17 July 2025

Our Ref:              22BRT0122_LT01_C
Council Ref:          OPW25/0042
SARA Ref:

Attention: Daniel Cooper

DPC

Dear Daniel,

RE:        Proposed Resort Complex – 3-7 Serenity Close, Noosa
           Operational Works Application – Bulk Earthworks
           Request for Information to Noosa Council– Traffic Engineering matters

Colliers International Engineering & Design (TTMC) Pty Ltd has been engaged by Development Property
Construction Advisory DPC to prepare the below responses to the issues relating to traffic engineering raised
in the Request for Information (RFI) dated 16th April, 2025 in relation to the proposed resort complex at 3 - 7
Serenity Close, Noosa (subject site). Key traffic-related issues are summarised below.

  Item – Construction Traffic
  A Traffic Impact Assessment has not been provided as part of the application material. Council recognise that the haulage
  operations are likely to cause impacts to the local road network and associated road infrastructure.
  Provide a Traffic Impact Assessment (TIA) to assess the impacts of construction traffic associated with the prescribed works. The
  TIA must be prepared by a suitably qualified person (RPEQ) with Traffic Management Design qualification, in accordance with the
  Department of Transport and Main Roads Guidelines, and must include, but not be limited to:
            a. a Road Safety Audit;
            b. Pavement Impact Assessment;
            c. a Traffic Management Plan – the Traffic Management Plan must be developed in accordance with the Queensland
            Manual of Uniform Traffic Control Devices (MUTCD) and the Queensland Guide to Temporary Traffic Management
            (GTTM);
            d. proposed haulage route – including the scheduled duration of excavation/haulage works, number of haulage vehicles
            exiting the site per hour, and the type of haulage vehicle (i.e., truck or truck and dog); and
            e. the receiving location(s) of the exported spoil.


Colliers Response to Council RFI Item 9(a) – Road safety Audit
A Road Safety Audit will be prepared for the local road component of the haulage route – this will be
provided separately.

Colliers Response to Council RFI Item 9(b) – Pavement Impact Assessment
With regard to Pavement Impacts is important to consider the design parameters for the current pavement
based on road hierarchy as outlined in the Noosa Plan.


Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex                                                                             1
Reference: 22BRT0122
Full text of the other 64 pages

Page 2

It is noted that the Bulk Earthworks scope is to move 1,500m3 of soil daily from the subject site. Typical bulk
haulage trucks are equivalent to a Type 4 heavy vehicle (Austroads) with a carrying capacity of 20m3 of
material. Assuming an average haulage capacity of 20m3, there would approximately 75 loaded and 75
unloaded vehicle movements daily from and to the subject site respectively. The total period of haulage is
estimated at 12 to 14 weeks (6 day per week operation) – equivalent to ~100,000m3 total material removed.

For ‘Distributor’ roads and the majority of ‘Collector’ (higher order) road types, pavements are designed to
have 1x 106 Equivalent Standard Axles (ESA’s) of pavement strength. Based on the total ESAs on the road
network, and given the standard design ESA’s of pavements for the road hierarchy, the overall pavement
impact of truck movements will be between 0.3% (unloaded) to a maximum of ~3% (loaded) for the higher
order roads, which less than the 5% threshold as outlined in DTMR’s documentation. Therefore, the relative
pavement impact of truck movements for the Bulk Earthworks associated with the subject development on
these higher order roads will be negligible and no amelioration is required.

For the minor roads, Serenity Close and Grant Street, detailed pavement impact calculations using the
Department of Transport and Main Roads’ (DTMR’s) Guide to Traffic Impact Assessment Practice Note:
Pavement Impact Assessment has been undertaken. Based on the assessment methodology from DTMR’s
document, the respective truck pavement loadings for these movements are determined as follows:
         Total number of truck movements: 5,000 loaded trips and 5,000 unloaded trips
         Austroads Heavy Vehicle Class: Class 9 up to 19.0m AV
         DTMR PIA ESA parameters:
                o    SAR 4 Granular Pavement
                o    Unloaded SAR – 0.51
                o    Loaded SAR – 4.93
         Marginal Cost: 13.60 cents ($0.136) / SAR-km
         Length of affected road: 0.85 km

Based on the above, there would be a total of 2,168 SARs in the unloaded direction and 20,953 SARs in the
loaded direction. Applying these values to the length of affected road (by direction) and the marginal cost
value, the following pavement impact offset (rehabilitation) costs are noted:
         Loaded direction: $2,850
         Unloaded direction: $295

Noting the assessed pavement impacts noted above, it is recommended that the client arrange for repair of
any minor potholes on the local roads Serenity Close to Grant Street that appear during the haulage period.
It is expected that a Dilapidation Plan will be undertaken with review of the haulage route between the site
up to and including the Grant Street / Noosa Drive roundabout intersection, as well as the key intersection of
Weyba Road / Mary Street / Reef Street roundabout, to identify potential road infrastructure impacts (e.g.
broken kerbs) that may have occurred during the haulage period.
Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 3

Note that this will be used to determine any change / impacts that have occurred during the haulage period
which may or may not been related to the haulage activity.

Colliers Response to Item 9(c) – Traffic Management Plan

Refer to Avada Traffic – Traffic Management Plan

Item 9(d) – Proposed Haulage Route

The proposed haulage route is provided in Figure 1.




Figure 1: Proposed Bulk Haulage Route

This has been determined as the desired route after review / consideration of alternate routes via Eenie
Creek Road > Langura Street > Cooyar Street > Sunshine Beach Road (see Figure 2 overleaf).




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 4

Figure 2: Alternate Bulk Haulage Route Considered


Table 1 below shows a high-level review of the benefits and constraints / issues of both the proposed
haulage route and an alternative haulage route (section in proximity to the site) that was considered.

Table 1: Proposed / Alternate Haulage Route Considerations

                          Benefits                                                Constraints / Issues
                                   Proposed Route – Noosa Dr, Weyba Rd, Reef St, Eenie Creek Rd
           Shortest route to Eumundi Creek Road                 More traffic than Cooyar Street / Eenie Creek with a higher
           Minimises route built up pedestrian areas             local demand of traffic
           Weyba Road is a major road and larger
            vehicles are more common (expected)
           Less travel through residential areas
                            Alternate Route – Sunshine Beach Rd, Cooyar St, Langura St, Eenie Creek Rd
           Less traffic demand on Cooyar Street /               Travelling along Sunshine Beach Road is a highly pedestrianised
            Eenie Creek as opposed to Weyba Road                  area with raised zebra pedestrian (wombat) crossings
                                                                 Greater number of commercial establishments and cinemas
                                                                  (potential noise impacts)
                                                                 Longer route distance to Eumundi Creek Road
                                                                 Noting Saturday operation – potential conflicts with sports
                                                                  precinct at Langura / Eenie Creek




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 5

Based on the reviews undertaken, and from preliminary discussions with Council, the proposed haulage
route is considered to be the most appropriate (compared to the alternate route identified) in terms of
safety (reduced potential risks to the surrounding community and road users), efficiency (shortest route) and
amenity (minimised potential impacts to residential areas and commercial centres).

Additional measures to be considered within the Traffic Management Plan:

         Spacing of truck movements – aiming to reduce occurrences of multiple haulage trucks arriving or
          leaving the subject site at one time
         Community feedback – it is noted that community feedback contact details will be provided as part
          of the Traffic Management Plan (prepared by Avada), additional consideration of regular briefing to
          drivers regarding key issues / feedback provided by community and any adjustments to procedures /
          operations to accommodate.

Any further items / potential measures (including any raised as part of the Road Safety Audit) can be tabled
as part of the operation pre-start meeting(s).

Item 9(e) – Receiving Locations

The receiving locations for the bulk haulage material will be:
         Coolum Industrial Park; and
         Sekisui House, Coolum; and

      Bulk Granite Haulage yard in Caboolture, via the Bruce Highway.




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 6

Traffic Impact Assessment (TIA)

          Development Transport Demand

          Existing Traffic Demand

Colliers conducted traffic counts on Friday, 8th July 2022 and Saturday, 9th July 2022 to establish the existing
traffic volumes during the weekday and weekend peak-hour periods at the following intersections:

         Noosa Drive / Grant Street; and
         Noosa Drive / Coral Tree Avenue; and
         Grant Street / Banksia Avenue.

Separate traffic counts conducted on Thursday, 27th October 2022 and Saturday, 29th October 2025 which
have been provided by Noosa Council for the following intersection:
         Weyba Road / Reed Street / Mary Street.

The following peak periods were as follows:
         Noosa Drive / Grant Street / Sunshine Beach Road:
             o Friday, 8th July 2022
                      AM Peak period:                   8:30am to 9:30am
                      PM Peak Period:                   3:15pm to 4:15pm

                o    Saturday, 9th July 2022
                          PM Peak Period:                  1:00pm to 2:00pm

         Noosa Drive / Coral Tree Avenue:
             o Friday, 8th July 2022
                      AM Peak period:                      9:00am to 10:00am
                      PM Peak Period:                      3:15pm to 4:15pm

                o    Saturday, 9th July 2022
                          PM Peak Period:                  1:00pm to 2:00pm

         Grant Street / Banksia Avenue:
             o Friday, 8th July 2022
                       AM Peak period:                     8:30am to 9:30am
                       PM Peak Period:                     3:00pm to 4:00pm

                o    Saturday, 9th July 2022
                          AM Peak period:                  10:15am to 11:15am




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 7

         Weyba Road / Reef Street
             o Thursday, 27th October 2022
                     AM Peak period:                       7.45am to 8.45am
                     PM Peak Period                        3.00pm to 4.00pm

                o    Saturday, 29th October 2022
                          AM/ PM Peak period:                   11.30am to 12.30pm

Detailed surveyed traffic volumes observed during the weekday / weekend AM and PM peak-hour periods
are attached in Attachment A – Survey Data.

          Development Traffic Demand

The Bulk Earthworks traffic generation is anticipated to be 150 trucks per day, which would have a maximum
of ten (10) vehicles per hour (vph), occurring within the weekday (AM / PM) or weekend peaks.

1.2.1     Traffic Distribution

The distribution of Bulk Earthworks traffic within the surrounding network is based on the proposed route
outlined in the Avada Traffic – Traffic Management Plan and illustrated in Figure 1-1 - see also Attachment B.




Figure 1-1: Traffic Distribution

Based on the above distribution and generation outlined above the traffic generated by the Bulk Earthworks
traffic in the respective peak hour periods is shown in Figure 1-2 - - see also Attachment B.




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 8

Figure 1-2: Traffic Generation (vph)

          Future Transport Demands

          Assessment Years and Traffic Growth

To estimate the future traffic volume for the 2025 scenario, the annual growth rate for the Council has been
determined based on the following:

         The forecasted population volume set out in Section 4.2 of Noosa Shire Economic Development
          Strategy 2021-2030. For Noosa, the population growth between 2020 and 2041 is projected to be
          0.8%.
         The existing and projected demand for the transport network set out in Table SC3.1.7 of Council’s
          LGIP Planning Assumptions Tables.
         For the Coastal Area (Noosa Heads), the existing and projected transport demand vehicle per day
          (vpd) data between 2021 (331,603) and 2031 (369,091) is projected to be 1.08%.

Conservatively, an annual growth rate of 1.2% has been adopted.

Colliers has identified three assessment periods for the road network as follows:

Current Traffic Scenario

This scenario includes the 2022 traffic volumes modelled over the existing road network. This analysis has
been performed for both the AM and PM Peaks.


Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 9

Base Year (2025) Traffic Scenario

This analysis incorporates a 1.2% per annum increase in the background traffic volume for a period of 4
years from the most recent survey. For the base case scenario, the existing road network has been analysed.

Base Year (2025) Traffic Scenario + Earthworks Traffic

Based on the development transport demand estimates (Section 1), traffic network diagrams have been
prepared showing traffic movements on the roads/intersections surrounding the development site for each
of the above scenario’s future year cases. These network diagrams are included in Attachment B – Network
Diagrams with the respective diagrams identified as follows:
    Traffic Network Diagrams 1: 2022 Survey Traffic Volumes

    Traffic Network Diagrams 2: 2025 Base Case Traffic Volumes (Applying 1.2% Growth)

    Traffic Network Diagram 3: 2025 Base + Earthworks Traffic Volumes
     -    This has been calculated by adding estimated Bulk Earthworks traffic volumes to the 2025 Base
          scenario.

It is noted that there will be minor light vehicle traffic associated with on-site management and equipment
operators, however, this will be limited to 4 – 6 personnel who will travel outside of haulage times.

          SIDRA Analysis
Colliers has assessed the performance of the following intersections to confirm the impact of the proposed
development on the external road network utilising SIDRA analysis software (version 9.1).

