the Chief Executive of the Planning Regulation 2017:


                                                                                                                                            Page 5
                                                                                                         DA Form 1 - Development Application details
                                                                                                                        Version 1.1—22 JUNE 2018

Page 6

    Clearing native vegetation
    Contaminated land (unexploded ordnance)
    Environmentally relevant activities (ERA) (only if the ERA have not been devolved to a local government)
    Fisheries - aquaculture
    Fisheries - declared fish habitat area
    Fisheries - marine plants
    Fisheries - waterway barrier works
    Hazardous chemical facilities
    Queensland heritage place (on or near a Queensland heritage place)
    Infrastructure - designated premises
    Infrastructure - state transport infrastructure
    Infrastructure - state transport corridors and future state transport corridors
    Infrastructure - state-controlled transport tunnels and future state-controlled transport tunnels
    Infrastructure - near a state-controlled road intersection
    On Brisbane core port land near a State transport corridor or future State transport corridor
    On Brisbane core port land - ERA
    On Brisbane core port land - tidal works or work in a coastal management district
    On Brisbane core port land - hazardous chemical facility
    On Brisbane core port land - taking or interfering with water
   On Brisbane core port land - referable dams
   On Brisbane core port land - fisheries
   Land within Port of Brisbane’s port limits
   SEQ development area
   SEQ regional landscape and rural production area or SEQ rural living area - tourist activity or sport and
recreation activity
   SEQ regional landscape and rural production area or SEQ rural living area - community activity
   SEQ regional landscape and rural production area or SEQ rural living area - indoor recreation
   SEQ regional landscape and rural production area or SEQ rural living area - urban activity
    SEQ regional landscape and rural production area or SEQ rural living area - combined use
    Tidal works or works in a coastal management district
    Reconfiguring a lot in a coastal management district or for a canal
    Erosion prone area in a coastal management district
    Urban design
    Water-related development - taking or interfering with water
    Water-related development - removing quarry material (from a watercourse or lake)
    Water-related development - referable dams
    Water-related development — construction of new levees or modification of existing levees (category 3 levees only)
    Wetland protection area

Matters requiring referral to the local government:
□ Airport land
I I Environmentally relevant activities (ERA) (only if the ERA have been devolved to local government)
□ Local heritage places
Matters requiring referral to the chief executive of the distribution entity or transmission entity:
□ Electricity infrastructure
Matters requiring referral to:
•   The Chief executive of the holder of the licence, if not an individual
•   The holder of the licence, if the holder of the licence is an individual
□ Oil and gas infrastructure
Matters requiring referral to the Brisbane City Council:
□ Brisbane core port land



                                                                                                                                Page 6
                                                                                             DA Form 1 - Development Application details
                                                                                                            Version 1.1—22 JUNE 2018

Page 7

Matters requiring referral to the Minister under the Transport Infrastructure Act 1994:
  Brisbane core port land (inconsistent with Brisbane port LUP for transport reasons)
  Strategic port land
Matters requiring referral to the relevant port operator:
I I Land within Port of Brisbane’s port limits (below high-water mark)
Matters requiring referral to the Chief Executive of the relevant port authority:
□ Land within limits of another port (below high-water mark)
Matters requiring referral to the Gold Coast Waterways Authority:
□ Tidal works, or work in a coastal management district in Gold Coast waters
Matters requiring referral to the Queensland Fire and Emergency Service:
□ Tidal works marina (more than six vessel berths)



□ Yes - referral response(s) received and listed below are attached to this development application
□ No
Referral requirement                                  Referral agency                                   Date of referral response



Identify and describe any changes made to the proposed development application that was the subject of the
referral response and the development application the subject of this form, or include details in a schedule to this
development application (if applicable).



PART 6 - INFORMATION REQUEST


[7] I agree to receive an information request if determined necessary for this development application
□ I do not agree to accept an information request for this development application
Note: By not agreeing to accept an information request I, the applicant, acknowledge:
• that this development application will be assessed and decided based on the information provided when making this development application
  and the assessment manager and any referral agencies relevant to the development application are not obligated under the DA Rules to
  accept any additional information provided by the applicant for the development application unless agreed to by the relevant parties
• Part 3 of the DA Rules will still apply if the application is an application listed under section 11.3 of the DA Rules.
Further advice about information requests is contained in the DA Forms Guide.

