Council archive · source document
OPW14/0282 - Application for operational works - 10 The Anchorage, Noosaville
OPIJ/4-/0Z&2.
Department of State Development. Infrastructure and Planning
IDAS form 1-Application details
(Sustainable Planning Act 2009 version 4.1 effective 4 July 2014)
This form must be used for ALL development applications.
You MUST complete ALL questions that are stated to be a mandatory requirement unless
otherwise identified on this form.
For all development applications. you must:
complete this form (IDAS form 1-Application details)
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required
to accompany your application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009
(SPA) or the Sustainable Planning Regulation 2009.
This form and any other IDAS form relevant to your application must be used for development
applications relating to strategic port land and Brisbane core port land under the Transport
Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal)
Act 2008. Whenever a planning scheme is mentioned, take it to mean land use plan for the
strategic port land. Brisbane core port land or airport land.
PLEASE NOTE: This form is not required to accompany requests for compliance
assessment.
his form can also be completed online using MyDAS at www.dsdjp.gld.gov.ayIMyDAS
IMandatOry requirements
pplicant details (Note: the applicant is the person responsible for making the application
nd need not be the owner of the land. The applicant is responsible for ensuring the
mformation provided on alilDAS application forms is correct. Any development permit or
preliminary approval that may be issued as a consequence of this application will be issued t
he a Iicant.
Namels (individual or company name
in full)
For companies. contact name
Postal address
Contact phone number
10:1.
Mobile number (non-mandatory
requirement)
Fax number (non-mandatory
requirement) 0,
Great state. Great opportunity.
Queensland
f" •••• _. __ •••••
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 13 pages
Page 2
Email address (non-mandatory
requirement)
Applicant's reference number (non-
mandatory requirement)
What is the nature of the development proposed and what type of approval is
bein sou ht?
able A-Aspect 1 of the application (If there are additional aspects to the application please
list in Table B-As ect 2.
What is the nature of the development? (Please only tick one box.) I
Material change of Reconfiguring a lot Building work JOperational work
use
b) What is the approval type? (Please only tick one box.) /
Preliminary approval Preliminary approval Development
under s241 of under s241 and permit
SPA s242 of SPA
Provide a brief description of the proposal, including use definition and number of
buildings or structures where applicable (e.g. six unit apartment building defined as a
multi-unit dwellin ,30 lot residential subdivision etc.
D(L \V E.WAY. - (k"MovG hI <;.T\l\j{, i CoN:> T(LlJ~ Nbw
What is the level of assessment? (Please only tick one box.)
Impact assessment Code assessment v
able B-Aspect 2 of the application (If there are additional aspects to the application please
ist in Table C-Additional as ects of the a lication.
) What is the nature of development? (Please only tick one box.)
Material change of Reconfiguring a lot Building work Operational work
use
What is the approval type? (Please only tick one box.)
Preliminary approval Preliminary approval Development
under s241 of under s241 and permit
SPA s242 of SPA
Provide a brief description of the proposal, including use definition and number of
buildings or structures where applicable (e.g. six unit apartment building defined as a
multi-unit dwellin 30 lot residential subdivision etc.
What is the level of assessment?
Impact assessment Code assessment
able C-Additional aspects of the application (If there are additional aspects to the
lication lease list in a se arate table on an extra a e and attach to this form.
Refer attached Not required
schedule
IDAS form l-Applicalion details
Version 4. 1-4 July 2014
Page 3
Location of the premises (Complete Table D and/or Table E as applicable. Identify
each lot in a se arate row.
rrable D-Street address and lot on plan for the premises or street address and lot on plan for
he land adjoining or adjacent to the premises (Note: this table is to be used for applications
involving taking or interfering with water). (Attach a separate schedule if there is insufficient
lmace in this table.)
Street address and lot on plan (All lots must be listed.)
Street address and lot on plan for the land adjoining or adjacent to the premises
(Appropriate for development in water but adjoining or adjacent to land, e.g. jetty,
oontoon. All lots must be listed.)
Street address Lot on plan Local government
description area
Lot ~nit ~treet r;treet name and Post- Lot no. Plan type e.g. Logan, Cairns)
no. no. bfficial suburb/locality p,de and plan no.
name
I)
ii)
ii)
Planning scheme details (If the premises involves multiple zones, clearly identify the
relevant zone/s for each lot in a se arate row in the below table. Non-mandatorvl.