         Weyba Road/ Reed Street/ Mary Street Roundabout
         Noosa Drive / Coral Tree Avenue Roundabout
         Noosa Drive / Sunshine Beach Road Roundabout
         Grant Street / Banksia Avenue Roundabout




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 10

          Analysis of Weyba Road / Reed Street/ Mary Street

Figure 3-2 shows the configuration of the Weyba Road / Reed Street / Mary Street roundabout intersection
adopted in the SIDRA analysis. All default SIDRA inputs were used for the analysis.




Figure 3-1 - Weyba Road / Reed Street / Mary Street SIDRA Layout

3.1.1     Analysis Results

The results of the SIDRA analysis for the 2022 Existing, 2025 Base and 2025 Base + Earthworks scenarios
(both weekdays and weekend) are summarised in Table 3-1 overleaf. Detailed SIDRA output data is also
included in Attachment C – SIDRA Outputs.

Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 11

Table 3-1: Summary of Sidra Outputs (Weyba Road / Mary Street / Reed Street Roundabout)
 Scenario         DOS      Average Delay                          LOS               95th Percentile Critical Queue (m)

                            Overall         Worst Movement        Overall   Worst    Reed St    Weyba     Weyba      Mary
                                                                            Mvmt       (E)      Rd (SE)   Rd (N)     St (W)
 Weekday - AM Peak Hour

 2022 Survey      58%         9 sec      18 sec (UT Weyba Rd N)     A         B       31 m       29 m      29 m          6m
 2025 Base        61%        10 sec      20 sec (UT Weyba Rd N)     A         B       36 m       31 m      35 m          51 m
 2025 Base +      62%        10 sec      20 sec (UT Weyba Rd N)     A         B       38 m       31 m      36 m          52 m
 Earthworks
 Weekday - PM Peak Hour

 2022 Survey      66%        11 sec      25 sec (UT Weyba Rd N)     A         B       42 m       36 m      53 m          59 m
 2025 Base        71%        13 sec      29 sec (UT Weyba Rd N)     A         B       49 m       41 m      64 m          69 m
 2025 Base +      72%        13 sec      29 sec (UT Weyba Rd N)     A         B       51 m       41 m      66 m          72 m
 Earthworks
 Weekend – PM Peak
 2022 Survey      57%         9 sec      17 sec (UT Weyba Rd N)     A         B       34 m       24 m      24 m          43 m
 2025 Base        61%        10 sec      18 sec (UT Weyba Rd N)     A         B       40 m       25 m      28 m          51 m
 2025 Base +      61%        10 sec      18 sec (UT Weyba Rd N)     A         B       41 m       26 m      28 m          52 m
 Earthworks
RT – Right Turn Movement, Th – Through Movement, LT – Left Turn Movement, UT – U Turn Movement; N – North, S – South, E –
East, W – West

The analysis indicates that the roundabout is expected to operate at suitable levels at the during the 2025
assessment year, with earthworks traffic included, with a worst-case DoS 72% (less than 85% - practical
capacity limit of roundabout) and overall LoS A. The addition of the Bulk Earthworks traffic has no notable
impact to key operational metrics, with negligible change to average intersection delay and at most an
increase in queuing of up to 3 m (less than one vehicle length – approx. 6.0m).

Based on this SIDRA capacity assessment, the proposed Bulk Earthworks traffic generation is considered to
have negligible impact on the operations of the Weyba Road / Mary Street / Reed Street roundabout
intersection.

          Analysis of Noosa Drive / Coral Tree Avenue

Figure 3-2 overleaf shows the configuration of the Noosa Drive / Coral Tree Avenue roundabout intersection
adopted in the SIDRA analysis. All default SIDRA inputs were used for the analysis.




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 12

Figure 3-2: Noosa Drive / Coral Tree Avenue SIDRA Layout

3.2.1     Analysis Results

The results of the SIDRA analysis for the 2022 Existing, 2025 Base and 2025 Base + Earthworks scenarios
(both weekdays and weekend) are summarised in Table 3-2. Detailed SIDRA output data is also included in
Attachment C – SIDRA Outputs.
Table 3-2: Summary of Sidra Outputs (Noosa Drive and Coral Tree Avenue Roundabout)
 Scenario         DoS      Average Delay                              LoS                  95th Percentile Critical Queue (m)
                           Overall          Worst Movement            Overall    Worst      Noosa       Coral Tree    Noosa
                                                                                Movement   Drive (E)     Ave (N)      Dr (W)
 Weekday - AM Peak Hour

 2022 Survey      32%        5 sec        14 sec (UT Noosa Dr W)            A      B         18 m          2m          18 m
 2025 Base        33%        5 sec        14 sec (UT Noosa Dr W)            A      B         19 m          2m          18 m
 2025 Base +      34%        5 sec        14 sec (UT Noosa Dr W)            A      B         20 m          2m          19 m
 Earthworks
 Weekday - PM Peak Hour

 2022 Survey      42%        5 sec        12 sec (UT Noosa Dr W)            A      B         29 m          1m          18 m
 2025 Base        43%        5 sec        12 sec (UT Noosa Dr W)            A      B         31 m          1m          19 m
 2025 Base +      44%        5 sec        12 sec (UT Noosa Dr W)            A      B         32 m          1m          19 m
 Earthworks
 Weekend – PM Peak
 2022 Survey      40%        5 sec     12 sec (RT Coral Tree Ave N)         A      B         22 m          1m          23 m
 2025 Base        41%        5 sec     13 sec (RT Coral Tree Ave N)         A      B         24 m          1m          24 m
 2025 Base +      42%        5 sec     13 sec (RT Coral Tree Ave N)         A      B         24 m          1m          25 m
 Earthworks
RT – Right Turn Movement, Th – Through Movement, LT – Left Turn Movement, UT – U Turn Movement; N – North, S – South, E –
East, W – West
Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 13

The analysis indicates that the roundabout is expected to operate at suitable levels at the during the 2025
assessment year, with earthworks traffic included, with a worst-case DoS 44% (less than 85% - practical
capacity limit of roundabout) and overall LoS A. The addition of the Bulk Earthworks traffic has no notable
impact to key operational metrics, with minor change to average intersection delay and at most an increase
in queuing of 1 m (less than one vehicle length – approx. 6.0m).

Based on this SIDRA capacity assessment, the proposed Bulk Earthworks traffic generation is considered to
have negligible impact on the operations of the Noosa Drive / Coral Tree Avenue roundabout intersection.

          Analysis of Grant Street / Noosa Drive / Sunshine Beach Road

Figure 3-3 shows the configuration of the Grant Street / Noosa Drive / Sunshine Beach Road roundabout
intersection adopted in the SIDRA analysis. All default SIDRA inputs were used for the analysis.




Figure 3-3: Grant Street / Noosa Drive / Sunshine Beach Road SIDRA Layout


Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 14

3.3.1     Analysis Results

The results of the SIDRA analysis for the 2022 Existing, 2025 Base and 2025 Base + Development scenarios
(both weekdays and weekend) are summarised in Table 3-3 overleaf. Detailed SIDRA output data is also
included in Attachment C – SIDRA Outputs.

Table 3-3: Summary of SIDRA Outputs (Grant Street / Noosa Drive / Sunshine Beach Road Roundabout)
 Scenario           DoS     Average Delay                           LoS                  95th Percentile Critical Queue (m)

                            Overall     Worst Movement              Overall   Worst      Sunshine   Noosa    Grant    Noosa
                                                                              Movement   Beach      Dr (E)   St (N)   Dr
                                                                                         Rd (S)                       (W)
 Weekday - AM Peak Hour

 2022 Survey        30%       9 sec        18 sec (RT Grant St N)     A          B         16 m      12 m     6m       12 m
 2025 Base          32%       9 sec        19 sec (UT Grant St N)     A          B         17 m      12 m     6m       13 m
 2025 Base +        32%       9 sec        19 sec (UT Grant St N)     A          B         17 m      12 m     7m       13 m
 Earthworks
 Weekday - PM Peak Hour

 2022 Survey        40%       9 sec        20 sec (UT Grant St N)     A          B         20 m      24 m     6m       16 m
 2025 Base          42%       9 sec        21 sec (UT Grant St N)     A          B         21 m      25 m     6m       16 m
 2025 Base +        43%       9 sec        21 sec (UT Grant St N)     A          B         22 m      26 m     7m       16 m
 Earthworks
 Weekend – PM Peak
 2022 Survey        32%       8 sec        19 sec (UT Grant St N)     A          B         17 m      17 m     3m       14 m
 2025 Base          33%       8 sec        20 sec (UT Grant St N)     A          B         18 m      18 m     3m       15 m
 2025 Base +        33%       8 sec        20 sec (UT Grant St N)     A          B         18 m      18 m     3m       15 m
 Earthworks
RT – Right Turn Movement, Th – Through Movement, LT – Left Turn Movement, UT – U Turn Movement; N – North, S – South, E –
East, W - West

The analysis indicates that the roundabout is expected to operate at suitable levels at the 2025 assessment
year, with Earthworks traffic included, with a worst-case DoS 43% (less than 85% - practical capacity limit of
roundabout) and an overall LoS A. The addition of the Earthworks traffic has no notable impact to key
operational metrics, with minor change to average intersection delay and at most an increase in queuing of
1 m (less than one vehicle length - approx. 6.0m).

Based on this assessment, the proposed Bulk Earthworks traffic generation is considered to have negligible
impact on the operations of the Grant Street / Noosa Drive / Sunshine Beach Road roundabout intersection.

          Analysis of Grant Street / Banksia Avenue

Ultimately, access to the subject development will be achieved with the addition of a fourth (western) leg to
the existing Grant Street / Banksia Avenue roundabout intersection.


Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 15

However, during Bulk Earthworks this access will not be in place and haulage vehicles will gain access to the
subject site at three (3) proposed temporary access locations as highlighted in Figure 3-4 from Avada
Traffic’s Traffic Management Plan (TMP). All haulage traffic will be turning between the Grant Street eastern
and Banksia Avenue northern approaches - intersection will remain as per the existing arrangement.




Figure 3-4: Earthworks Access Points
Source: Avada Traffic TMP

The SIDRA layout for the Grant Street / Banksia Avenue roundabout intersection is shown in Figure 3-5.




Figure 3-5: Grant Street / Banksia Avenue SIDRA Layout
Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 16

The results of the SIDRA analysis for the 2025 Base + Earthworks scenarios (both weekdays and weekend)
are summarised in Table 3-4. Detailed SIDRA output data is also included in Attachment C – SIDRA Outputs.

Table 3-4: Summary of SIDRA Outputs (Grant Street / Banksia Avenue Roundabout)
 Scenario           DoS          Average Delay                            LoS                  95th Percentile Critical Queue
                                                                                               (m)
                                 Overall      Worst Movement              Overall   Worst      Banksia    Grant      Banksia
                                                                                    Movement   Ave (S)    Street     Ave (N)
                                                                                                          (E)
 Weekday - AM Peak Hour

 2022 Survey           5%          6 sec       9 sec (UT Banksia Ave N)      A         A        <1m         1m         2m
 2025 Base             5%          6 sec       9 sec (UT Banksia Ave N)      A         A        <1m         2m         2m
 2025 Base +           5%          7 sec       9 sec (UT Banksia Ave N)      A         A        <1m         2m         2m
 Earthworks
 Weekday - PM Peak Hour

 2022 Survey           4%          7 sec         9 sec (UT Grant St N)       A         A        <1m         2m         1m
 2025 Base             4%          7 sec         9 sec (UT Grant St N)       A         A        <1m         2m         2m
 2025 Base +           5%          7 sec         9 sec (UT Grant St N)       A         A        <1m         2m         2m
 Earthworks
 Weekend – PM Peak
 2022 Survey           4%          7 sec       9 sec (UT Banksia Ave N)      A         A        <1m         2m         2m
 2025 Base             5%          7 sec       9 sec (UT Banksia Ave N)      A         A        <1m         2m         2m
 2025 Base +           5%          7 sec       9 sec (UT Banksia Ave N)      A         A        <1m         2m         2m
 Earthworks
RT – Right Turn Movement, Th – Through Movement, LT – Left Turn Movement, UT – U Turn Movement; N – North, S – South, E –
East, W – West


The analysis indicates that the roundabout is expected to operate at suitable levels at the 2025 assessment
year, with Earthworks traffic included, with a worst-case DoS 5% (less than 85%, practical capacity limit of
roundabout) and an overall LoS A. The addition of the earthworks traffic has negligible impact to key
intersection operational metrics, with no significant change to average intersection delay and queuing.

Based on this assessment, the proposed Bulk Earthworks traffic generation is considered to have no adverse
impact on the operations of this roundabout intersection.




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 17

          Summary
The traffic engineering aspects of the Bulk Earthworks traffic impact assessment are considered to
adequately address the transport-related Requests for Information from Council. The following summary is
provided:

         Daily haulage of 150 trucks (75 loaded / 75 unloaded) with maximum peak hour movements of up to
          10 vehicles per hour (vph) IN and 10 vph OUT during weekday AM / PM or weekend peaks.
         Pavement impact assessment noted rehabilitation costs of up to $3,145.
         Recommendation for minor potholes to be repaired on the local roads Serenity Close to Grant Street
          that appear during the haulage period.