PART 7 - FURTHER DETAILS


ED Yes - provide details below or include details in a schedule to this development application
D No
List of approval/development             Reference number                      Date                                  Assessment
application references                                                                                               manager
□ Approval
□ Development application
□ Approval
□ Development application




□ Yes - a copy of the receipted QLeave form is attached to this development application


                                                                                                                                      Page 7
                                                                                                   DA Form 1 - Development Application details
                                                                                                                  Version 1.1—22 JUNE 2018

Page 8

   No - I, the applicant will provide evidence that the portable long service leave levy has been paid before the
assessment manager decides the development application. I acknowledge that the assessment manager may give
a development approval only if I provide evidence that the portable long service leave levy has been paid
   Not applicable (e.g. building and construction work is less than $150,000 excluding GST)
Amount paid                            Date paid (dd/mm/yy)                             QLeave levy number




□ Yes - show cause or enforcement notice is attached
□ No




□ Yes - the required attachment (form ESR/2015/1791) for an application for an environmental authority
accompanies this development application, and details are provided in the table below
□ No
Note: Application for an environmental authority can be found by searching “ESR/2015/1791” as a search term at www.gld.gov.au. An ERA
requires an environmental authority to operate. See www.business.gld.gov. au for further information.
Proposed ERA number:                                                            Proposed ERA threshold:
Proposed ERA name:
  □       Multiple ERAs are applicable to this development application and the details have been attached in a
          schedule to this development application.                          ___________________________



□ Yes - Form 69: Notification of a facility exceeding 10% of schedule 15 threshold is attached to this development
application
□ No
Note: See www.business.gld.gov.au for further information about hazardous chemical notifications.




□ Yes - this development application includes written confirmation from the chief executive of the Vegetation
Management Act 1999 (s22A determination)
□ No
Note: 1. Where a development application for operational work or material change of use requires a s22A determination and this is not included,
the development application is prohibited development.
2. See https://www.gld.gov.au/environment/land/vegetation/applving for further information on how to obtain a s22A determination.




□ Yes - I acknowledge that an environmental offset must be provided for any prescribed activity assessed as
having a significant residual impact on a prescribed environmental matter
□ No
Note: The environmental offset section of the Queensland Government’s website can be accessed at www.gld.gov.au for further information on
environmental offsets.




                                                                                                                                       Page 8
                                                                                                    DA Form 1 - Development Application details
                                                                                                                   Version 1.1—22 JUNE 2018

Page 9

  H Yes
□ No
Note: See guidance materials at www. des. gld. gov.au for further information.

Water resources
23.6) Does this development application involve taking or interfering with underground water through an
artesian or subartesian bore, taking or interfering with water in a watercourse, lake or spring, or taking
overland flow water under the Water Act 2000?
□ Yes - the relevant template is completed and attached to this development application and I acknowledge that a
relevant authorisation or licence under the Water Act 2000 may be required prior to commencing development
□ No
Note: Contact the Department of Natural Resources, Mines and Energy at www.dnrme.qld.gov.au for further information.
DA templates are available from https://planning. dsdmip. gld, gov.au/- If the development application involves:
• Taking or interfering with underground water through an artesian or subartesian bore: complete DA Form 1 Template 1
• Taking or interfering with water in a watercourse, lake or spring: complete DA Formt Template 2
• Taking overland flow water: complete DA Form 1 Template 3.
Waterway barrier works
23.7) Does this application involve waterway barrier works?
□ Yes - the relevant template is completed and attached to this development application
□ No
DA templates are available from https.V/planning. dsdmip. gld. gov.au/. For a development application involving waterway barrier works, complete
DA Form 1 Template 4.




I I Yes - an associated resource allocation authority is attached to this development application, if required under
the Fisheries Act 1994
□ No
Note: See guidance materials at www.daf.qld.gov.au for further information.




□ Yes - I acknowledge that a quarry material allocation notice must be obtained prior to commencing development
□ No
Note: Contact the Department of Natural Resources, Mines and Energy at www.dnrme.qld.gov.au and www.business.qld.gov.au for further
information.




□ Yes - I acknowledge that a quarry material allocation notice must be obtained prior to commencing development
□ No
Note: Contact the Department of Environment and Science at www.des.qld.qov.au for further information.




□ Yes - the ‘Notice Accepting a Failure Impact Assessment’ from the chief executive administering the Water
Supply Act is attached to this development application
□ No
Note: See guidance materials at www.dnrme.qld.gov.au for further information.




                                                                                                                                         Page 9
                                                                                                      DA Form 1 - Development Application details
                                                                                                                     Version 1.1—22 JUNE 2018

Page 10

□ Yes - the following is included with this development application:
    □ Evidence the proposal meets the code for assessable development that is prescribed tidal work (only required
       if application involves prescribed tidal work)
       D A certificate of title
□ No
Note: See guidance materials at www.des.qld.gov.au for further information.




