Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                Total Concept Homes                                                                                 20332-001-Rev1
                                                                                                                     22 March 2021

                boreholes suggests that weathered rock could be expected within 1 m to 1.5 m of the ground surface. Such
                materials may require the use of ripping attachments, or selected pneumatic breaking.

                Temporary batters in natural soils of stiffer (or stiffer) consistency, and future controlled fill may be formed at
                1V:1H; with permanent batters formed no steeper than 1V:2H. Flatter batters may be required if
                groundwater seepage is encountered. Permanent batters will require erosion protection such as covering
                with erosion matting or vegetation. Where spatial constraints prevent adoption of the above recommended
                batter slopes, cut or fill batters would need to be supported by retaining walls.

                The above recommendations do not supersede any existing safety regulations or legislation applicable to
                excavations (e.g. limits on personnel entry into trenches).

                Any excavations required adjacent to existing structures, will need to be specifically designed to ensure that
                the structures are not adversely affected (e.g. 'undermined').

                Ground surfaces should be graded to shed surface water runoff away from construction areas. It should be
                noted that during wet weather, the natural soils may cause turbid stormwater run-off. Appropriate erosion
                and sediment control measures must be installed prior to commencement of earthworks at this site,
                especially given the presence of natural gullies and dams within the site boundary downslope of the
                proposed construction areas.

                4.3     Footing Design
                Footings for the proposed building and any ancillary structures (e.g. retaining walls) must penetrate through
                any future fill to ‘socket’ at least 0.5 m into natural residual soil comprising stiff (or stiffer) clay or a minimum
                of 0.3 m in to weathered rock. Based on the Ground Drill boreholes, depending on the construction
                methodology adopted, normally dimensioned, conventional high-level footings would be appropriate, or
                possibly extended locally via the use of steel reinforced concrete bored piles (or ‘bucket piles’).

                Footings could be designed with an allowable bearing capacity of 100 kPa when founded in stiff (or stiffer)
                natural residual clays or 400 kPa in weathered rock.

                Footing design should also account for the characteristic surface movement (ys), indicated by the site
                classification report by Ground Drill to be equivalent to Class M. The re-use of the site-won clay materials for
                filling works could result in greater estimates of characteristic ground surface movement and should be
                considered by the design engineer once earthworks details have been confirmed.

                All footings should found such that they are not adversely affected by any adjacent excavations, batter
                slopes, trenches, or retaining walls that are not designed to support building loads. Footings should found at
                least below a plane extending 1 m horizontally from the base of trenches/excavations/retaining walls, then
                rising up at 1V:1H, as illustrated in Text Figure 10 overleaf.




                                                                         11/14
Document Set ID: 21426326
Version: 1, Version Date: 24/03/2021
Log in to download the original file

Approved Plans - RAL21-0003.pdf · 11.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.