         Dilapidation report between site and the Grant Street / Noosa Drive roundabout and the as well as
          the key intersection of Weyba Road / Mary Street / Reef Street roundabout, to identify potential
          road infrastructure impacts (e.g. broken kerbs) that may have occurred during the haulage period.
         Operations (queuing / delay) on local road intersections will not be adversely impacted by haulage
          truck movements.
         Road Safety Audit will be provided separately.

Overall, Colliers see no traffic engineering reason why the relevant approvals cannot be granted.

If you have any queries relating to the information provided herein, please contact myself or Darryl Watkins
on (07) 3327 9500.

Yours sincerely,




Ashley Schalken
Project Consultant – Traffic
Colliers International Engineering & Design (TTMC) Pty Ltd


Reviewed by,




Darryl Watkins
Associate Director | RPEQ # 23854
Colliers International Engineering & Design (TTMC) Pty Ltd



Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 18

Attachment A — Survey Data
Site 1 — Weyba Road/ Reed Street
Weekday (Thursday) —- AM

Vehicle Movement Performance

 

 

 

 

 

 

INPUT VOLUMES DEMAND FLOWS Degree of Average Level of % BACK OF QUEUE Proportion Effective Average Average

Mov ID Turn Total HV Total HV Saturation Delay Service Vehicles Distance Queued Stop Rate Number of Speed

veh/h veh/h veh/h % vic sec veh m km/h per veh Cycles km/h
South: Reef Street
1 L2 247 4 269 1.6 0.599 16.5 LOS B 5.3 37.6 0.97 0.95 1.28 46.6
2 1 232 7 253 3.0 0.888 32.5 LOS C 16.4 116.9 1.00 1.41 2.21 38.1
3b R3 232 4 253 1.7 0.888 40.4 LOS D 16.4 116.9 1.00 1.41 2.21 37.5
3u U 4 0 4 0.0 0.888 41.4 LOS D 16.4 116.9 1.00 1.41 2.21 37.5
Approach 715 15 780 2.1 0.888 29.6 LOS C 16.4 116.9 0.99 1.25 1.89 40.3
SouthEast: Weyba Road
21b L3 301 13 328 4.3 0.200 3.2 LOS A 0.0 0.0 0.00 0.45 0.00 55.7
21a L1 457 13 498 2.8 0.798 14.3 LOS B 11.8 84.8 1.00 1.01 1.51 47.7
23a R1 125 4 136 3.2 0.798 20.1 LOS C 11.8 84.8 1.00 1.01 1.51 46.8
23u U 3 0 3 0.0 0.798 23.6 LOS C 11.8 84.8 1.00 1.01 1.51 46.9
Approach 886 30 966 3.4 0.798 11.3 LOS B 11.8 84.8 0.66 0.82 1.00 50.0
North: Weyba Road
Ta L1 93 4 101 4.3 0.368 14.8 LOS B 1.7 12.2 0.78 0.89 0.89 48.1
8 1 210 7 229 3.3 0.694 14.2 LOS B 5.5 39.4 0.90 1.02 1.30 47.2
9 R2 112 3 122 2.7 0.694 20.2 LOS C 5.5 39.4 0.90 1.02 1.30 46.5
9u U 6 0 7 0.0 0.694 22.4 LOS C 5.5 39.4 0.90 1.02 1.30 46.5
Approach 421 14 459 3.3 0.694 16.0 LOS B 5.5 39.4 0.87 0.99 1.21 47.2
West: Mary Street
10 L2 145 5 158 3.4 0.583 13.3 LOS B 5.1 36.8 0.92 0.90 1.17 47.1
12a R1 495 16 540 3.2 0.799 22.4 LOS C 11.3 81.8 0.98 1.05 1.51 43.5
12 R2 108 6 118 5.6 0.799 25.5 LOS C 11.3 81.8 1.00 1.12 1.65 42.3
12u U 19 1 21 5.3 0.799 27.9 LOS C 11.3 81.8 1.00 1.12 1.65 42.3
Approach 767 28 836 3.7 0.799 21.3 LOS C 11.3 81.8 0.97 1.04 1.47 43.9
All Vehicles 2789 87 3041 3.1 0.888 19.5 LOS B 16.4 116.9 0.86 1.02 1.39 45.1

   

18

Page 19

Weekday (Thursday) — PM

Vehicle Movement Performance

 

 

 

 

 

 

INPUT VOLUMES DEMAND FLOWS Degree of Average % BACK OF QUEUE Proportion —_ Effective Average Average

Mov ID Turn Total HV Total HV Saturation Delay we Vehicles Distance  Queued  StopRate Numberof Speed

veh/h veh/h veh/h % vic sec veh m km/h per veh Cycles km/h
South: Reef Street
1 L2 282 3 283 1.1 0.576 14.7 LOS B 5.0 35.4 0.94 0.92 1.22 47.7
2 11 253 5 254 2.0 0.831 23.7 LOS C 13.0 92.7 1.00 1.23 1.85 41.7
3b R3 255 5 256 2.0 0.831 31.7 LOS C 13.0 92.7 1.00 1.23 1.85 41.0
3u U 2 0 2 0.0 0.831 32.7 LOS C 13.0 92.7 1.00 1.23 1.85 41.1
Approach 792 13 796 1.6 0.831 23.1 LOS C 13.0 92.7 0.98 1.12 1.63 43.3
SouthEast: Weyba Road
21b L3 330 8 332 2.4 0.200 3.1 LOS A 0.0 0.0 0.00 0.45 0.00 55.8
21a L1 466 8 468 1.7 0.787 16.2 LOS B 11.2 79.1 1.00 1.06 1.59 46.7
23a R1 102 0 103 0.0 0.787 21.9 LOS C 11.2 79.1 1.00 1.06 1.59 45.9
23u U 4 0 4 0.0 0.787 25.5 LOS C 11.2 79.1 1.00 1.06 1.59 45.9
Approach 902 16 907 1.8 0.787 12.1 LOS B 11.2 79.1 0.63 0.84 1.01 49.5
North: Weyba Road
Ta L1 94 0 94 0.0 0.368 15.6 LOS B 1.7 11.6 0.79 0.90 0.90 47.5
8 11 233 7 234 3.0 0.755 16.5 LOS B 6.8 48.1 0.93 1.08 1.46 45.8
9 R2 150 0 151 0.0 0.755 22.3 LOS C 6.8 48.1 0.93 1.08 1.46 45.2
Qu U 9 0 9 0.0 0.755 24.7 LOS C 6.8 48.1 0.93 1.08 1.46 45.2
Approach 486 7 488 1.4 0.755 18.3 LOS B 6.8 48.1 0.90 1.04 1.35 45.9
West: Mary Street
10 L2 196 0 197 0.0 0.577 12.3 LOS B 5.1 36.0 0.91 0.88 1.13 48.0
12a R1 463 5 465 1.1 0.792 21.0 LOS C 11.2 79.2 0.97 1.02 1.45 44.3
12 R2 191 1 192 0.5 0.792 23.7 LOS C 11.2 79.2 1.00 1.08 1.59 43.1
12u U 25 0 25 0.0 0.792 26.1 LOS C 11.2 79.2 1.00 1.08 1.59 43.1
Approach 875 6 879 0.7 0.792 19.8 LOS B 11.2 79.2 0.97 1.00 1.41 44.8
All Vehicles 3055 42 3070 1.4 0.831 18.1 LOS B 13.0 92.7 0.86 0.99 1.34 45.8

 

Page 20

Weekend (Saturday) — AM

Vehicle Movement Performance

 

 

 

 

 

 

INPUT VOLUMES DEMAND FLOWS Degree of Average % BACK OF QUEUE Proportion _ Effective Average Average
Mov ID Turn Total HV Total HV Saturation _Delay vei Of Vehicles Distance Queued Stop Rate Number of Speed
veh/h veh/h veh/h % vic sec veh m km/h per veh Cycles km/h

South: Reef Street
1 L2 197 0 199 0.0 0.411 11.1 LOS B 2.7 19.0 0.84 0.80 0.91 50.0
2 T1 272 3 275 1.1 0.769 16.5 LOS B 10.5 74.2 1.00 1.06 1.57 45.3
3b R3 264 2 267 0.8 0.769 24.5 LOS C 10.5 74.2 1.00 1.06 1.57 44.5
3u U iS 0 3 0.0 0.769 25.5 LOS C 10.5 74.2 1.00 1.06 1.57 44.5
Approach 736 5 745 0.7 0.769 17.9 LOS B 10.5 74.2 0.96 0.99 1.39 46.1
SouthEast: Weyba Road
21b L3 261 4 264 1.5 0.158 3.1 LOSA 0.0 0.0 0.00 0.45 0.00 55.8
21a L1 400 4 405 1.0 0.612 8.0 LOSA 5.9 42.0 0.83 0.76 0.99 51.8
23a R1 120 1 121 0.8 0.612 13.7 LOS B 5.9 42.0 0.83 0.76 0.99 50.8
23u U 1 0 1 0.0 0.612 17.4 LOS B 5.9 42.0 0.83 0.76 0.99 50.8
Approach 782 9 791 1.2 0.612 7.2 LOSA 5.9 42.0 0.55 0.65 0.66 52.9
North: Weyba Road
7a L1 125 0 127 0.0 0.307 9.9 LOSA 1.4 10.1 0.74 0.79 0.75 51.3

T1 163 2 165 1.2 0.528 10.2 LOS B 3.5 24.7 0.82 0.89 1.00 49.4

R2 132 1 134 0.8 0.528 16.2 LOS B 3.5 24.7 0.82 0.89 1.00 48.6
9u U 4 0 4 0.0 0.528 18.6 LOS B 3.5 24.7 0.82 0.89 1.00 48.6
Approach 424 3 429 0.7 0.528 12.0 LOS B 3.5 24.7 0.79 0.86 0.93 49.7
West: Mary Street
10 L2 180 2 182 1.1 0.526 12.0 LOS B 4.3 30.5 0.90 0.86 1.08 48.3
12a R1 423 1 428 0.2 0.722 19.4 LOS B 8.7 61.2 0.98 0.96 1.35 45.1
12 R2 139 2 141 1.4 0.722 21.5 LOS C 8.7 61.2 1.00 0.99 1.44 44.3
12u U 10 0 10 0.0 0.722 23.9 LOS C 8.7 61.2 1.00 0.99 1.44 44.3
Approach 752 5 761 0.7 0.722 18.1 LOS B 8.7 61.2 0.96 0.94 1.30 45.6
All Vehicles 2694 22 2727 0.8 0.769 14.0 LOS B 10.5 74.2 0.82 0.86 1.08 48.3

 

Page 21

(Ory lite

Site 2 — Noosa Drive/ Coral Tree Avenue

Weekday (Friday)

Coral Tree Ave

Noosa Dr Noosa Dr Intersection Totals
: urn
‘tall Light ‘otal Light otallVehicles | EB [WB
1 [0 0 0 1 0
0
0 0

~ urn =
otal Light otal Light otal Vehicles otal Light otal Light Total Vehicles | Light Vehicles [Heavy Vehicles| Total Vehicles
20 2 2 24 E 0 24] 0 E

0

31 6 38 39

AM TOTAL AM TOTAL AM TOTAL AM TOTAL 1993 AM TOTAL

PM TOTAL PM TOTAL PM TOTAL PM TOTAL

PM TOTAL

   
 

Weekend (Saturday)

Coral Tree Ave Noosa Dr Noosa Dr Intersection Totals

Vehicles: ota! Total Vehicles Vehicles Vehicles Total Vehicles
137 i 94

15 E E 103

Site: 3-7 Serenity Close, Noosa — Proposed Resort Complex

Reference: 22BRT0122

Page 22

Colliers

Site 3 — Grant Street/ Noosa Drive/ Sunshine Beach Road

Weekday (Friday)

Intersection Totals

Grant St ‘Sunshine Beach Rd

Vehicles

   
 

Weekend (Saturday)

Grant St ‘Sunshine Beach Rd Intersection Totals

Vehicles

Site: 3-7 Serenity Close, Noosa — Proposed Resort Complex

Reference: 22BRT0122

Page 23

Site 4- Grant Street/ Banksia Avenue

Weekday (Friday)

Banksia Ave
jovement ~
e Light ‘otal Light otal Light
06:30 - 06:45 | 5 5 0 0 0

07:15- 07:30 | 4
07:30 - 07:45

08:15 - 08:30

16:00 - 16:15
17:00 - 17:15

17:45 - 18:00

Weekend (Saturday)

Banksia Ave
jovement ~
e ‘otal Light otal Light
10:00 - 10:15 16} 0 0 0

11:15 - 11:30

12:00 - 12:15
12:15 - 12:30

13:00 - 13:15
13:15 - 13:30

urn
‘otal| Vehicles
0 5

 

urn
‘otal| Vehicles
C} 16

 