Lot f.pplicable zone / precinct Applicable local plan / precinct 'pplicable overlay/s
i)
ii)
iii)
Table E-Premises coordinates (Appropriate for development in remote areas, over part of a
lot or in water not adjoining or adjacent to land e.g. channel dredging in Moreton Bay.) (Attach
a seoarate schedule if there is insufficient soace in this table. \
Coordinates Zone Datum Local government
(Note: place each set of coordinates in a separate eferenc area (if
row) e applicable)
Easting Northing Latitude ongitude
GDA94
WGS84
other
. Total area of the premises on which the development is proposed (indicate square
metres
. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm
etc.
IDAS form 1-Application details
Version 4.1-4 July 2014
Page 4
Are there any current approvals (e.g. a preliminary approval) associated with this
a Iication? Non-mandato re uirement
No Yes-provide details below
Date approved (dd/mm/yy) Date approval lapses (ddl
List of approval reference/s mm/vvi
Is owner's consent required for this application? (Refer to notes at the end of this
form for more information.
No
Yes--complete either Table F, Table G or Table H as applicable
[Table F
Name of ownerls of the land I
l!We, the above-mentioned ownerls of the land, consent to the making of this application.
ignature of ownerls of the
and I
Date
able G
Name of ownerls of the land I
The owner's written consent is attached or will be provided separately to the assessment
manaQer.
able H
Name of ownerls of the land I
By making this application, I, the applicant declare that the owner has given written consent to the
makinQof the application.
~. Identify if any of the following apply to the premises (Tick applicable boxles.)
Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)-
complete Table I
On strategic port land under the Transport Infrastructure Act 199~omplete Table J
In a tidal water area-eomplete Table K
On Brisbane core port land under the Transport Infrastructure Act 1994 (No table
requires completion.)
On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table
requires completion)
Listed on either the Contaminated Land Register (CLR) or the Environmental
Management Register (EMR) under the Environmental Protection Act 1994 (no table
requires completion)
[Table I
Name of water body, watercourse or aquifer
~able J
IDAS form 1-Application detai/s
Version 4.1-4 July 2014
Page 5
Lot on plan description for strategic port land Port authority for the lot
able K
Name of local government for the tidal area (if Port authority for the tidal area (if
aoolicable) lDolicable)
Are there any existing easements on the premises? (e.g. for vehicular access,
electrici overland flow water etc
INO Yes--ensure the type, location and dimension of each easement is included in
the plans submitted
No
Is the payment of a portable long service leave levy applicable to this
a Iication? Refer to notes at the end of this form for more information.
Yes
11. Has the portable long service leave levy been paid? (Refer to notes at the end of
this form for more information.
No
Yes---{;omplete Table L and submit with this application the yellow local government!
private certifier's copy of the receipted QLeave form
able L
'\mount paid Date paid ClLeave project number (6 digit
dd/mmlyy) number starting with A, B, E, Lor
P)
Has the local government agreed to apply a superseded planning scheme to this
a Iication under section 96 of the Sustainable Plannin Act 2009?
Yes-please provide details below
Name of local government Dale of written notice Reference number of written
iven by local notice given by local government
overnment (dd/mml if applicable)
vv)
IDAS form l-Applicalion details
Version 4.1-4 July 2014
Page 6
13. List below all of the forms and supporting information that accompany this
application (Include alilDAS forms, checklists, mandatory supporting information etc.
that will be submitted as part of this application. Note: this question does not apply for
a lications made online usin M DAS
Description of attachment or title of attachment Method of lodgement to
ssessment manaaer
r-'•....~ ,. AT Cock••\ E.12-.
14. Applicant's declaration \l ~ /.J" 1 1 1A A "l""': J
I
By making this application, I declare that all information in this application is true and correct
Note: it is unlawful to rovide false or mislead in information
Notes for completing this form
'Section 261 of the Sus/ainable Planning Ac/ 2009 prescribes when an application is a
properly-made application. Note, the assessment manager has discretion to accept an
application as properly made despite any non-compliance with the requirement to provide
mandatory supporting information under section 260(1 )(c) of the Sus/ainable Planning Act
2009
Applicant details
'Where the applicant is not a natural person, ensure the applicant entity is a real legal entity.
Question 1
'Schedule 3 of the Sustainable Planning Regulation 2009 identifies assessable development
and the type of assessment. Where schedule 3 identifies assessable development as
"various aspects of development" the applicant must identify each aspect of the development
on Tables A, Band C respectively and as required.