□ Yes - details of the heritage place are provided in the table below
□ No
Note See guidance materials at www.des.qld.Qov.au for information requirements regarding development of Queensland heritage places.

Name of the heritage place:                                                        Place ID:




□ Yes - this development application demonstrates how the proposal meets the code for a development
application for a brothel under Schedule 3 of the Prostitution Regulation 2014
□ No
Decision under section 62 of the Transport Infrastructure Act 1994
23.15)
□ Yes - this application will be taken to be an application for a decision under section 62 of the Transport
Infrastructure Act 1994 (subject to the conditions in section 75 of the Transport Infrastructure Act 1994 being
satisfied)
□ No




PART 8 - CHECKLIST AND APPLICANT DECLARATION


I have identified the assessment manager in question 15 and all relevant referral
requirement(s) in question 17
                                                                                                                    □ Yes
Note: See the Planning Regulation 2017 for referral requirements
If building work is associated with the proposed development, Parts 4 to 6 of DA Form 2-                            □ Yes
Building work details have been completed and attached to this development application                              El Not applicable
Supporting information addressing any applicable assessment benchmarks is with
development application
                                                                                                                    □
Note: This is a mandatory requirement and includes any relevant templates under question 23, a planning report          Yes
and any technical reports required by the relevant categorising instruments (e.g. local government planning
schemes, State Planning Policy, State Development Assessment Provisions). For further information, see DA
Forms Guide: Planning Report Template.
Relevant plans of the development are attached to this development application                                      0
Note: Relevant plans are required to be submitted for all aspects of this development application. For further          Yes
information, see DA Forms Guide: Relevant plans.
The portable long service leave levy for QLeave has been paid, or will be paid before a                             □ Yes
development permit is issued (see2i))                                                                               EJ Not applicable




                                                                                                                                          Page 10
                                                                                                        DA Form 1 - Development Application details
                                                                                                                       Version 1.1 —22 JUNE 2018

Page 11

   By making this development application, I declare that all information in this development application is true and
correct
   Where an email address is provided in Part 1 of this form, I consent to receive future electronic communications
from the assessment manager and any referral agency for the development application where written information is
required or permitted pursuant to sections 11 and 12 of the Electronic Transactions Act 2001
Note: It is unlawful to intentionally provide false or misleading information.
Privacy - Personal information collected in this form will be used by the assessment manager and/or chosen
assessment manager, any relevant referral agency and/or building certifier (including any professional advisers
which may be engaged by those entities) while processing, assessing and deciding the development application.
All information relating to this development application may be available for inspection and purchase, and/or
published on the assessment manager’s and/or referral agency’s website.
Personal information will not be disclosed for a purpose unrelated to the Planning Act 2016, Planning Regulation
2017 and the DA Rules except where:
• such disclosure is in accordance with the provisions about public access to documents contained in the Planning
     Act 2016 and the Planning Regulation 2017, and the access rules made under the Planning Act 2016 and
     Planning Regulation 2017; or
• required by other legislation (including the Right to Information Act 2009); or
• otherwise required by law.
This information may be stored in relevant databases. The information collected will be retained as required by the
Public Records Act 2002.


PART 9 - FOR OFFICE USE ONLY

Date received:                                         Reference number(s):



Prescribed assessment manager
Name of chosen assessment manager
Date chosen assessment manager engaged
Contact number of chosen assessment manager
Relevant licence number(s) of chosen assessment
manager




Description of the work
QLeave project number
Amount paid ($)
Date paid
Date receipted form sighted by assessment manager
Name of officer who sighted the form




                                                                                                                     Page 11
                                                                                   DA Form 1 - Development Application details
                                                                                                  Version 1.1—22 JUNE 2018

Page 12

                                                                         Noosa Shire Council
                                                                         PO Box 141 TEWANTINQLD 4565 Ph 07 5329 6500
                                                                                      ABN: 97 969 214 121




 Receipt No:                1205336                                                         Cashier Id: KRIVERA                                               Receipt Date:            27/03/2018
                                                                                                                                                **We reserve the right to further consideration**




                              Mr NA McMenamin
                              Unit 1 / 46 Lysaght Street
                              COOLUM BEACH OLD 4573




                                                                                             RECEIPT
Description                               Property              Application                    Reference                            Narrative/Qtv                                  Amount
Receipt                                                         Bags                          BAGS006952                            Cash Bond -                                    $500.00
                                                                                                                                    Domestic Crossover

Receipt                                     160301              Rams                          RRP18/0025                            Domestic and                                   $183.00
                                                                                                                                    Private Driveway /
                                                                                                                                    Crossover
          To Rams: 14 Grosvenor Tee NOOSA HEADS
          OLD 4567
                                                                                                                                               Transaction Total:                             $683.00



                             CAoi f?ae=. &£ '                                                                                                    Aon' ft£S.