Site: 3-7 Serenity Close, Noosa — Proposed Resort Complex

Reference: 22BRT0122

ment

ie
06:30 - 06:45
07:15 - 07:30
07:30 - 07:45

08:15 - 08:30

16:00 - 16:15
17:00 - 17:15

17:45 - 18:00

ment
ie
10:00 - 10:15

11:15 - 11:30

12:00 - 12:15
12:15 - 12:30
13:00 - 13:15
13:15 - 13:30

Peak Hr:

otal] Light

o

‘otal Light

0

1

0

Banksia Ave

1

Banksia Ave

0

otal Light

0

otal Light

0

urn
‘otall Vehicles
0 1

08:15 - 08:30

17:00 - 17:15

17:45 - 18:00

ae

urn ment
‘otall Vehicles ie
C} 0 10:00 - 10:15

13:00 - 13:15
13:15 - 13:30

t
Light
0

‘otal Light

o

otal] Light

0

5
5

3
9

8

Grant St
ota
6
5
5
3

Grant St

otal Light

t

5

urn
‘otallVehicles | NB [SB
5 11 0

5

urn
‘otallVehicles | NB [SB
5 13 0 0

ae

e (15m:
06:30 - 06:45
07:15 - 07:30
07:30 - 07:45
08:15 - 08:30
09:00 - 09:15

AM Peak

15:15 - 15:30
16:00 - 16:15
17:00 - 17:15

17:45 - 18:00

ae

e (15m:
10:00 - 10:15
10:15 - 10:30
11:00 - 11:15
11:15 - 11:30
12:00 - 12:15
12:15 - 12:30
13:00 - 13:15
13:15 - 13:30

Intersection Totals

Total Vehicles | Light Vehicles [Heavy Vehicles
7 16 1

5
8
21

Intersection Totals

Total Vehicles | Light Vehicles Heavy Vehicles
29 0
27 0

e
06:30 - 07:30
07:15 - 08:15
07:30 - 08:30
08:15 - 09:15
09:00 - 10:00

AM Peak

15:15 - 16:15
16:00 - 17:00
17:00 - 18:00

17:45 - 18:45

  
 

e
10:00 - 11:00
10:15 - 11:15

11:00 - 12:

11:15 - 12:15
12:00 - 13:00
12:15 - 13:15
13:00 - 14:00
13:15 - 14:15

TOTAL
Peak Hr:

Colliers

Total Vehicles
53

Total Vehicles
108
112

Page 24

 Attachment B – Network Diagrams

 2022 Survey




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex   24
Reference: 22BRT0122

Page 25

2025 Base Year




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 26

2025 Base + Earthworks Traffic




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122

Page 27

Attachment C – SIDRA Outputs




Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex   27
Reference: 22BRT0122

Page 28

SITE LAYOUT
  Site: 101 [1_Noosa Dr_Coral Tree Ave - Existing 2022 AM
Peak (Weekday) (Site Folder: Site 1)]
New Site
Site Category: (None)
Roundabout

Layout pictures are schematic functional drawings reflecting input data. They are not design drawings.




SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Created: Wednesday, 16 July 2025 2:56:38 PM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 29

MOVEMENT SUMMARY
  Site: 101 [1_Noosa Dr_Coral Tree Ave - Existing 2022 AM
Peak (Weekday) (Site Folder: Site 1)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov         Demand         Arrival      Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class          Flows        Flows       Satn    Delay Service              Queue           Que      Stop    No. of   Speed
                      [ Total HV ] [ Total HV ]                                    [ Veh.   Dist ]               Rate    Cycles
                       veh/h % veh/h %                 v/c      sec                  veh      m                                     km/h
 East: Noosa Drive (E)
 5       T1 All MCs       378 2.2      378 2.2      0.297       4.0    LOS A         2.5      18.1      0.17     0.43      0.17      51.5
 6       R2 All MCs        20 5.3       20 5.3      0.297       9.1    LOS A         2.5      18.1      0.17     0.43      0.17      44.0
 6u       U     All MCs    71 4.5       71 4.5      0.297      11.3    LOS B         2.5      18.1      0.17     0.43      0.17      44.1
 Approach                 468 2.7      468 2.7      0.297       5.3    LOS A         2.5      18.1      0.17     0.43      0.17      50.5

 North: Coral Tree Ave (N)
 7       L2 All MCs        17 6.3       17 6.3      0.044       6.6    LOS A         0.3       1.8      0.60     0.65      0.60      40.5
 9       R2 All MCs        22 4.8       22 4.8      0.044      11.8    LOS B         0.3       1.8      0.60     0.65      0.60      47.0
 Approach                  39 5.4       39 5.4      0.044       9.5    LOS A         0.3       1.8      0.60     0.65      0.60      44.8

 West: Noosa Drive (W)
 10      L2 All MCs          9 22.2      9 22.2     0.321       4.7    LOS A         2.4      17.5      0.35     0.40      0.35      49.1
 11      T1 All MCs       426 3.0      426 3.0      0.321       4.5    LOS A         2.4      17.5      0.35     0.40      0.35      51.3
 12u      U     All MCs     1 100.       1 100.     0.321      13.7    LOS B         2.4      17.5      0.35     0.40      0.35      49.5
                                  0           0
 Approach                 437 3.6      437 3.6      0.321       4.6    LOS A         2.4      17.5      0.35     0.40      0.35      51.2

 All Vehicles             944 3.2      944 3.2      0.321       5.1    LOS A         2.5      18.1      0.27     0.43      0.27      50.6

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:20 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 30

MOVEMENT SUMMARY
  Site: 101 [2_Noosa Dr_Coral Tree Ave - Base 2025 AM Peak
(Weekday) (Site Folder: Site 1)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov         Demand         Arrival      Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class          Flows        Flows       Satn    Delay Service              Queue           Que      Stop    No. of   Speed
                      [ Total HV ] [ Total HV ]                                    [ Veh.   Dist ]               Rate    Cycles
                       veh/h % veh/h %                 v/c      sec                  veh      m                                     km/h
 East: Noosa Drive (E)
 5       T1 All MCs       392 2.2      392 2.2      0.309       4.0    LOS A         2.7      19.1      0.18     0.43      0.18      51.5
 6       R2 All MCs        21 5.3       21 5.3      0.309       9.1    LOS A         2.7      19.1      0.18     0.43      0.18      44.0
 6u       U     All MCs    73 4.5       73 4.5      0.309      11.3    LOS B         2.7      19.1      0.18     0.43      0.18      44.1
 Approach                 485 2.7      485 2.7      0.309       5.3    LOS A         2.7      19.1      0.18     0.43      0.18      50.5

 North: Coral Tree Ave (N)
 7       L2 All MCs        18 6.3       18 6.3      0.047       6.7    LOS A         0.3       2.0      0.62     0.66      0.62      40.4
 9       R2 All MCs        23 4.8       23 4.8      0.047      11.9    LOS B         0.3       2.0      0.62     0.66      0.62      46.9
 Approach                  41 5.4       41 5.4      0.047       9.7    LOS A         0.3       2.0      0.62     0.66      0.62      44.7

 West: Noosa Drive (W)
 10      L2 All MCs          9 22.2      9 22.2     0.333       4.7    LOS A         2.6      18.4      0.36     0.40      0.36      49.1
 11      T1 All MCs       442 3.0      442 3.0      0.333       4.6    LOS A         2.6      18.4      0.36     0.40      0.36      51.2
 12u      U     All MCs     1 100.       1 100.     0.333      13.7    LOS B         2.6      18.4      0.36     0.40      0.36      49.5
                                  0           0
 Approach                 453 3.6      453 3.6      0.333       4.6    LOS A         2.6      18.4      0.36     0.40      0.36      51.2

 All Vehicles             979 3.2      979 3.2      0.333       5.2    LOS A         2.7      19.1      0.28     0.43      0.28      50.6

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:21 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 31

MOVEMENT SUMMARY
  Site: 101 [4_Noosa Dr_Coral Tree Ave - Base+dev OP 2025
AM Peak (Weekday) (Site Folder: Site 1)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov         Demand         Arrival      Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class          Flows        Flows       Satn    Delay Service              Queue           Que      Stop    No. of   Speed
                      [ Total HV ] [ Total HV ]                                    [ Veh.   Dist ]               Rate    Cycles
                       veh/h % veh/h %                 v/c      sec                  veh      m                                     km/h
 East: Noosa Drive (E)
 5       T1 All MCs       402 2.2      402 2.2      0.315       4.0    LOS A         2.7      19.7      0.18     0.43      0.18      51.5
 6       R2 All MCs        21 5.3       21 5.3      0.315       9.1    LOS A         2.7      19.7      0.18     0.43      0.18      44.0
 6u       U     All MCs    73 4.5       73 4.5      0.315      11.3    LOS B         2.7      19.7      0.18     0.43      0.18      44.1
 Approach                 496 2.7      496 2.7      0.315       5.3    LOS A         2.7      19.7      0.18     0.43      0.18      50.5

 North: Coral Tree Ave (N)
 7       L2 All MCs        18 6.3       18 6.3      0.048       6.8    LOS A         0.3       2.0      0.62     0.66      0.62      40.3
 9       R2 All MCs        23 4.8       23 4.8      0.048      12.0    LOS B         0.3       2.0      0.62     0.66      0.62      46.8
 Approach                  41 5.4       41 5.4      0.048       9.7    LOS A         0.3       2.0      0.62     0.66      0.62      44.6

 West: Noosa Drive (W)
 10      L2 All MCs          9 22.2      9 22.2     0.341       4.7    LOS A         2.6      19.0      0.36     0.40      0.36      49.0
 11      T1 All MCs       453 3.0      453 3.0      0.341       4.6    LOS A         2.6      19.0      0.36     0.40      0.36      51.2
 12u      U     All MCs     1 100.       1 100.     0.341      13.7    LOS B         2.6      19.0      0.36     0.40      0.36      49.5
                                  0           0
 Approach                 463 3.6      463 3.6      0.341       4.6    LOS A         2.6      19.0      0.36     0.40      0.36      51.1

 All Vehicles             1000 3.2 1000 3.2         0.341       5.2    LOS A         2.7      19.7      0.28     0.43      0.28      50.6

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:21 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 32

MOVEMENT SUMMARY
  Site: 101 [6_Noosa Dr_Coral Tree Ave - Existing 2022 PM
Peak (Weekday) (Site Folder: Site 1)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov         Demand         Arrival      Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.     Aver.
 ID          Class          Flows        Flows       Satn    Delay Service              Queue           Que      Stop    No. of    Speed
                      [ Total HV ] [ Total HV ]                                    [ Veh.   Dist ]               Rate    Cycles
                       veh/h % veh/h %                 v/c      sec                  veh      m                                     km/h
 East: Noosa Drive (E)
 5       T1 All MCs       585 1.4      585 1.4      0.418       3.9    LOS A         4.1      29.1      0.11     0.43       0.11     51.9
 6       R2 All MCs        16 0.0       16 0.0      0.418       9.0    LOS A         4.1      29.1      0.11     0.43       0.11     45.3
 6u       U     All MCs   108 0.0      108 0.0      0.418      11.2    LOS B         4.1      29.1      0.11     0.43       0.11     45.3
 Approach                 709 1.2      709 1.2      0.418       5.1    LOS A         4.1      29.1      0.11     0.43       0.11     51.1

 North: Coral Tree Ave (N)
 7       L2 All MCs        13 16.7      13 16.7     0.024       7.1    LOS A         0.1       1.0      0.62     0.62      0.62      39.8
 9       R2 All MCs          7 0.0       7 0.0      0.024      11.7    LOS B         0.1       1.0      0.62     0.62      0.62      47.6
 Approach                  20 10.5      20 10.5     0.024       8.8    LOS A         0.1       1.0      0.62     0.62      0.62      43.4

 West: Noosa Drive (W)
 10      L2 All MCs        17 0.0       17 0.0      0.335       4.5    LOS A         2.5      17.7      0.40     0.42      0.40      50.8
 11      T1 All MCs       423 1.5      423 1.5      0.335       4.8    LOS A         2.5      17.7      0.40     0.42      0.40      51.1
 12u      U     All MCs      2 0.0       2 0.0      0.335      12.0    LOS B         2.5      17.7      0.40     0.42      0.40      52.7
 Approach                 442 1.4      442 1.4      0.335       4.8    LOS A         2.5      17.7      0.40     0.42      0.40      51.1

 All Vehicles             1172 1.4 1172 1.4         0.418       5.1    LOS A         4.1      29.1      0.23     0.43      0.23      51.0

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:22 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 33