Question 6
'Section 263 of the Sustainable Planning Ac/ 2009 sets out when the consent of the owner of
the land is required for an application. Section 260(1 )(e) of the Sus/ainable Planning Act 2009
provides that if the owner's consent is required under section 263, then an application must
contain, or be accompanied by, the written consent of the owner, or include a declaration by
the applicant that the owner has given written consent to the making of the application. If a
development application relates to a state resource, the application is not required to be
supported by evidence of an allocation or entitlement to a state resource. However, where
the state is the owner of the subject land, the written consent of the state, as landowner, may
be required. Allocation or entitlement to the state resource is a separate process and will
need to be obtained before development commences.
Question 7
'If the premises is listed on either the Contaminated Land Register (CLR) or the
Environmental Management Register (EMR) under the Environmental Protection Act 1994 it
may be necessary to seek compliance assessment. Schedule 18 of the Sustainable Planning
Regulation 2009 identifies where compliance assessment is required.
Question 11
'The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes
when the portable long service leave levy is payable.
'The portable long service leave levy amount and other prescribed percentages and rates for
calculating the levy are prescribed in the Building and Construction Industry (Portable Long
Service Leave) Regulation 2002.
IDAS form I-Application details
Version 4.1-4 July 2014
Page 7
Question 12
.The portable long service leave levy need not be paid when the application is made, but the
Building and Construction Industry (Portable Long Service Leave) Act 1991 requires the levy
to be paid before a development permit is issued .
• Building and construction industry notification and payment forms are available from any
Queensland post office or agency, on request from QLeave, or can be completed on the
QLeave website at www.qleave.qld.gov.au. For further information contact QLeave on 1800
803481 or visit www.qleave.qld.gov.au.
Privacy-The information collected in this fonm will be used by the Department of State
Development, Infrastructure and Planning (DSDIP), assessment manager, referral agency
andlor building certifier in accordance with the processing and assessment of your
application. Your personal details should not be disclosed for a purpose outside of the IDAS
process or the provisions about public access to planning and development information in the
Sustainable Planning Act 2009, except where required by legislation (including the Right to
Information Act 2009) or as required by Parliament. This information may be stored in relevant
databases. The information collected will be retained as required by the Public Records Act
2002.
OFFICE USE ONLY
Date received 1 IReference
_ 'lUmbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To iCouncil. I have been engaged as the private certifier
____________ ~or the building work referred to in this application
Date of BSA Certification Building
Name
enQaQement icense number lassificationls
QLEAVE NOTIFICATION AND PAYMENT (For completion by assessment manager or
private certifier if applicable.)
Date
receipted
Name of officer
QLeave project '\mount paid orm sighted
Description of the work Date paid who sighted
number $) by
he form
ssessment
manaaer
The Sustainable Planning Act 2009 is administered by the Department of State Development,
Infrastructure and Planning. This form and all other required application materials should be
sent to your assessment manager and any referral agency.
Department of State Development, Infrastructure and Planning
PO Box 15009 City East Old 4002
tol13 OGOV (13 74 68)
jnfo@dsdjn qld gOY au
IDAS form I-Application details
www.dsdip.qld.gov.au Vefsion 4.1-4 July 2014
Page 8
Department of State Development, Infrastructure and Planning
IDAS form 6-Building or operational work
assessable against a planning scheme
(Sustainable Planning Act 2009 version 3.0 effective 1 July 2013)
This form must be used for development applications for building work or operational work
assessable against a planning scheme.
You MUST complete ALL questions that are stated to be a mandatory requirement unless
otherwise identified on this form.
For all development applications, you must:
• complete IDAS form 1-Application details
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required
to accompany your application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009
(SPA) or the Sustainable Planning Regulation 2009.
This form must be used for building work or operational work relating on strategic port land
and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land
under the Airport Assets (Restructuring and Disposal) Act 2008 that requires assessment
against the land use plan for that land. Whenever a planning scheme is mentioned, take it to
mean land use plan for the strategic port land, Brisbane core port land or airport land.
his form can also be completed online using MyDAS at www,dsdjp,qld,goY,ay/MvpAS
IMandatory requirements
1. What is the nature of the work that requires assessment against a planning
scheme? Tick all a licable boxes.
Building work--eomplete Operational work--eomplete Table B
Table A
ableA
What is the nature of the building work (e.g. building, repairing, altering, underpinning,
movln or demolishin a buildin ?
b) Are there any current approvals associated with this application? (e.g. material change of
useA'
VNo Yes- provide details below
List of approval reference/s Date approved (ddl Date approval lapses (ddl
mmlvv\ mmlvv\ .