Amounts Tendered

                    Cash                                Cheque                           Db/Cr Card                            Money Order                              Agency                      Total
                    $0.00                               $683.00                               $0.00                                  $0.00                               $0.00                   $683.00

                                                                                                                                                                      Rounding:                     $0.00
                                                                                                                                                                       Change:                      $0.00

                                                                                                                                                                           Nett:                 $683.00


Acceptance of a cheque and the issue of a receipt therefore is conditional on the collection of proceeds and until collection, no credit is to be given or implied.

                                                                           Credit Card Payments - a service fee of 0.50% (exc GST) applies

Page 1 of 1                                                                                                                                                       Printed 27/03/2018 9:11:01AM

Page 13

LINDSAY CONSULTING PTY LTD
STRUCTURAL AND CIVIL ENGINEERS
2c/82 Parker St, Maroochydore PH: (07) 54792118
ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED
As Trustee For The Lindsay Family Trust

This email message has been prepared for and is intended only for the addressee(s). If you are not the intended recipient please notify the sender by reply email and
immediately delete this email .This email message is provided to the recipient on a confidential basis and information, including any attachments, is not to be copied,
quoted or distributed to any other person without the prior written consent of Lindsay Consulting Pty Ltd.



From: Monkeith Kadhum <monkeith.kadhLim(5)noosa.qld.gov.au>
Sent: Thursday, 26 November 2020 4:13 PM
To: Dave Turnbull <Dave(5)lindsavconsulting.com.au>
Subject: FW: 14 GrosvenorTce Driveway, Noosa Heads

Hi Dave,
Following discussions with other relevant officers, Council has no objection for the driveway to match the
general profile of the existing swale and the grassed verge. Any changes to the levels of the grassed verge
should be kept to the minimal and ensuring NO adverse impact on the health and long-term survival of the
existing street trees.

I understand the proposal will not result in stormwater ponding on the grassed verge and/or the proposed
driveway. Also, I understand the street stormwater flows run to the north toward No 12 Grosvenor Tee, so it
is unclear how flows will pass the driveway for No 12 in the absence of access pipe, these issues need to
be investigated, assessed and addressed appropriately.

To note, there is currently an OPW application for the constructed vehicle crossover that is in its early
stages of assessment.

Regards,

Monkeith Kadhum
Development Engineer I Environment Engineering Assessment I Noosa Council

Phone:     07 5329 6293
Email:    [email protected]
Website: www.noosa.qld.aov.au
Location: Level 3, 9 Pelican Street, Tewantin
Mail:     PO Box 141 Tewantin Old 4565
           Find Council on Facebook D



             NOOSA COUNCIL

From: Dave Turnbull <Dave(5)lindsavconsulting.com.au>
Sent: Wednesday, 25 November 2020 10:45 AM
To: Monkeith Kadhum <monkeith.kadhum(5)noosa.aid.gov.au>
Subject: 14 GrosvenorTce Driveway

Monkeith,

See attached design allowing for flow over the crossover in the verge as requested. Can you please advise
if the client construct this driveway.

Kind Regards,

Dave Turnbull



                                                                                              2

Page 14

LINDSAY CONSULTING PTY LTD
STRUCTURAL AND CIVIL ENGINEERS
2c/82 Parker St, Maroochydore PH: (07) 54792118
ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED
As Trustee For The Lindsay Family Trust

This email message has been prepared for and is intended only for the addressee(s). If you are not the intended recipient please notify the sender by reply email and
immediately delete this email .This email message is provided to the recipient on a confidential basis and information, including any attachments, is not to be copied,
quoted or distributed to any other person without the prior written consent of Lindsay Consulting Pty Ltd.



From: Monkeith Kadhum <[email protected]>
Sent: Thursday, 26 November 2020 4:13 PM
To: Dave Turnbull <Dave(5)lindsavconsulting.com.au>
Subject: FW: 14 Grosvenor Tee Driveway, Noosa Heads

Hi Dave,
Following discussions with other relevant officers, Council has no objection for the driveway to match the
general profile of the existing swale and the grassed verge. Any changes to the levels of the grassed verge
should be kept to the minimal and ensuring NO adverse impact on the health and long-term survival of the
existing street trees.