MOVEMENT SUMMARY
  Site: 101 [7_Noosa Dr_Coral Tree Ave - Base 2025 PM Peak
(Weekday) (Site Folder: Site 1)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov         Demand         Arrival      Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.     Aver.
 ID          Class          Flows        Flows       Satn    Delay Service              Queue           Que      Stop    No. of    Speed
                      [ Total HV ] [ Total HV ]                                    [ Veh.   Dist ]               Rate    Cycles
                       veh/h % veh/h %                 v/c      sec                  veh      m                                     km/h
 East: Noosa Drive (E)
 5       T1 All MCs       606 1.4      606 1.4      0.433       3.9    LOS A         4.4      30.9      0.11     0.43       0.11     51.9
 6       R2 All MCs        17 0.0       17 0.0      0.433       9.0    LOS A         4.4      30.9      0.11     0.43       0.11     45.2
 6u       U     All MCs    113 0.0     113 0.0      0.433      11.2    LOS B         4.4      30.9      0.11     0.43       0.11     45.2
 Approach                 736 1.2      736 1.2      0.433       5.1    LOS A         4.4      30.9      0.11     0.43       0.11     51.1

 North: Coral Tree Ave (N)
 7       L2 All MCs        13 16.7      13 16.7     0.025       7.3    LOS A         0.1       1.1      0.63     0.63      0.63      39.6
 9       R2 All MCs          7 0.0       7 0.0      0.025      11.9    LOS B         0.1       1.1      0.63     0.63      0.63      47.4
 Approach                  20 10.5      20 10.5     0.025       9.0    LOS A         0.1       1.1      0.63     0.63      0.63      43.3

 West: Noosa Drive (W)
 10      L2 All MCs        18 0.0       18 0.0      0.350       4.6    LOS A         2.6      18.7      0.41     0.43      0.41      50.7
 11      T1 All MCs       439 1.5      439 1.5      0.350       4.8    LOS A         2.6      18.7      0.41     0.43      0.41      51.0
 12u      U     All MCs      2 0.0       2 0.0      0.350      12.1    LOS B         2.6      18.7      0.41     0.43      0.41      52.7
 Approach                 459 1.4      459 1.4      0.350       4.9    LOS A         2.6      18.7      0.41     0.43      0.41      51.0

 All Vehicles             1215 1.4 1215 1.4         0.433       5.1    LOS A         4.4      30.9      0.24     0.43      0.24      50.9

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:23 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 34

MOVEMENT SUMMARY
  Site: 101 [9_Noosa Dr_Coral Tree Ave - Base+dev OP 2025
PM Peak (Weekday) (Site Folder: Site 1)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov         Demand         Arrival      Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.     Aver.
 ID          Class          Flows        Flows       Satn    Delay Service              Queue           Que      Stop    No. of    Speed
                      [ Total HV ] [ Total HV ]                                    [ Veh.   Dist ]               Rate    Cycles
                       veh/h % veh/h %                 v/c      sec                  veh      m                                     km/h
 East: Noosa Drive (E)
 5       T1 All MCs       617 1.4      617 1.4      0.439       3.9    LOS A         4.5      31.7      0.11     0.43       0.11     51.9
 6       R2 All MCs        17 0.0       17 0.0      0.439       9.0    LOS A         4.5      31.7      0.11     0.43       0.11     45.2
 6u       U     All MCs    113 0.0     113 0.0      0.439      11.2    LOS B         4.5      31.7      0.11     0.43       0.11     45.2
 Approach                 746 1.2      746 1.2      0.439       5.1    LOS A         4.5      31.7      0.11     0.43       0.11     51.1

 North: Coral Tree Ave (N)
 7       L2 All MCs        13 16.7      13 16.7     0.025       7.4    LOS A         0.1       1.1      0.64     0.63      0.64      39.5
 9       R2 All MCs          7 0.0       7 0.0      0.025      12.0    LOS B         0.1       1.1      0.64     0.63      0.64      47.4
 Approach                  20 10.5      20 10.5     0.025       9.0    LOS A         0.1       1.1      0.64     0.63      0.64      43.2

 West: Noosa Drive (W)
 10      L2 All MCs        18 0.0       18 0.0      0.358       4.6    LOS A         2.7      19.3      0.42     0.43      0.42      50.7
 11      T1 All MCs       449 1.5      449 1.5      0.358       4.8    LOS A         2.7      19.3      0.42     0.43      0.42      51.0
 12u      U     All MCs      2 0.0       2 0.0      0.358      12.1    LOS B         2.7      19.3      0.42     0.43      0.42      52.7
 Approach                 469 1.4      469 1.4      0.358       4.9    LOS A         2.7      19.3      0.42     0.43      0.42      51.0

 All Vehicles             1236 1.4 1236 1.4         0.439       5.1    LOS A         4.5      31.7      0.24     0.43      0.24      51.0

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:23 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 35

MOVEMENT SUMMARY
  Site: 101 [11_Noosa Dr_Coral Tree Ave - Existing 2022 PM
Peak (Weekend) (Site Folder: Site 1)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov         Demand         Arrival      Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class          Flows        Flows       Satn    Delay Service              Queue           Que      Stop    No. of   Speed
                      [ Total HV ] [ Total HV ]                                    [ Veh.   Dist ]               Rate    Cycles
                       veh/h % veh/h %                 v/c      sec                  veh      m                                     km/h
 East: Noosa Drive (E)
 5       T1 All MCs       479 1.3      479 1.3      0.342       3.9    LOS A         3.1      22.3      0.10     0.43      0.10      52.0
 6       R2 All MCs        12 0.0       12 0.0      0.342       9.0    LOS A         3.1      22.3      0.10     0.43      0.10      45.4
 6u       U     All MCs    85 2.5       85 2.5      0.342      11.2    LOS B         3.1      22.3      0.10     0.43      0.10      45.0
 Approach                 576 1.5      576 1.5      0.342       5.1    LOS A         3.1      22.3      0.10     0.43      0.10      51.2

 North: Coral Tree Ave (N)
 7       L2 All MCs        15 0.0       15 0.0      0.028       7.1    LOS A         0.2       1.2      0.67     0.64      0.67      41.4
 9       R2 All MCs          8 0.0       8 0.0      0.028      12.4    LOS B         0.2       1.2      0.67     0.64      0.67      47.4
 Approach                  23 0.0       23 0.0      0.028       9.1    LOS A         0.2       1.2      0.67     0.64      0.67      44.3

 West: Noosa Drive (W)
 10      L2 All MCs        15 0.0       15 0.0      0.398       4.4    LOS A         3.2      22.7      0.38     0.40      0.38      51.0
 11      T1 All MCs       538 0.8      538 0.8      0.398       4.6    LOS A         3.2      22.7      0.38     0.40      0.38      51.3
 12u      U     All MCs      1 0.0       1 0.0      0.398      11.9    LOS B         3.2      22.7      0.38     0.40      0.38      52.9
 Approach                 554 0.8      554 0.8      0.398       4.6    LOS A         3.2      22.7      0.38     0.40      0.38      51.3

 All Vehicles             1153 1.1 1153 1.1         0.398       4.9    LOS A         3.2      22.7      0.25     0.42      0.25      51.1

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:25 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 36

MOVEMENT SUMMARY
  Site: 101 [12_Noosa Dr_Coral Tree Ave - Base 2025 PM Peak
(Weekend) (Site Folder: Site 1)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov         Demand         Arrival      Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.     Aver.
 ID          Class          Flows        Flows       Satn    Delay Service              Queue           Que      Stop    No. of    Speed
                      [ Total HV ] [ Total HV ]                                    [ Veh.   Dist ]               Rate    Cycles
                       veh/h % veh/h %                 v/c      sec                  veh      m                                     km/h
 East: Noosa Drive (E)
 5       T1 All MCs       497 1.3      497 1.3      0.354       3.9    LOS A         3.3      23.5      0.11     0.43       0.11     52.0
 6       R2 All MCs        12 0.0       12 0.0      0.354       9.0    LOS A         3.3      23.5      0.11     0.43       0.11     45.4
 6u       U     All MCs    88 2.5       88 2.5      0.354      11.2    LOS B         3.3      23.5      0.11     0.43       0.11     45.0
 Approach                 597 1.5      597 1.5      0.354       5.1    LOS A         3.3      23.5      0.11     0.43       0.11     51.2

 North: Coral Tree Ave (N)
 7       L2 All MCs        16 0.0       16 0.0      0.030       7.3    LOS A         0.2       1.3      0.68     0.65      0.68      41.2
 9       R2 All MCs          8 0.0       8 0.0      0.030      12.6    LOS B         0.2       1.3      0.68     0.65      0.68      47.3
 Approach                  24 0.0       24 0.0      0.030       9.2    LOS A         0.2       1.3      0.68     0.65      0.68      44.0

 West: Noosa Drive (W)
 10      L2 All MCs        16 0.0       16 0.0      0.414       4.4    LOS A         3.4      24.1      0.39     0.41      0.39      50.9
 11      T1 All MCs       558 0.8      558 0.8      0.414       4.7    LOS A         3.4      24.1      0.39     0.41      0.39      51.2
 12u      U     All MCs      1 0.0       1 0.0      0.414      11.9    LOS B         3.4      24.1      0.39     0.41      0.39      52.8
 Approach                 575 0.8      575 0.8      0.414       4.7    LOS A         3.4      24.1      0.39     0.41      0.39      51.2

 All Vehicles             1196 1.1 1196 1.1         0.414       5.0    LOS A         3.4      24.1      0.25     0.42      0.25      51.1

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:25 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 37

MOVEMENT SUMMARY
  Site: 101 [14_Noosa Dr_Coral Tree Ave - Base+dev OP 2025
PM Peak (Weekend) (Site Folder: Site 1)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov         Demand         Arrival      Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.     Aver.
 ID          Class          Flows        Flows       Satn    Delay Service              Queue           Que      Stop    No. of    Speed
                      [ Total HV ] [ Total HV ]                                    [ Veh.   Dist ]               Rate    Cycles
                       veh/h % veh/h %                 v/c      sec                  veh      m                                     km/h
 East: Noosa Drive (E)
 5       T1 All MCs       507 1.3      507 1.3      0.360       3.9    LOS A         3.4      24.2      0.11     0.43       0.11     52.0
 6       R2 All MCs        12 0.0       12 0.0      0.360       9.0    LOS A         3.4      24.2      0.11     0.43       0.11     45.4
 6u       U     All MCs    88 2.5       88 2.5      0.360      11.2    LOS B         3.4      24.2      0.11     0.43       0.11     45.0
 Approach                 607 1.5      607 1.5      0.360       5.0    LOS A         3.4      24.2      0.11     0.43       0.11     51.2

 North: Coral Tree Ave (N)
 7       L2 All MCs        16 0.0       16 0.0      0.030       7.4    LOS A         0.2       1.3      0.69     0.65      0.69      41.1
 9       R2 All MCs          8 0.0       8 0.0      0.030      12.7    LOS B         0.2       1.3      0.69     0.65      0.69      47.3
 Approach                  24 0.0       24 0.0      0.030       9.3    LOS A         0.2       1.3      0.69     0.65      0.69      43.9

 West: Noosa Drive (W)
 10      L2 All MCs        16 0.0       16 0.0      0.422       4.4    LOS A         3.5      24.7      0.39     0.41      0.39      50.9
 11      T1 All MCs       568 0.8      568 0.8      0.422       4.7    LOS A         3.5      24.7      0.39     0.41      0.39      51.2
 12u      U     All MCs      1 0.0       1 0.0      0.422      11.9    LOS B         3.5      24.7      0.39     0.41      0.39      52.8
 Approach                 585 0.8      585 0.8      0.422       4.7    LOS A         3.5      24.7      0.39     0.41      0.39      51.2

 All Vehicles             1217 1.1 1217 1.1         0.422       4.9    LOS A         3.5      24.7      0.26     0.42      0.26      51.1

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:26 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 38

SITE LAYOUT
  Site: 101 [1_Grant St_Noosa Dr_Sunshine Rd - Existing 2022
AM Peak (Weekday) (Site Folder: Site 2)]
New Site
Site Category: (None)
Roundabout

Layout pictures are schematic functional drawings reflecting input data. They are not design drawings.




SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Created: Wednesday, 16 July 2025 2:58:29 PM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 39

MOVEMENT SUMMARY
  Site: 101 [1_Grant St_Noosa Dr_Sunshine Rd - Existing 2022
AM Peak (Weekday) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov       Demand         Arrival        Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class        Flows        Flows         Satn    Delay Service              Queue           Que      Stop    No. of   Speed
                    [ Total HV ] [ Total HV ]                                      [ Veh.   Dist ]               Rate    Cycles
                     veh/h % veh/h %                   v/c      sec                  veh      m                                     km/h
 South: Sunshine Beach Road (S)
 1       L2 All MCs        187 6.2     187 6.2      0.212       6.5    LOS A         1.3       9.8      0.60     0.59      0.60      49.6
 2       T1 All MCs          9 0.0       9 0.0      0.212       6.3    LOS A         1.3       9.8      0.60     0.59      0.60      53.4
 3       R2 All MCs        318 4.6     318 4.6      0.304      11.0    LOS B         2.2      15.8      0.61     0.65      0.61      48.9
 3u       U     All MCs     51 2.1      51 2.1      0.304      13.1    LOS B         2.2      15.8      0.61     0.65      0.61      49.0
 Approach                  565 4.8     565 4.8      0.304       9.6    LOS A         2.2      15.8      0.61     0.63      0.61      49.1

 East: Noosa Drive (E)
 4       L2 All MCs        226 5.1     226 5.1      0.231       6.4    LOS A         1.6       11.5     0.63     0.59      0.63      52.8
 5       T1 All MCs        219 2.9     219 2.9      0.199       5.8    LOS A         1.4      10.0      0.60     0.54      0.60      49.4
 6       R2 All MCs          7 0.0       7 0.0      0.199      10.8    LOS B         1.4      10.0      0.60     0.54      0.60      51.6
 6u       U     All MCs     13 0.0      13 0.0      0.199      13.0    LOS B         1.4      10.0      0.60     0.54      0.60      51.6
 Approach                  465 3.8     465 3.8      0.231       6.4    LOS A         1.6       11.5     0.61     0.56      0.61      51.4

 North: Grant Street (N)
 7       L2 All MCs          3 0.0       3 0.0      0.120      10.8    LOS B         0.8       5.7      0.84     0.75      0.84      48.1
 8       T1 All MCs         26 0.0      26 0.0      0.120      11.0    LOS B         0.8       5.7      0.84     0.75      0.84      48.4
 9       R2 All MCs         43 0.0      43 0.0      0.120      16.1    LOS B         0.8       5.7      0.84     0.75      0.84      43.7
 9u       U     All MCs      1 0.0       1 0.0      0.120      18.3    LOS B         0.8       5.7      0.84     0.75      0.84      47.6
 Approach                   74 0.0      74 0.0      0.120      14.1    LOS B         0.8       5.7      0.84     0.75      0.84      45.9

 West: Noosa Drive (W)
 10      L2 All MCs         28 0.0      28 0.0      0.225       5.7    LOS A         1.6       11.3     0.61     0.55      0.61      49.4
 11      T1 All MCs        238 3.5     238 3.5      0.225       5.8    LOS A         1.6       11.3     0.61     0.55      0.61      49.9
 12      R2 All MCs        155 2.7     155 2.7      0.250      11.5    LOS B         1.7      12.0      0.64     0.68      0.64      44.9
 12u      U     All MCs     89 2.4      89 2.4      0.250      13.6    LOS B         1.7      12.0      0.64     0.68      0.64      37.7
 Approach                  511 2.9     511 2.9      0.250       8.9    LOS A         1.7      12.0      0.63     0.61      0.63      46.5

 All Vehicles             1615 3.7 1615 3.7         0.304       8.7    LOS A         2.2      15.8      0.63     0.61      0.63      48.9

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:27 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 40

MOVEMENT SUMMARY
  Site: 101 [2_Grant St_Noosa Dr_Sunshine Rd - Base 2025 AM
Peak (Weekday) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov       Demand         Arrival        Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class        Flows        Flows         Satn    Delay Service              Queue           Que      Stop    No. of   Speed
                    [ Total HV ] [ Total HV ]                                      [ Veh.   Dist ]               Rate    Cycles
                     veh/h % veh/h %                   v/c      sec                  veh      m                                     km/h
 South: Sunshine Beach Road (S)
 1       L2 All MCs        194 6.2     194 6.2      0.222       6.6    LOS A         1.4      10.3      0.62     0.60      0.62      49.6
 2       T1 All MCs          9 0.0       9 0.0      0.222       6.4    LOS A         1.4      10.3      0.62     0.60      0.62      53.3
 3       R2 All MCs        329 4.6     329 4.6      0.318      11.1    LOS B         2.3      16.8      0.63     0.65      0.63      48.8
 3u       U     All MCs     53 2.1      53 2.1      0.318      13.2    LOS B         2.3      16.8      0.63     0.65      0.63      48.9
 Approach                  585 4.8     585 4.8      0.318       9.7    LOS A         2.3      16.8      0.63     0.63      0.63      49.1

 East: Noosa Drive (E)
 4       L2 All MCs        235 5.1     235 5.1      0.243       6.6    LOS A         1.7      12.3      0.65     0.60      0.65      52.8
 5       T1 All MCs        227 2.9     227 2.9      0.208       5.9    LOS A         1.5      10.6      0.61     0.55      0.61      49.3
 6       R2 All MCs          7 0.0       7 0.0      0.208      10.9    LOS B         1.5      10.6      0.61     0.55      0.61      51.5
 6u       U     All MCs     13 0.0      13 0.0      0.208      13.1    LOS B         1.5      10.6      0.61     0.55      0.61      51.5
 Approach                  482 3.9     482 3.9      0.243       6.5    LOS A         1.7      12.3      0.63     0.57      0.63      51.3

 North: Grant Street (N)
 7       L2 All MCs          3 0.0       3 0.0      0.128      11.3    LOS B         0.9       6.2      0.85     0.76      0.85      47.8
 8       T1 All MCs         27 0.0      27 0.0      0.128      11.5    LOS B         0.9       6.2      0.85     0.76      0.85      48.1
 9       R2 All MCs         44 0.0      44 0.0      0.128      16.6    LOS B         0.9       6.2      0.85     0.76      0.85      43.3
 9u       U     All MCs      1 0.0       1 0.0      0.128      18.8    LOS B         0.9       6.2      0.85     0.76      0.85      47.4
 Approach                   76 0.0      76 0.0      0.128      14.6    LOS B         0.9       6.2      0.85     0.76      0.85      45.6

 West: Noosa Drive (W)
 10      L2 All MCs         29 0.0      29 0.0      0.236       5.8    LOS A         1.7      12.0      0.63     0.55      0.63      49.4
 11      T1 All MCs        246 3.5     246 3.5      0.236       5.9    LOS A         1.7      12.0      0.63     0.55      0.63      49.8
 12      R2 All MCs        160 2.7     160 2.7      0.262      11.6    LOS B         1.8      12.7      0.66     0.68      0.66      44.9
 12u      U     All MCs     93 2.4      93 2.4      0.262      13.8    LOS B         1.8      12.7      0.66     0.68      0.66      37.7
 Approach                  528 2.9     528 2.9      0.262       9.0    LOS A         1.8      12.7      0.64     0.61      0.64      46.4

 All Vehicles             1672 3.7 1672 3.7         0.318       8.8    LOS A         2.3      16.8      0.64     0.62      0.64      48.8

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:28 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 41

MOVEMENT SUMMARY
   Site: 101 [4_Grant St_Noosa Dr_Sunshine Rd - Base+dev OP
2025 AM Peak (Weekday) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov       Demand         Arrival        Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class        Flows        Flows         Satn    Delay Service              Queue           Que      Stop    No. of   Speed
                    [ Total HV ] [ Total HV ]                                      [ Veh.   Dist ]               Rate    Cycles
                     veh/h % veh/h %                   v/c      sec                  veh      m                                     km/h
 South: Sunshine Beach Road (S)
 1       L2 All MCs        194 6.2     194 6.2      0.224       6.7    LOS A         1.4      10.4      0.62     0.60      0.62      49.5
 2       T1 All MCs          9 0.0       9 0.0      0.224       6.5    LOS A         1.4      10.4      0.62     0.60      0.62      53.2
 3       R2 All MCs        329 4.6     329 4.6      0.321      11.1    LOS B         2.3      16.9      0.64     0.66      0.64      48.8
 3u       U     All MCs     53 2.1      53 2.1      0.321      13.3    LOS B         2.3      16.9      0.64     0.66      0.64      48.9
 Approach                  585 4.8     585 4.8      0.321       9.8    LOS A         2.3      16.9      0.63     0.64      0.63      49.0

 East: Noosa Drive (E)
 4       L2 All MCs        235 5.1     235 5.1      0.246       6.7    LOS A         1.7      12.4      0.65     0.60      0.65      52.7
 5       T1 All MCs        227 2.9     227 2.9      0.210       5.9    LOS A         1.5      10.7      0.62     0.55      0.62      49.3
 6       R2 All MCs          7 0.0       7 0.0      0.210      10.9    LOS B         1.5      10.7      0.62     0.55      0.62      51.5
 6u       U     All MCs     13 0.0      13 0.0      0.210      13.1    LOS B         1.5      10.7      0.62     0.55      0.62      51.5
 Approach                  482 3.9     482 3.9      0.246       6.6    LOS A         1.7      12.4      0.64     0.58      0.64      51.3

 North: Grant Street (N)
 7       L2 All MCs          3 0.0       3 0.0      0.145      11.4    LOS B         1.0       7.1      0.86     0.76      0.86      47.6
 8       T1 All MCs         27 0.0      27 0.0      0.145      11.6    LOS B         1.0       7.1      0.86     0.76      0.86      47.9
 9       R2 All MCs         55 0.0      55 0.0      0.145      16.7    LOS B         1.0       7.1      0.86     0.76      0.86      43.1
 9u       U     All MCs      1 0.0       1 0.0      0.145      18.9    LOS B         1.0       7.1      0.86     0.76      0.86      47.2
 Approach                   86 0.0      86 0.0      0.145      14.9    LOS B         1.0       7.1      0.86     0.76      0.86      45.1

 West: Noosa Drive (W)
 10      L2 All MCs         40 0.0      40 0.0      0.245       5.8    LOS A         1.7      12.6      0.64     0.56      0.64      49.4
 11      T1 All MCs        246 3.5     246 3.5      0.245       5.9    LOS A         1.7      12.6      0.64     0.56      0.64      49.8
 12      R2 All MCs        160 2.7     160 2.7      0.263      11.6    LOS B         1.8      12.8      0.66     0.68      0.66      44.9
 12u      U     All MCs     93 2.4      93 2.4      0.263      13.8    LOS B         1.8      12.8      0.66     0.68      0.66      37.7
 Approach                  539 2.8     539 2.8      0.263       8.9    LOS A         1.8      12.8      0.65     0.61      0.65      46.5

 All Vehicles             1693 3.7 1693 3.7         0.321       8.9    LOS A         2.3      16.9      0.65     0.62      0.65      48.8

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:28 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 42

MOVEMENT SUMMARY
  Site: 101 [6_Grant St_Noosa Dr_Sunshine Rd - Existing 2022
PM Peak (Weekday) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov       Demand         Arrival        Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class        Flows        Flows         Satn    Delay Service              Queue           Que      Stop    No. of   Speed
                    [ Total HV ] [ Total HV ]                                      [ Veh.   Dist ]               Rate    Cycles
                     veh/h % veh/h %                   v/c      sec                  veh      m                                     km/h
 South: Sunshine Beach Road (S)
 1       L2 All MCs        249 0.8     249 0.8      0.304       7.1    LOS A         2.1      15.1      0.72     0.64      0.72      49.5
 2       T1 All MCs         20 0.0      20 0.0      0.304       7.1    LOS A         2.1      15.1      0.72     0.64      0.72      52.8
 3       R2 All MCs        337 3.1     337 3.1      0.355      11.6    LOS B         2.8      19.9      0.73     0.68      0.73      48.6
 3u       U     All MCs     56 1.9      56 1.9      0.355      13.8    LOS B         2.8      19.9      0.73     0.68      0.73      48.6
 Approach                  662 2.1     662 2.1      0.355      10.0    LOS A         2.8      19.9      0.72     0.66      0.72      49.0

 East: Noosa Drive (E)
 4       L2 All MCs        453 2.3     453 2.3      0.404       6.7    LOS A         3.3      23.8      0.75     0.62      0.75      52.5
 5       T1 All MCs        324 1.6     324 1.6      0.396       7.5    LOS A         3.0      21.6      0.76     0.64      0.76      48.5
 6       R2 All MCs         11 0.0      11 0.0      0.396      12.5    LOS B         3.0      21.6      0.76     0.64      0.76      50.8
 6u       U     All MCs     23 0.0      23 0.0      0.396      14.7    LOS B         3.0      21.6      0.76     0.64      0.76      50.8
 Approach                  811 1.9     811 1.9      0.404       7.3    LOS A         3.3      23.8      0.75     0.63      0.75      51.1

 North: Grant Street (N)
 7       L2 All MCs          8 0.0       8 0.0      0.114      12.8    LOS B         0.8       5.6      0.89     0.77      0.89      47.4
 8       T1 All MCs         26 0.0      26 0.0      0.114      13.0    LOS B         0.8       5.6      0.89     0.77      0.89      47.6
 9       R2 All MCs         23 4.5      23 4.5      0.114      18.5    LOS B         0.8       5.6      0.89     0.77      0.89      42.5
 9u       U     All MCs      1 0.0       1 0.0      0.114      20.3    LOS C         0.8       5.6      0.89     0.77      0.89      46.9
 Approach                   59 1.8      59 1.8      0.114      15.3    LOS B         0.8       5.6      0.89     0.77      0.89      45.9

