L01 to NC -response to IR
In any regard, Council can condition the required metes and bounds of the easement by reference to the
centre of this existing infrastructure if considered necessary.
Item 5: Provide amended plans where the proposed development’s driveway location will not
clash with existing on-street carparking.
Applicant’s Response: The applicant also engaged Bax Engineering Pty. Ltd. to also respond to this item
and the applicant’s architects have modified the proposal plans accordingly. Bax Engineering Pty. Ltd. has
compiled the enclosed set of civil plans for project number 124-003. Council is directed to the set of three
sweep path plan numbered 124-003-800 – A 124-003-801 – A and 124-003-802 – A in this set of drawings.
(refer to Attachment 2)
Item 6: Alternatively, provide an amended plan indicating how the existing available on-street
carparks on Bartlett Road won’t be reduced.
Applicant’s Response: The applicant also engaged Bax Engineering Pty. Ltd. to also respond to this item
and the applicant’s architects have modified the proposal plans accordingly. Bax Engineering Pty. Ltd. has
compiled the enclosed set of civil plans for project number 124-003. Council is directed to the set of three
sweep path plan numbered 124-003-800 – A 124-003-801 – A and 124-003-802 – A in this set of drawings.
(refer to Attachment 2)
The applicant has now responded to Council’s IR for this development application and therefore requests that
Council completes its assessment of the above development application based on the information as supplied
to Council by the applicant to date.
Council is welcome to contact me directly on 0409632830 or by email through
[email protected] if Council requires any further information and/or clarification in relation to
any of the above responses or any other matter/s relating to other information supplied in support of the
above development application to date.
Yours faithfully,
Greg Martoo
Principal
martoo consulting pty ltd.
Encl (3)
Attachment 1 – Architectural Plans by Sprout Architects
Attachment 2 – Civil Plans by Bax Engineering
Attachment 3 – Site Based Stormwater Management Plan by Bax Engineering