I understand the proposal will not result in stormwater ponding on the grassed verge and/or the proposed
driveway. Also, I understand the street stormwater flows run to the north toward No 12 Grosvenor Tee, so it
is unclear how flows will pass the driveway for No 12 in the absence of access pipe, these issues need to
be investigated, assessed and addressed appropriately.

To note, there is currently an OPW application for the constructed vehicle crossover that is in its early
stages of assessment.

Regards,

Monkeith Kadhum
Development Engineer I Environment Engineering Assessment I Noosa Council

Phone:      07 5329 6293
Email:    [email protected]
Website: www.noosa.qld.qov.au
Location: Level 3, 9 Pelican Street, Tewantin
Mail:     PO Box 141 Tewantin Old 4565
           Find Council on Facebook Q



             NOOSA COUNCIL

From: Dave Turnbull <Dave^lindsavconsulting.com.au>
Sent: Wednesday, 25 November 2020 10:45 AM
To: Monkeith Kadhum <monkeith.kadhum(5)noosa.qld.gov.au>
Subject: 14 Grosvenor Tee Driveway

Monkeith,

See attached design allowing for flow over the crossover in the verge as requested. Can you please advise
if the client construct this driveway.

Kind Regards,

Dave Turnbull
                                                                                     2

Page 15

STORMWATER DRAINAGE NOTES
1.ANY CHANGES SHALL BE APPROVED BY THE ENGINEER IN WRITING PRIOR TO CARRYING OUT                                                                                                                                                                                                                    DANLEY KEY JOINT WITH                       20 X 40 JOINT SEALANT
OF THE WORKS                                                                                                                                                                                                                                                                                        R12 DOWELS AT 300CRS
2.ALL LEVELS TO AHD.
3.ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.                           DRIVEWAY TO BE CONSTRUCTED PER               ^                                                       VERGE TO BE SHAPED TO
A.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON-SITE BEFORE WORK COMMENCES.
                                                                                      RS-049. LEVELS SHOWN IN LONGSECTION        .Jv                                                       DIRECT GROUND WATER THROUGH
                                                                                                                                                                                           LOW POINT IN DRIVEWAY (SEE DETAIL)
                                                                                                                                                                                                                                                                                                             f            TYPICAL KEY JOINT
                                                                                                                                                                                                                                                                                                                              Not to scale
5. DIMENSIONS SHALL NOT BE OBTAINED BY SCALING THE DRAWING.
                                                                                                                                                                                                                                                                                                             CUT EVERY SECOND WIRE DIRECTLY                                  LINDSA Y CONSUL TING pry
                                                                                                                                                                                                                                                                                                                                                                                                  /. rn
6. FOR BUILDING SET-OUT REFER ARCHITECTURAL DRAWINGS                                                                                                                                                                                                                                                         UNDER JOINT AND DEPRESS FABRIC LOCALLY
                                                                                                                                                                                                                                                                                                                                                                             C Structurs! £ Q4vJI Engineers}
7. THE LOCATION AND DEPTH OF ALL SERVICES SHALL BE VERIFIED ON SITE WITH THE                     &                                                                                                                                                                                                                                                                                                                     RPEQ 4928
REVLEVANT AUTHORITY PRIOR TO THE COMMENCEMENT OF WORKS                                                                                                                                                                                                                                                                                                                       OFF. 2C/82 PARKER^STREET. MAROO^YDORE   PH 54 792 118

8. DURING CONSTRUCTION BARRIERS, LIGHTS & SIGNS SHALL BE MAINTAINED TO ENSURE SAFE                                                                                                                                                                                                                                                                             i            THIS DRAWING REMAINS/fhE PROPERTY OF
                                                                                                                                                                                                                                                                                                                             SAW CUT - ISC)                                 LINDSAY CONSULTING PTY LTD AND IS FOR
PASSAGE OF TRAFFIC AND PEDESTRIANS IN ACCORDANCE WITH THE REQUIREMENTS OF THE                                                                                                                                                                                                                                                    Not to Seal*