 West: Noosa Drive (W)
 10      L2 All MCs         24 0.0      24 0.0      0.288       6.8    LOS A         2.0      14.2      0.69     0.60      0.69      49.0
 11      T1 All MCs        239 2.6     239 2.6      0.288       6.8    LOS A         2.0      14.2      0.69     0.60      0.69      49.5
 12      R2 All MCs        244 0.0     244 0.0      0.292      11.2    LOS B         2.2      15.3      0.68     0.67      0.68      45.0
 12u      U     All MCs     93 1.1      93 1.1      0.292      13.4    LOS B         2.2      15.3      0.68     0.67      0.68      37.8
 Approach                  600 1.2     600 1.2      0.292       9.6    LOS A         2.2      15.3      0.68     0.64      0.68      46.1

 All Vehicles             2132 1.8 2132 1.8         0.404       9.0    LOS A         3.3      23.8      0.73     0.65      0.73      49.0

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:30 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 43

MOVEMENT SUMMARY
  Site: 101 [7_Grant St_Noosa Dr_Sunshine Rd - Base 2025 PM
Peak (Weekday) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov       Demand         Arrival        Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class        Flows        Flows         Satn    Delay Service              Queue           Que      Stop    No. of   Speed
                    [ Total HV ] [ Total HV ]                                      [ Veh.   Dist ]               Rate    Cycles
                     veh/h % veh/h %                   v/c      sec                  veh      m                                     km/h
 South: Sunshine Beach Road (S)
 1       L2 All MCs        259 0.8     259 0.8      0.321       7.3    LOS A         2.3      16.1      0.74     0.65      0.74      49.3
 2       T1 All MCs         21 0.0      21 0.0      0.321       7.2    LOS A         2.3      16.1      0.74     0.65      0.74      52.7
 3       R2 All MCs        349 3.1     349 3.1      0.373      11.7    LOS B         3.0      21.2      0.75     0.68      0.75      48.5
 3u       U     All MCs     58 1.9      58 1.9      0.373      13.9    LOS B         3.0      21.2      0.75     0.68      0.75      48.6
 Approach                  687 2.1     687 2.1      0.373      10.1    LOS B         3.0      21.2      0.74     0.67      0.74      48.9

 East: Noosa Drive (E)
 4       L2 All MCs        463 2.3     463 2.3      0.420       6.8    LOS A         3.5      25.1      0.77     0.63      0.77      52.4
 5       T1 All MCs        332 1.6     332 1.6      0.413       7.6    LOS A         3.2      22.8      0.78     0.65      0.78      48.3
 6       R2 All MCs         11 0.0      11 0.0      0.413      12.6    LOS B         3.2      22.8      0.78     0.65      0.78      50.7
 6u       U     All MCs     24 0.0      24 0.0      0.413      14.8    LOS B         3.2      22.8      0.78     0.65      0.78      50.7
 Approach                  829 1.9     829 1.9      0.420       7.4    LOS A         3.5      25.1      0.77     0.64      0.77      51.0

 North: Grant Street (N)
 7       L2 All MCs          8 0.0       8 0.0      0.124      13.6    LOS B         0.9       6.2      0.91     0.78      0.91      46.9
 8       T1 All MCs         27 0.0      27 0.0      0.124      13.8    LOS B         0.9       6.2      0.91     0.78      0.91      47.2
 9       R2 All MCs         24 4.5      24 4.5      0.124      19.3    LOS B         0.9       6.2      0.91     0.78      0.91      41.9
 9u       U     All MCs      1 0.0       1 0.0      0.124      21.1    LOS C         0.9       6.2      0.91     0.78      0.91      46.5
 Approach                   61 1.8      61 1.8      0.124      16.1    LOS B         0.9       6.2      0.91     0.78      0.91      45.3

 West: Noosa Drive (W)
 10      L2 All MCs         25 0.0      25 0.0      0.303       6.9    LOS A         2.1      15.1      0.71     0.62      0.71      48.9
 11      T1 All MCs        247 2.6     247 2.6      0.303       7.0    LOS A         2.1      15.1      0.71     0.62      0.71      49.3
 12      R2 All MCs        253 0.0     253 0.0      0.306      11.3    LOS B         2.3      16.3      0.70     0.67      0.70      45.0
 12u      U     All MCs     96 1.1      96 1.1      0.306      13.5    LOS B         2.3      16.3      0.70     0.67      0.70      37.7
 Approach                  621 1.2     621 1.2      0.306       9.8    LOS A         2.3      16.3      0.70     0.65      0.70      46.0

 All Vehicles             2199 1.8 2199 1.8         0.420       9.2    LOS A         3.5      25.1      0.75     0.65      0.75      48.9

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:30 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 44

MOVEMENT SUMMARY
   Site: 101 [9_Grant St_Noosa Dr_Sunshine Rd - Base+dev OP
2025 PM Peak (Weekday) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov       Demand         Arrival        Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class        Flows        Flows         Satn    Delay Service              Queue           Que      Stop    No. of   Speed
                    [ Total HV ] [ Total HV ]                                      [ Veh.   Dist ]               Rate    Cycles
                     veh/h % veh/h %                   v/c      sec                  veh      m                                     km/h
 South: Sunshine Beach Road (S)
 1       L2 All MCs        259 0.8     259 0.8      0.326       7.4    LOS A         2.3      16.4      0.75     0.66      0.75      49.2
 2       T1 All MCs         21 0.0      21 0.0      0.326       7.4    LOS A         2.3      16.4      0.75     0.66      0.75      52.6
 3       R2 All MCs        349 3.1     349 3.1      0.378      11.9    LOS B         3.0      21.6      0.76     0.68      0.76      48.5
 3u       U     All MCs     58 1.9      58 1.9      0.378      14.0    LOS B         3.0      21.6      0.76     0.68      0.76      48.5
 Approach                  687 2.1     687 2.1      0.378      10.2    LOS B         3.0      21.6      0.75     0.67      0.75      48.8

 East: Noosa Drive (E)
 4       L2 All MCs        469 2.3     469 2.3      0.429       6.9    LOS A         3.6      25.7      0.78     0.64      0.78      52.4
 5       T1 All MCs        336 1.6     336 1.6      0.422       7.8    LOS A         3.3      23.3      0.79     0.65      0.79      48.3
 6       R2 All MCs         11 0.0      11 0.0      0.422      12.8    LOS B         3.3      23.3      0.79     0.65      0.79      50.7
 6u       U     All MCs     24 0.0      24 0.0      0.422      15.0    LOS B         3.3      23.3      0.79     0.65      0.79      50.7
 Approach                  840 1.9     840 1.9      0.429       7.6    LOS A         3.6      25.7      0.78     0.65      0.78      50.9

 North: Grant Street (N)
 7       L2 All MCs          8 0.0       8 0.0      0.146      13.7    LOS B         1.0       7.4      0.91     0.79      0.91      46.6
 8       T1 All MCs         27 0.0      27 0.0      0.146      13.9    LOS B         1.0       7.4      0.91     0.79      0.91      46.8
 9       R2 All MCs         35 4.5      35 4.5      0.146      19.4    LOS B         1.0       7.4      0.91     0.79      0.91      41.6
 9u       U     All MCs      1 0.0       1 0.0      0.146      21.2    LOS C         1.0       7.4      0.91     0.79      0.91      46.2
 Approach                   72 2.2      72 2.2      0.146      16.7    LOS B         1.0       7.4      0.91     0.79      0.91      44.6

 West: Noosa Drive (W)
 10      L2 All MCs         36 0.0      36 0.0      0.314       6.9    LOS A         2.2      15.8      0.72     0.62      0.72      48.9
 11      T1 All MCs        247 2.6     247 2.6      0.314       7.0    LOS A         2.2      15.8      0.72     0.62      0.72      49.3
 12      R2 All MCs        253 0.0     253 0.0      0.306      11.3    LOS B         2.3      16.3      0.70     0.67      0.70      45.0
 12u      U     All MCs     96 1.1      96 1.1      0.306      13.5    LOS B         2.3      16.3      0.70     0.67      0.70      37.7
 Approach                  632 1.2     632 1.2      0.314       9.7    LOS A         2.3      16.3      0.71     0.65      0.71      46.0

 All Vehicles             2231 1.8 2231 1.8         0.429       9.3    LOS A         3.6      25.7      0.76     0.66      0.76      48.8

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:31 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 45

MOVEMENT SUMMARY
   Site: 101 [11_Grant St_Noosa Dr_Sunshine Rd - Existing
2022 PM Peak (Weekend) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov       Demand         Arrival        Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class        Flows        Flows         Satn    Delay Service              Queue           Que      Stop    No. of   Speed
                    [ Total HV ] [ Total HV ]                                      [ Veh.   Dist ]               Rate    Cycles
                     veh/h % veh/h %                   v/c      sec                  veh      m                                     km/h
 South: Sunshine Beach Road (S)
 1       L2 All MCs        246 0.4     246 0.4      0.258       6.0    LOS A         1.7      12.1      0.59     0.57      0.59      50.2
 2       T1 All MCs         19 0.0      19 0.0      0.258       6.0    LOS A         1.7      12.1      0.59     0.57      0.59      53.4
 3       R2 All MCs        342 3.1     342 3.1      0.317      10.7    LOS B         2.3      16.8      0.60     0.64      0.60      49.0
 3u       U     All MCs     56 1.9      56 1.9      0.317      12.9    LOS B         2.3      16.8      0.60     0.64      0.60      49.0
 Approach                  663 1.9     663 1.9      0.317       9.0    LOS A         2.3      16.8      0.60     0.61      0.60      49.4

 East: Noosa Drive (E)
 4       L2 All MCs        373 2.8     373 2.8      0.306       5.8    LOS A         2.4      16.9      0.63     0.57      0.63      52.9
 5       T1 All MCs        236 1.8     236 1.8      0.254       6.4    LOS A         1.8      12.7      0.63     0.56      0.63      49.4
 6       R2 All MCs          4 25.0      4 25.0     0.254      12.4    LOS B         1.8      12.7      0.63     0.56      0.63      50.7
 6u       U     All MCs      8 0.0       8 0.0      0.254      13.6    LOS B         1.8      12.7      0.63     0.56      0.63      51.5
 Approach                  621 2.5     621 2.5      0.306       6.2    LOS A         2.4      16.9      0.63     0.56      0.63      51.7

 North: Grant Street (N)
 7       L2 All MCs          5 0.0       5 0.0      0.064      11.8    LOS B         0.4       3.1      0.86     0.76      0.86      47.6
 8       T1 All MCs         11 0.0      11 0.0      0.064      12.1    LOS B         0.4       3.1      0.86     0.76      0.86      47.8
 9       R2 All MCs         19 0.0      19 0.0      0.064      17.1    LOS B         0.4       3.1      0.86     0.76      0.86      43.1
 9u       U     All MCs      1 0.0       1 0.0      0.064      19.3    LOS B         0.4       3.1      0.86     0.76      0.86      47.1
 Approach                   36 0.0      36 0.0      0.064      14.9    LOS B         0.4       3.1      0.86     0.76      0.86      45.5

 West: Noosa Drive (W)
 10      L2 All MCs         26 0.0      26 0.0      0.269       6.0    LOS A         1.9      13.7      0.65     0.56      0.65      49.2
 11      T1 All MCs        291 1.1     291 1.1      0.269       6.0    LOS A         1.9      13.7      0.65     0.56      0.65      49.7
 12      R2 All MCs        196 0.0     196 0.0      0.269      11.6    LOS B         1.8      12.8      0.66     0.68      0.66      45.1
 12u      U     All MCs     61 3.4      61 3.4      0.269      14.0    LOS B         1.8      12.8      0.66     0.68      0.66      37.7
 Approach                  574 0.9     574 0.9      0.269       8.8    LOS A         1.9      13.7      0.65     0.62      0.65      47.0

 All Vehicles             1894 1.8 1894 1.8         0.317       8.1    LOS A         2.4      16.9      0.63     0.60      0.63      49.5

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:32 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 46

MOVEMENT SUMMARY
  Site: 101 [12_Grant St_Noosa Dr_Sunshine Rd - Base 2025
PM Peak (Weekend) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov       Demand         Arrival        Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class        Flows        Flows         Satn    Delay Service              Queue           Que      Stop    No. of   Speed
                    [ Total HV ] [ Total HV ]                                      [ Veh.   Dist ]               Rate    Cycles
                     veh/h % veh/h %                   v/c      sec                  veh      m                                     km/h
 South: Sunshine Beach Road (S)
 1       L2 All MCs        256 0.4     256 0.4      0.262       6.1    LOS A         1.8      12.4      0.61     0.58      0.61      50.2
 2       T1 All MCs          9 0.0       9 0.0      0.262       6.1    LOS A         1.8      12.4      0.61     0.58      0.61      53.4
 3       R2 All MCs        355 3.1     355 3.1      0.332      10.8    LOS B         2.5      17.8      0.61     0.64      0.61      48.9
 3u       U     All MCs     58 1.9      58 1.9      0.332      13.0    LOS B         2.5      17.8      0.61     0.64      0.61      49.0
 Approach                  678 1.9     678 1.9      0.332       9.1    LOS A         2.5      17.8      0.61     0.62      0.61      49.3

