Original source · versioned page text
Approved Plans - RAL21-0003
The original of this document is very large (11.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnEcological Assessment Report v1 NCES Ref: J000669 Lot 2 on RP131369 – 108 Black Mountain Range Road, Black Mountain way that results in a net gain and enhancement of the overall habitat contained within the regrowth vineforest will more than mitigate against the values of Noosa Shire. minor impacts proposed. AO3.2 Habitat trees, recruitment habitat trees, and roosting, breeding and feeding areas are AO3.2 – No significant habitat trees for native fauna were identified within the protected for native fauna habitat. site. PO4 AO4.1 AO4.1 - A Vegetation Management Plan that details, as a minimum, the Development provides for effective measures during construction Vegetation is protected from disturbance or damage from construction and operation protection measures listed in AO4.1 should be produced by the applicant for and operation to protect ecological values including: activities by: the future Operational Works application and can be conditioned by Council a) avoiding disturbance to or clearing of vegetation in and within the a) clearly marking trees to be retained with flagging tape; with an RoL approval. vicinity of the site; b) installing protective fencing around the dripline of the vegetation and avoid filling b) managing habitat disturbance and physical harm to fauna from and excavating in these fenced areas; noise, vibration, dust, light, dewatering or excavating; and c) ensuring stockpiling, storage and vehicle parking occurs outside the identified c) avoiding clearing in areas where erosion or slippage could occur. vegetation areas; and d) using low impact construction techniques around vegetation. AO4.2 AO4.2 – All existing regrowth vegetation within the site will continue to form a Vegetation which is capable of forming or contributing to a buffer between different land buffer between the site and adjacent land uses. uses or a buffer against pollution, light spillage or noise is retained. AO4.3 Lighting associated with development: AO4.3 - Lighting associated with development shall comply with AO4.3 and can a) does not contribute an unacceptable level of illuminance (greater than 1 lux) for light be conditioned with an approval. sensitive species within or at the boundary of an ecologically important area; and b) does not contribute to an unacceptable level of illuminance on landward horizons b) N/A along coastal areas and known marine turtle nesting beaches. AO4.4 AO4.4 – A small amount of vegetation is to be cleared to construct the upgraded Clearing of vegetation does not involve clearing that may cause or contribute to hillslope access driveway. It is not anticipated that removal of this vegetation is likely to erosion, bank erosion, or slippage. cause or contribute to hillslope erosion, bank erosion, or slippage as the civil engineering works have been designed to prevent erosion without the reliance on vegetation. Connectivity PO5 AO5 The development does not propose any significant volume of vegetation Development is designed and operated to maintain and enhance Development is designed and operated to maintain ecological linkages and maximise clearing. The small amount of vegetation impacted as a result of the driveway connectivity between and across ecologically important areas and opportunity for connectivity and the movement of fauna by: upgrade will be considered minor in the context of the retained extent of connecting habitat and support unimpeded and safe movement of a) ensuring protection of wildlife refuges; vegetation within the site and the surrounding landscape. The development will terrestrial and aquatic fauna. b) maintaining vegetation in patches of the greatest possible size and within the not clear ecologically important areas and therefore will maintain connectivity smallest possible edge-to-area ratio; between and across ecologically important areas and connecting habitat and c) enhancing connectivity through planting and rehabilitation works, including across support unimpeded and safe movement of terrestrial and aquatic fauna. property boundaries, to areas of national park, state forest or reserve; d) avoiding the creation of physical barriers and safety hazards (such as roads, pedestrian access and instream structures) along and within the ecological linkage; e) providing mitigation measures such as wildlife movement infrastructure, fauna exclusion and directional fencing, underpasses/overpasses and traffic calming devices, signage and lighting; and f) where offsets are necessary, delivering offsets that support and enhance ecological linkages. Waterways and Wetlands PO6 AO6.1 AO6.1 The development does not represent potential to clear vegetation within The biodiversity and ecosystem values of waterways, drainage lines, Development and clearing of vegetation does not occur within: the following: wetlands and adjacent riparian zones are protected by: a) a riparian buffer area; a) a riparian buffer area; a) avoiding any new development in a riparian buffer area and b) a wetland area; or b) a wetland area; or wetland area; c) 10 metres either side of the centre line of other waterways identified on a c) 10 metres either side of the centre line of other waterways identified b) retaining aquatic and terrestrial habitat in riparian zones; Biodiversity, Waterways and Wetlands Overlay Map. on a Biodiversity, Waterways and Wetlands Overlay Map. c) maintaining and enhancing wildlife corridors and connectivity along watercourses and drainage lines for native fauna AO6.2 movement; Development provides for the rehabilitation of land within: AO6.2 – Compliance with AO6.2 can be set as a condition of approval. d) avoiding edge effects and damage from adjacent land uses; a) a riparian buffer area; e) maintaining stream integrity and bank stability by minimising b) a wetland area; and bank erosion and slumping; c) 10 metres either side of the centre line of any other waterway identified on a f) maintaining water quality through filtering sediments, Biodiversity, Waterways and Wetlands Overlay Map. nutrients and other pollutants; and © 2021 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.