Council’s Reference :      MCU21/0215
Our Reference:             03000 L01 GM
Contact Person:            Greg Martoo



10th March, 2022


Chief Executive Officer
Noosa Council
PO Box 141
TEWANTIN QLD 4565



ATTENTION: DEVELOPMENT ASSESSMENT – Jada Lyons


Dear Jada


RE:         APPLICANT’S RESPONSE TO COUNCIL’S IR
            Development Application Seeking Development Permit for Material change of Use for
            Warehouse and Caretakers accommodation over Land Located at 9 Bartlett Rd
            Noosaville and described as Lot 48 on RP173566


Reference is made to the information request issued by Council and dated 14th January, 2022 (“Council’s
IR”) in response to the above development application.

Council’s IR identified six (6) items of additional information which Council considered are required before
Council can complete its assessment of the above development application.

The applicant has agreed to respond to all six (6) items in Council’s IR as follows:


Item 1:       Provide details of the frequency of after-hours deliveries that warrants the need for 24-
              hour care.

Applicant’s Response: The applicant owns and operates a property development business that
specialises in the construction and fit out of medical and professional suites as well as
specialty shopping complexes, child care centres and the like. The applicant is regularly
sourcing specialist medical, materials and other equipment and products associated with the
construction and fitting out of the properties that develop. There are many significant
challenges associated with the delivery of these products and they require storage until
required.

Due to the high cost of some equipment and the logistics in obtaining these items to ensure
these are available on time for construction and fit out they require secure storage. These
items which in some cases extremely expensive, bulky and hard to source with extensive wait
times due to logistics and overseas delivery issues.

The reason that the applicant is undertaking the construction of this property is because the
equipment requires storage in a monitored and highly secure premises.

The applicant will be sleeping on site when equipment is being delivered and stored to ensure
the security of the equipment. The caretaker’s accommodation (which is essentially
subordinate to the primary storage use) will be used sporadically perhaps to approximately 14
Log in to download the original file

L01 to NC -response to IR.pdf · 791 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 2 pages

Page 2

days at a time. During daylight hours the applicant will be based in the on-site office for
Tenancy 1 or will be at the applicant’s home address.

Tenancy 1 has been intentionally designed so the warehouse, office and caretakers
accommodation are fully integrated and suited to one occupant only. This should be evident
by a review of the enclosed set of architectural plans by Sprout Architects (refer to Attachment
1).


Item 2:     Provide details, prepared by a RPEQ (Registered Professional Engineer of
            Queensland), of the proposed earthworks, including, but not limited to: extents;
            volumes; existing and finished levels; cross-sections; batters and/or retaining
            structures; stabilisation methods proposed, etc.

Applicant’s Response: The applicant also engaged Bax Engineering Pty. Ltd. to respond to this item.
Bax Engineering Pty. Ltd. has compiled the enclosed set of civil plans for project number 124-003. Council
is directed to the Catchment Layout Plan numbered 124-003-200 and 124-003-201 and 124-003-250
and124-003-251 (refer to Attachment 2) as well as related information in the attached documents.

Certain information in relation to proposed earthworks has also been clouded in red in the ground level floor
plan in the enclosed set of architectural plans by Sprout Architects (refer to Attachment 1)


Item 3:     Provide a preliminary Stormwater Management Plan for the site, including details of
            collection and discharge of stormwater runoff from the buildings and the hardstand
            areas and any required stormwater pipelines/flowpaths within the site to drain low areas
            on the adjoining properties to prevent stormwater ponding.

Applicant’s Response: The applicant also engaged Bax Engineering Pty. Ltd. to respond to this item.
Bax Engineering Pty. Ltd. has compiled the enclosed report titled “Site Based Stormwater Management
Plan” and dated 6th February, 2022. (refer to Attachment 3)

Relevant information in this regard has also been clouded in red in the ground level floor plan in the enclosed
set of architectural plans by Sprout Architects (refer to Attachment 1)

The report by Bax Engineering has reviewed the pre and post development scenario for the hydrology
of the catchments for the subject and external catchments and concluded that the proposal …’will
result in non-actionable nuisance of stormwater runoff quantities with minor flows to outlet to the
existing stormwater pipe network in the rear of the property. This system will be upgraded to accept
the proposed calculated flows.

Due to the proposed design of the building, overland flows from major events will be diverted to the Bartlett
Road frontage in the north. This will ensure any pipe blockages will not create flooding to the tenancies.’


Item 4:     Provide amended plans which include the creation of an easement over the existing
            stormwater infrastructure on the subject site.

Applicant’s Response: The applicant also engaged Bax Engineering Pty. Ltd. to also respond to this item.
Bax Engineering Pty. Ltd. has compiled the enclosed set of civil plans for project number 124-003. (refer to
Attachment 2) Council is directed to the Catchment Layout Plan numbered 124-003-400 – A in this set of
drawings.

The possible metes and bounds for the easement required to be registered over the existing relevant
stormwater infrastructure is shown approximately by dashed lines on this particular plan. It should be noted
that the determining factor is the constructed location of the stormwater infrastructure which is based on a
site and detail survey by Skyline Surveys.

The ground floor plan in the enclosed set of architectural plans by Sprout Architects (refer to Attachment 1)
has also clouded in red in the ground level floor plan with respect to this easement.

Page 3

In any regard, Council can condition the required metes and bounds of the easement by reference to the
centre of this existing infrastructure if considered necessary.


Item 5:     Provide amended plans where the proposed development’s driveway location will not
            clash with existing on-street carparking.

Applicant’s Response: The applicant also engaged Bax Engineering Pty. Ltd. to also respond to this item
and the applicant’s architects have modified the proposal plans accordingly. Bax Engineering Pty. Ltd. has
compiled the enclosed set of civil plans for project number 124-003. Council is directed to the set of three
sweep path plan numbered 124-003-800 – A 124-003-801 – A and 124-003-802 – A in this set of drawings.
(refer to Attachment 2)


Item 6:     Alternatively, provide an amended plan indicating how the existing available on-street
            carparks on Bartlett Road won’t be reduced.


Applicant’s Response: The applicant also engaged Bax Engineering Pty. Ltd. to also respond to this item
and the applicant’s architects have modified the proposal plans accordingly. Bax Engineering Pty. Ltd. has
compiled the enclosed set of civil plans for project number 124-003. Council is directed to the set of three
sweep path plan numbered 124-003-800 – A 124-003-801 – A and 124-003-802 – A in this set of drawings.
(refer to Attachment 2)


The applicant has now responded to Council’s IR for this development application and therefore requests that
Council completes its assessment of the above development application based on the information as supplied
to Council by the applicant to date.

Council is welcome to contact me directly on 0409632830 or by email through
[email protected] if Council requires any further information and/or clarification in relation to
any of the above responses or any other matter/s relating to other information supplied in support of the
above development application to date.



Yours faithfully,




Greg Martoo
Principal
martoo consulting pty ltd.



Encl (3)
Attachment 1 – Architectural Plans by Sprout Architects
Attachment 2 – Civil Plans by Bax Engineering
Attachment 3 – Site Based Stormwater Management Plan by Bax Engineering

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.