Great state. Great opportunity.
Queensland
r_ •.~__ ~_.
Page 9
able B
What is the nature of the operational work? (Tick all applicable boxes.)
Road works Stormwater Water infrastructure
Drainage works Earthworks Sewerage infrastructure
Landscaping Signage Clearing vegetation under the planning
scheme
j Other-provide
details
b) Is the operational work necessary to facilitate the creation of new lots? (E.g. subdivision.)
j No Yes-specify
created
the number of lots being I I
~------------
Are there any current approvals associated with this application? (E.g. material change 01
u~.)
JNo Yes-provide details below
List of approval reference/s Date approved (dd/mml Date approval lapses (ddl
vv) mmlvvl
What is the dollar value of the proposed building work?
Inc GST materials and labour.
What is the dollar value of the proposed operational work?
Inc GST materials and labour.
!Mandatory supporting information
Confirm that the following mandatory supporting information accompanies this
a Iication
site plan drawn to an appropriate scale (1:100,1:200 or Confirmed
1:500 are recommended scales) which shows the following:
•
•
•
•
the location and site area of the land to which the
application relates (relevant land)
the north point
the boundaries of the relevant land
the allotment layout showing existing lots, any proposed
lots (including the dimensions of those lots), existing or
I
proposed road reserves, building envelopes and existing
or proposed open space (note: numbering is required for
all lots)
• any existing or proposed easements on the relevant land
and their function
• any access limitation strips
• all existing and proposed roads and access points on the
relevant land.
IDAS form 6-Building or operational worn assessable
against a planning scheme
Version 3.0-1 July 2013
Page 10
statement about how the proposed development addresses Confirmed
he local government's planning schemes and any other
lannin documents relevant to the a Iication.
statement addressing the relevant part(s) of the State
Develo ment Assessment Provisions SOAP. ot a licable
pplications for building work (including extensions and demolition that is assessable
evelo ment
Floor plans drawn to an appropriate scale (1:50,1:100 or e9
1:200 are recommended scales) which show the following: Not applicable
• the north point
• the intended use of each area on the floor plan (for
commercial, industrial or mixed use developments only)
• the room layout (for residential development only) with all
rooms clearly labelled
• the existing and the proposed built form (for extensions
only)
• the ross floor area of each ro osed floor area.
Elevations drawn to an appropriate scale (1:100, 1:200 or
1:500 are recommended scales) which show plans of all
building elevations and facades, clearly labelled to identify
rientation e. . north elevation.
Plans showing the size, location, proposed site cover,
proposed maximum number of storeys, and proposed
maximum height above natural ground level of the proposed
ew buildin work.
Plans showing the extent of any demolition that is assessable Confirmed
evelo men!. Not a licable
pplications for operational work involving earthworks (filling and excavating)
Drawings showing: C m
• existing and proposed contours ot applicable
• areas to be cut and filled
• the location and level of any permanent survey marks or
reference stations used as datum for the works
• the location of any proposed retaining walls on the
relevant land and their height
• the defined flood level (if applicable)
• the fill level if a Iicable.
pplications for operational work involving roadworks
IDAS (01111 6-Building or operational work assessable
against a planning sC/leme
Version 3.0-1 July 2013
Page 11
Drawings showing: Confirmed
• existing and proposed contours i'f'rot applicabie'
• the centreline or construction line showing chain ages,
I'--
---
bearings, offsets if the construction line is not the
centreline of the road and all intersection points
• information for each curve including tangent point
chainages and offsets, curve radii, arc length, tangent
length, superelevation (if applicable) and curve widening
(if applicable)
• kerb lines including kerb radii (where not parallel to
centreline) and tangent point changes (where not parallel
to centreline)
• edge of pavement where kerb is not constructed
• position and extent of channelisatlon
• location and details of all traffic signs, guideposts,
guardrail and other street furniture
• pavement markings including details on raised pavement
markers
• catch pit, manhole and pipeline locations
• drainage details (If applicable)
• cross road drainage culverts (if applicable)
• concrete footpaths and cycle paths
• location and details for access points, ramps and invert
crossings
• chanoes in surfacino material.
,,"pplications for operational work involving stonnwater drainage
Drawings showing: Confirmed _
• existing and proposed contours ( 'Not applicable
• drainage locations, diameters and class of pipe, open
drains and easements
• manhole location, chainage and offset or coordinates and
inlet and outlet invert levels
• inlet pit locations, chainage and offset or coordinates and
invert and kerb levels.