                                                                                                                                                                                                                                                                                                                 SAW CUTS (USING A SOFT CUT SAW)                              THE SOLE USE OF THE CLIENT. NO PART
LOCAL AUTHORITY.                                                                                                                                                                                                                                                                                                                                                            MAY BE USED IN PART OR WHOLE WITHOUT
                                                                                                                                                                                                                                                                                                                 SHALL BE INSTALLED WITHING 8HRS
9.ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT LOCAL AUTHORITIES
SPECIFICATIONS AND STANDARDS.
                                                                                                                                   s#                                                                                                                                                                            OF CONCRETE PLACEMENT. WHERE AMBIENT
                                                                                                                                                                                                                                                                                                                 TEMP IS GREATER THAN 32 DEGREES
                                                                                                                                                                                                                                                                                                                                                                               PRIOR EXPRESS WRITTEN CONSENT OF
                                                                                                                                                                                                                                                                                                                                                                                   LINDSAY CONSULTING PTY LTD
10.THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL RELEVANT AUTHORITIES                                                                                                                                                                                                                                    THIS TIME SHALL BE REDUCED TO 4 HOURS                     CLIENT AND PROJECT DESCRIPTION
AND PAYING ALL FEES NECESSARY BEFORE COMMENCING WORK, FOR LOCATING ALL EXISTING                                                                                                                                                                                                                                                                 -SL72 FABRIC (CENTRAL)
SERVICES AND FOR REPAIR OF ANY SERVICES DAMAGED AS A RESULT OF THE FOOTPATHS                                                                                                     RETAINING WALLS BY OTHERS                                                                                                                                                                   NOEL MCMENAMIN
AND PRIVATE PROPERTY SHALL BE REINSTATED TO THEIR ORIGINAL CONDITION.                                                                                                                                                                                                                                                                                                        DRIVEWAY DESIGN
11.ANY OBSOLETE/REDUNANT DRIVEWAY CROSSINGS AND DRAINAGE OUTLETS FROM THE                                                                                                                                                                                                                                                                                                    14 GROSVENOR ICE
KERB AND CHANNEL INCLUDING ASSOCIATED PIPES ACROSS THE FOOTPATH SHALL BE                                                                                                                                                                                                                                                   PAVEMENT DESIGN
                                                                                                                                                                                                                                                                                                                                Not to Seal*
                                                                                                                                                                                                                                                                                                                                                                             NOOSA HEADS
REMOVED AND THE KERB AND CHANNEL AND FOOTPATH REINSTATED TO THE LOCAL                                                                                                                                                                                                                                                                                              !_n
                                                                                                                                                                                                                                                                                                                                                                   On!
AUTHORITIES CURRENT SPECIFICATIONS AND OR STANDARDS
12.THE CONTRACTOR'S ATTENTION IS DRAWN TO THE REQUIREMENTS OF THE WORKPLACE
                                                                                                                                                •IP
                                                                                                                                                                                                                                                                                                    I
HEALTH AND SAFETY ACT 1995. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THIS
                                                                                                                                                                                                                                                                                                                                                                           DRAWING TITLE
ACT AND IN PARTICULAR THE CONTRACTOR TO ENSURE THE REQUIREMENTS OF THIS                                                                                                       200MM WIDE GRATED TRENCH
                                                                                                                                                                              WITH MEDIUM DUTY GRATE
SPECIFICATION WITH REGARD TO 'NOTIFICATION IN RELATION TO A NOTIFIABLE PROJECT ARE                                                                                                                                                                                                                                                                                           DRIVEWAY DESIGN
FULFILLED.
13.BENCHING OF PIT STRUCTURES SHALL HAVE A SMOOTH FINISHED SURFACE, AND PIPES
                                                                                                                                                IF.F.L - 15.050ll
SHALL NOT PROJECT INSIDE THE SHAFT OF THE PIT.
K.STORMWATER DRAINAGE PIPES SHALL BE UPVC PIPE (MINIMUM SEWER CLASS SN8) TO AS                                                                                                                                                                                                                                                                                             SCALES
14. 1260 OR APPROVED EQUIVALENT. MINIMUM COVER TO ROOFWATER PIPES SHALL BE 50mm
EXCEPT WHERE REDUCED COVER IS REQUIRED TO DISCHARGE TO THE KERB AND CHANNEL.
15.MINIMUM PIPE GRADES FOR STORMWATER AS 3500 PART 3: PIPES SHALL COMPLY WITH                                                                                                                                                                                                                                                                                                                                  5
              - 1.0% (MIN) GRADE FOR PIPES < 150 DIA.
                                                                                                                                                                                                                                                                                                                                                                                                              J
              - 0.5% (MIN) GRADE FOR PIPES > 150 BUT < 375 DIA.
16.CONCRETE DRIVEWAY AND PARKING AREAS SHALL BE CONSTRUCTED WITH 32 MPa                                                                                                                                                                                                                                                                                                             Orig. 1:200
17.REFER HYDRAULIC DRAWINGS FOR SANITARY DRAINAGE LAYOUTS.
18.COMPACTION OF MATERIAL UNDER CONCRETE DRIVEWWAYS AND PARKING AREAS SHALL BE
            (I) 75% MINIMUM DENSITY FOR COHESIONLESS MATERIAL (AS 1289 E5.1) AND
              (ii) 90% RELATIVE DRY DENSITY (STD COMP.) FOR MATERIAL OTHER THAN (i)                                                                                                                                                                                                                                                                                        SURVEY DATUM
GENERAL NOTES (SOME MAY NOT APPLY)                                                                                                                    QJ
                                                                                                                                                      07
I. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANTS                                                                          -s
DRAWINGS AND SPECIFICATIONS. 2. BEFORE PROCEEDING WITH THE WORK ANY DISCREPANCIES
                                                                                                                                                      O                                                                                                                                                                                                                    ASSOCIATED CONSULTANTS
IN THE CONTRACT DOCUMENTS SHALL BE REFERRED FOR DECISION TO THE ENGINEER.                                                                                                                               -S
                                                                                                      B99                                          X3                                                   s
3. DO NOT SCALE FROM DRAWINGS IF IN DOUBT, ASK!!                                                                                                      S
                                                                                                 STANDARDS 2                                                                                            CO
4. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF SERVICES, ALL DIMENSIONS AND LEVELS                                             U_NZ)
                                                                                                                    UL°))                (fo
5. ALL MATERIALS & WORKMANSHIP SHALL BE IN ACCORDANCE WITH AS2890, THE (INCLUDING
                                                                                                                                                           «£
                                                                                                                                                                                                                       /
THE QUEENSLAND SUPPLEMENT), THE QUEENSLAND BUILDING ACT AMENDMENT ACT 1991 AND                                                                                                                                                                                                                           B99
6. THE CONTRACTOR IS RESPONSIBLE TO OBTAIN RELEVANT APPROVALS PRIOR TO                                                                                                                                                                                                                              STANDARDS 2004 (AU_NZ)
                                                                                                                                                                                                                                                                                     (Col)
7. ALL STORMWATER CULVERTS TO BE RCP CLASS 2. ALL ROOFWATER PIPES TO BE uPVC
8. SILT MANAGEMENT PLAN TO REMAIN IN PLACE UNTIL COMPLETION OF WORKS AND
                                                                                                                                                            2000 2000 2000 2000 2000 2000 2000                                                                           B92
9. ALL PROPOSED OPERATIONAL WORKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH                                                                                                                                                                                                                           Ground Clearance (units: mm)
COUNCIL'S OPERATIONAL WORKS APPROVAL LETTER AND COUNCIL'S DECISION                                                                                                                                                                                                                                  Part #       Front    Wheelbase              Rear
10.CONCRETE KERB RAMPS SHALL BE ALIGNED TO COMPLY WITH COUNCIL'S STANDARD                                                                                                                                                                                                                               #1        120        120                  120
DRAWING AND SHALL BE CONSTRUCTED STRICTLY IN ACCORDANCE WITH COUNCIL STANDARD
II. ALL TEMPORARY AND PERMANENT ROAD SIGNS AND LINEMARKING SHALL COMPLY WITH
THE CURRENT MANUAL OF UNIFORM TRAFFIC CONTROL DEVICESIM.U.T.C.D.). EXISTING LINE
MARKING SHALL BE REMOVED BY GRINDING NOT"BLACKING OUT". COUNCIL DOES NOT
APPROVE OF BLACKING OUT OF EXISTING LINE MARKING. KERB MARKERS SHALL BE PROVIDED
FOR ALL WATER, TELSTRA AND ANY OTHER SERVICE CONDUIT ROAD CROSSINGS AS                                                                                                                                                                                                                                                                                                    REVISION UST
                                                                                                                                                                                                                                                                                                                                                                          A ORIGINAL ISSUE                               09/09/;!)
APPLICABLE.
                                                                                                                                                                                                                                                                                                                                                                          B REVISED
 VEGETATION PROTECTION NOTES                                                                                                                                                                                                                                                                                                                                                                                             11/11/20

1. TREES LOCATED ALONG THE FOOTPATH SHALL BE, TRANSPLANTED PRIORTO
CONSTRUCTION, OR REPLACED IF DESTROYED.
2. WHEN WORKING WITHIN 4m OF TREES, RUBBER OR HARDWOOD GIRDLES SHALL BE                     PROPOSED PAVEMENT LEVEL
CONSTRUCTED WITH 1.8m BATTENS CLOSELY SPACED AND ARRANGED VERTICALLY FROM                   KEY JOINT
                                                                                            SAW JOINT
                                                                                                                                     DRIVEWAY DESIGN
                                                                                                                                                                                                                                                                  It it ttM rMponsibilty of tho
GROUND LEVEL. GIRDLES SHALL BE STRAPPED TO TREES PRIOR TO CONSTRUCTION AND                                                                                                                                   Protect your
                                                                                                                                                                                                                                       MUST BillHOTTED OF
                                                                                                                                                                                                                                                                  Foroman to contact tht
                                                                                                                                                                                                             PERSONAL
                                                                                                                                                                                                                            CHANGES PUNS. F NOT. AS CONSTRUCTED
REMAIN UNTIL COMPLETION.                                                                                                                                        WARHNG
                                                                                                                                                                                                             HTERESTS.      ORA      WEL NOT BE ISSUED            wcortnin too met location of
                                                                                                                                                                                                                                                                  ••nrfcaN prior to conotruction.
                                                                                                                   NOTE                                         DC CONTRACTOR SHALL CONFIRM THE
3. TREE ROOTS SHALL BE TUNNELLED UNDER, RATHER THAN SEVERED. IF ROOTS ARE                      DIAL BEFORE         ANT RBMCAMT DMVEW.AY CROSSOVERS AM           LOCATION V ALL EMCTMO SERVOS ON
                                                                                                                   ORAMAOE OUTLETS FROM THE                     AM         I TO THE SHE MOUCMS
                                                                                                                                                                                                                                                                                                                                                                         Computer File
SEVERED THE DAMAGED AREA SHALL BE TREATED WITH A SUITABLE FUNGICIDE. CONTACT
RELEVANT COUNCIL ARBORIST FOR FURTHER ADVICE.
                                                                                               YOU DIG             THE
                                                                                                                                   ANT ASSOCIATED PVCS
                                                                                                                   ACROSS THE FOOTWAY TO IE REMOVED AM
                                                                                                                            AM CHANNa AM FOOTWAY
                                                                                                                                                                WATER HAMS, SEWER KARS. OAS HAMS,