Applications for operational work involving water reticulation
Drawings showing: Confirmed
• kerb lines or edge of pavement where kerb is not -NOt applicable
-~ )
constructed
• location and levels of other utility services where affected
by water reticulation works
• pipe diameter, type of pipe and pipe alignment
• water main alignments
• water supply pump station details (if applicable)
• minor reservoir details (if applicable)
• conduits
• location of valves and fire hydrants
• location of house connections (if applicable)
• location of bench marks and reference oeOs.
Applications for operational work involving sewerage reticulation
IDAS form 6-Buifding or operational work assessable
against a planning scheme
Version 3.()-1 July 2013
Page 12
Drawings showing: Confirmed-:-;---
• location of all existing and proposed services ( 1IIot applicable
• location of all existing and proposed sewer lines and
manhole locations
• location of all house connection branches
• kerb lines or edge of pavement where kerb is not
constnucted
• chainages
• design sewer invert ievels
• design top of manhole levels
• type of manhole and manhole cover
• pipe diameter, type of pipe and pipe alignment
• location of house connections (if applicable)
• sewer pump station details (if applicable) .
Applications for operational work involving street lighting
Drawings showing: Confirmed
• NoTapplicable
location of all light poles and service conduits )
• location of all other cross road conduits
• type of wattage and lighting
• any traffic calming devices
(
-
• additional plans for roundabouts and major roads (if
applicable)
• details of any variations to normal alignment
• details of Iiahtina levels .
Applications for operational work involving public utility services
Drawings showing: Confirmed
•
•
any existing light poles and power poles
any existing underground services
• details of proposed services
(
-
-Not applicatrle.-
---
• alteration to existina services .
Applications for operational work involving landscaping works
Drawings showing: Confirmed
• the location of proposed plant species
• a plant schedule indicating common and botanical names, '-
pot sizes and numbers of plants
-
"Not applicable'
• planting bed preparation details including topsoil depth,
subgrade preparation, mulch type and depth, type of turf,
pebble, paving and garden edge
• the location and type of any existing trees to be retained
• construction details of planter boxes, retaining walls and
fences
• the proposed maintenance period
• irriaation svstem delails .
Privacy-Please refer to your assessment manager, referral agency andlor building certifier
for further details on the use of information recorded in this form.
OFFICE USE ONLY
Date received I IReference
numbers
~-------~
The Sustainable Planning Act 2009 is administered by the Department of State Development,
Infrastnucture and Planning. This form and all other required application materials should be
sent to your assessment manager and any referral agency.
Department of State Development. Infrastructure and Planning
PO Box 15009 City East Old 4002
10113 OGOV (13 74 68)
IDAS form 6-Building or operational work assessable
jnfo@dsdjp aId gOY ay
against a planning scheme
www.dsdip.qld.gov.au Version 3.1)-1 July 2013
Page 13
~~ , ;,
\ ;
I
-- ===::.--..:.:..:..-
()
,.t-.---~-- -/
(1): ,
1 : ~ :;
, -,'I
, ;.; < <I
"I
",i .
>.
II' .
~ : 1 :;,
~
~
~
j
-!) I
"
~]
:'
~I 'j :1
<::>. ,I
,
I ~;
0
,I
~ ' .1 ~ '.
.,,
'\
, 0 :') : i.
::
~ ; "lQ
",
.' -
I' ,
, ' '""
g ~, z Ii:
-~
o- r
-" ~ .1. dJ
;~ l~~
"
) , ,
'"
'f-
,
,j
.,
,I
<J
','j
4 .
~' \
"
"
\
\
/ \,
\,
I i,
.i
\
( •
======ULlJLJ_
--~ ----- --~--~'-. -----
'.
\
/
/ ..// \
hV ~::)/l1~O
r---3N
/
/;c'I:,,"' r. .. \
Ii \ -.
• ~".
-r ,
','
It. i
\\) .'.-
-_ _--_. __ -:==--
.. ..
\ \
',."
I
/".
.-
.~
.'- ..••.
[OCR of page images]
BINWYD
|
|
ee
cNBCYOS Sa,
GuyALruno DZ
i
peng
Page 14
---_.- ._------- --
-
;:
I
-
/
/
,\ (
()
"
.~ -' _J
L--r""'-- ._-\~-...r----1:
--
Used in these records
OPW14/0282 - Application for operational works - 10 The Anchorage, NoosavilleRelated documentApplication case desk ↗
About this file
- File size
- 5.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.