                                                                                                                                                                CARLES. AM STORMWATER FVES. ANY
                                                                                                                                                                                                                            All proposed operational works shall be constructed
                                                                                                                                                                                                                            in accordance with Council's Operational Works approval
                                                                                                                                                                                                                            letter and Council's Decision Notice - Development Permit.
                                                                                                                                                                                                                                                                                                                                                                                         2010000W.DWG
                                                                                               wu/uv 1WO.com.au         ATED TO LOCAL AUTHONmES CURRENT         OAMAOE TO EXBTMO SERVOS SHALL RE
                                                                                                                                                                REPAIRED AT THE CONTRACTORS *--------
                                                                                                                                                                                                                                                                                                                                                                         DRAWING NUMBER                                SHEET   REV.

4. ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN BY AN APPROVED ARBORIST.                                                                                                                                                                                                                                                                                                                20-1000-F1                    1      B

Page 16

 

LINDSAY CONSULTING *;,

  
 

RPEG 4928

PH 54 792 116

 

 

OFF. 2¢782 PARKER MIREET, MAROOAYOORE

 

 

THIS DRAWING REMAINS/THE PROPERTY OF
LINDSAY CONSULTING PTY LTD AND IS FOR
THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD

 

  

PROFILE REQUIRED FOR Q10 = ~ .125M2)

PROFILE REQUIRED FOR Q100 VOLUMES (AREA - .165M2)

 

 

CLIENT AND PROJECT DESCRIPTION
NOEL MCMENAMIN
DRIVEWAY DESIGN

14 GROSVENOR TCE
NOOSA HEADS

 

 
  

 

DESIGN PROFILE (.2007 M2)

 
 

DRIVEWAY “SWALE" (N.

DRAWING TITLE
SWALE DETAIL

 

 

SCALES
] 5
a
Orig. 1:200

 

SURVEY DATUM

 

ASSOCIATED CONSULTANTS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

REVISION LIST
‘A [ORIGINAL ISSUE 09/09/20
B | REVISED 1/1720
fomputer File

2010000W.0WG
‘DRAWING NUMBER SHEET] REV.

20-1000-F1 1/B

 

 

 

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.