 East: Noosa Drive (E)
 4       L2 All MCs        386 2.8     386 2.8      0.321       5.9    LOS A         2.5      17.9      0.65     0.57      0.65      52.8
 5       T1 All MCs        244 1.8     244 1.8      0.266       6.5    LOS A         1.9      13.4      0.65     0.57      0.65      49.3
 6       R2 All MCs          4 25.0      4 25.0     0.266      12.5    LOS B         1.9      13.4      0.65     0.57      0.65      50.6
 6u       U     All MCs      8 0.0       8 0.0      0.266      13.7    LOS B         1.9      13.4      0.65     0.57      0.65      51.5
 Approach                  643 2.5     643 2.5      0.321       6.3    LOS A         2.5      17.9      0.65     0.57      0.65      51.7

 North: Grant Street (N)
 7       L2 All MCs          5 0.0       5 0.0      0.069      12.5    LOS B         0.5       3.4      0.88     0.77      0.88      47.2
 8       T1 All MCs         11 0.0      11 0.0      0.069      12.7    LOS B         0.5       3.4      0.88     0.77      0.88      47.4
 9       R2 All MCs         20 0.0      20 0.0      0.069      17.8    LOS B         0.5       3.4      0.88     0.77      0.88      42.6
 9u       U     All MCs      1 0.0       1 0.0      0.069      20.0    LOS B         0.5       3.4      0.88     0.77      0.88      46.7
 Approach                   37 0.0      37 0.0      0.069      15.7    LOS B         0.5       3.4      0.88     0.77      0.88      45.0

 West: Noosa Drive (W)
 10      L2 All MCs         27 0.0      27 0.0      0.281       6.0    LOS A         2.1      14.6      0.66     0.57      0.66      49.1
 11      T1 All MCs        301 1.1     301 1.1      0.281       6.0    LOS A         2.1      14.6      0.66     0.57      0.66      49.7
 12      R2 All MCs        203 0.0     203 0.0      0.282      11.7    LOS B         1.9      13.7      0.68     0.69      0.68      45.1
 12u      U     All MCs     63 3.4      63 3.4      0.282      14.1    LOS B         1.9      13.7      0.68     0.69      0.68      37.7
 Approach                  595 0.9     595 0.9      0.282       8.8    LOS A         2.1      14.6      0.67     0.62      0.67      46.9

 All Vehicles             1953 1.8 1953 1.8         0.332       8.2    LOS A         2.5      17.9      0.65     0.61      0.65      49.4

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:33 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 47

MOVEMENT SUMMARY
  Site: 101 [14_Grant St_Noosa Dr_Sunshine Rd - Base+dev
OP 2025 PM Peak (Weekend) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov       Demand         Arrival        Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class        Flows        Flows         Satn    Delay Service              Queue           Que      Stop    No. of   Speed
                    [ Total HV ] [ Total HV ]                                      [ Veh.   Dist ]               Rate    Cycles
                     veh/h % veh/h %                   v/c      sec                  veh      m                                     km/h
 South: Sunshine Beach Road (S)
 1       L2 All MCs        256 0.4     256 0.4      0.269       6.0    LOS A         1.8      12.8      0.60     0.57      0.60      50.2
 2       T1 All MCs         20 0.0      20 0.0      0.269       6.0    LOS A         1.8      12.8      0.60     0.57      0.60      53.4
 3       R2 All MCs        355 3.1     355 3.1      0.330      10.7    LOS B         2.5      17.7      0.61     0.64      0.61      48.9
 3u       U     All MCs     58 1.9      58 1.9      0.330      12.9    LOS B         2.5      17.7      0.61     0.64      0.61      49.0
 Approach                  688 1.9     688 1.9      0.330       9.0    LOS A         2.5      17.7      0.60     0.61      0.60      49.4

 East: Noosa Drive (E)
 4       L2 All MCs        386 2.8     386 2.8      0.319       5.9    LOS A         2.5      17.8      0.64     0.57      0.64      52.8
 5       T1 All MCs        244 1.8     244 1.8      0.264       6.4    LOS A         1.9      13.3      0.64     0.56      0.64      49.4
 6       R2 All MCs          4 25.0      4 25.0     0.264      12.4    LOS B         1.9      13.3      0.64     0.56      0.64      50.6
 6u       U     All MCs      8 0.0       8 0.0      0.264      13.6    LOS B         1.9      13.3      0.64     0.56      0.64      51.5
 Approach                  643 2.5     643 2.5      0.319       6.2    LOS A         2.5      17.8      0.64     0.57      0.64      51.7

 North: Grant Street (N)
 7       L2 All MCs          5 0.0       5 0.0      0.049      12.4    LOS B         0.3       2.4      0.87     0.76      0.87      47.7
 8       T1 All MCs         11 0.0      11 0.0      0.049      12.6    LOS B         0.3       2.4      0.87     0.76      0.87      47.9
 9       R2 All MCs          9 0.0       9 0.0      0.049      17.7    LOS B         0.3       2.4      0.87     0.76      0.87      43.2
 9u       U     All MCs      1 0.0       1 0.0      0.049      19.9    LOS B         0.3       2.4      0.87     0.76      0.87      47.2
 Approach                   26 0.0      26 0.0      0.049      14.7    LOS B         0.3       2.4      0.87     0.76      0.87      46.4

 West: Noosa Drive (W)
 10      L2 All MCs         38 0.0      38 0.0      0.291       6.1    LOS A         2.1      15.1      0.67     0.57      0.67      49.1
 11      T1 All MCs        301 1.1     301 1.1      0.291       6.1    LOS A         2.1      15.1      0.67     0.57      0.67      49.7
 12      R2 All MCs        203 0.0     203 0.0      0.284      11.8    LOS B         1.9      13.7      0.68     0.69      0.68      45.1
 12u      U     All MCs     63 3.4      63 3.4      0.284      14.2    LOS B         1.9      13.7      0.68     0.69      0.68      37.6
 Approach                  605 0.9     605 0.9      0.291       8.9    LOS A         2.1      15.1      0.67     0.62      0.67      47.0

 All Vehicles             1963 1.8 1963 1.8         0.330       8.1    LOS A         2.5      17.8      0.64     0.60      0.64      49.5

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:33 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 48

SITE LAYOUT
  Site: 101 [1_Grant St_Banksia Ave - Base 2025 AM Peak
(Weekday) (Site Folder: Site 3)]
New Site
Site Category: (None)
Roundabout

Layout pictures are schematic functional drawings reflecting input data. They are not design drawings.

Page 49

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Created: Wednesday, 16 July 2025 2:59:59 PM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 50

MOVEMENT SUMMARY
  Site: 101 [1_Grant St_Banksia Ave - Base 2025 AM Peak
(Weekday) (Site Folder: Site 3)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov        Demand         Arrival       Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class         Flows        Flows        Satn    Delay Service              Queue           Que      Stop    No. of   Speed
                     [ Total HV ] [ Total HV ]                                     [ Veh.   Dist ]               Rate    Cycles
                      veh/h % veh/h %                  v/c      sec                  veh      m                                     km/h
 South: Banksia Ave (S)
 2       T1 All MCs          1 0.0       1 0.0      0.002       3.2    LOS A         0.0       0.1      0.20     0.54      0.20      38.4
 3       R2 All MCs          1 0.0       1 0.0      0.002       5.6    LOS A         0.0       0.1      0.20     0.54      0.20      48.7
 Approach                    2 0.0       2 0.0      0.002       4.4    LOS A         0.0       0.1      0.20     0.54      0.20      45.4

 East: Grant St (E)
 4       L2 All MCs          1 0.0       1 0.0      0.036       5.5    LOS A         0.2       1.4      0.04     0.67      0.04      46.1
 6       R2 All MCs        46 0.0       46 0.0      0.036       7.4    LOS A         0.2       1.4      0.04     0.67      0.04      47.3
 6u       U     All MCs      6 0.0       6 0.0      0.036       8.7    LOS A         0.2       1.4      0.04     0.67      0.04      51.0
 Approach                  54 0.0       54 0.0      0.036       7.5    LOS A         0.2       1.4      0.04     0.67      0.04      47.8

 North: Banksia Ave (N)
 7       L2 All MCs        63 0.0       63 0.0      0.047       5.5    LOS A         0.3       1.8      0.06     0.58      0.06      49.1
 8       T1 All MCs          2 0.0       2 0.0      0.047       4.8    LOS A         0.3       1.8      0.06     0.58      0.06      36.6
 9u       U     All MCs      1 0.0       1 0.0      0.047       8.8    LOS A         0.3       1.8      0.06     0.58      0.06      40.6
 Approach                  66 0.0       66 0.0      0.047       5.5    LOS A         0.3       1.8      0.06     0.58      0.06      48.9

 All Vehicles             122 0.0      122 0.0      0.047       6.4    LOS A         0.3       1.8      0.05     0.62      0.05      48.4

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:34 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 51

MOVEMENT SUMMARY
  Site: 101 [1_Grant St_Banksia Ave - Base+dev OP 2025 AM
Peak (Weekday) (Site Folder: Site 3)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov        Demand         Arrival       Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class         Flows        Flows        Satn    Delay Service              Queue           Que      Stop    No. of   Speed
                     [ Total HV ] [ Total HV ]                                     [ Veh.   Dist ]               Rate    Cycles
                      veh/h % veh/h %                  v/c      sec                  veh      m                                     km/h
 South: Banksia Ave (S)
 2       T1 All MCs          1 0.0       1 0.0      0.002       3.3    LOS A         0.0       0.1      0.23     0.54      0.23      38.3
 3       R2 All MCs          1 0.0       1 0.0      0.002       5.6    LOS A         0.0       0.1      0.23     0.54      0.23      48.6
 Approach                    2 0.0       2 0.0      0.002       4.5    LOS A         0.0       0.1      0.23     0.54      0.23      45.3

 East: Grant St (E)
 4       L2 All MCs          1 0.0       1 0.0      0.043       5.5    LOS A         0.2       1.7      0.04     0.67      0.04      46.1
 6       R2 All MCs        57 0.0       57 0.0      0.043       7.4    LOS A         0.2       1.7      0.04     0.67      0.04      47.3
 6u       U     All MCs      6 0.0       6 0.0      0.043       8.7    LOS A         0.2       1.7      0.04     0.67      0.04      51.0
 Approach                  64 0.0       64 0.0      0.043       7.5    LOS A         0.2       1.7      0.04     0.67      0.04      47.8

 North: Banksia Ave (N)
 7       L2 All MCs        74 0.0       74 0.0      0.053       5.5    LOS A         0.3       2.1      0.06     0.58      0.06      49.1
 8       T1 All MCs          2 0.0       2 0.0      0.053       4.8    LOS A         0.3       2.1      0.06     0.58      0.06      36.6
 9u       U     All MCs      1 0.0       1 0.0      0.053       8.8    LOS A         0.3       2.1      0.06     0.58      0.06      40.6
 Approach                  77 0.0       77 0.0      0.053       5.5    LOS A         0.3       2.1      0.06     0.58      0.06      48.9

 All Vehicles             143 0.0      143 0.0      0.053       6.4    LOS A         0.3       2.1      0.05     0.62      0.05      48.3

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:35 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 52

MOVEMENT SUMMARY
  Site: 101 [3_Grant St_Banksia Ave - Base 2025 PM Peak
(Weekday) (Site Folder: Site 3)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov        Demand         Arrival       Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class         Flows        Flows        Satn    Delay Service              Queue           Que      Stop    No. of   Speed
                     [ Total HV ] [ Total HV ]                                     [ Veh.   Dist ]               Rate    Cycles
                      veh/h % veh/h %                  v/c      sec                  veh      m                                     km/h
 South: Banksia Ave (S)
 2       T1 All MCs          1 0.0       1 0.0      0.002       3.3    LOS A         0.0       0.1      0.23     0.54      0.23      38.3
 3       R2 All MCs          1 0.0       1 0.0      0.002       5.7    LOS A         0.0       0.1      0.23     0.54      0.23      48.6
 Approach                    2 0.0       2 0.0      0.002       4.5    LOS A         0.0       0.1      0.23     0.54      0.23      45.3

 East: Grant St (N)
 4       L2 All MCs          1 0.0       1 0.0      0.044       5.5    LOS A         0.3       1.8      0.03     0.68      0.03      46.1
 6       R2 All MCs        53 0.0       53 0.0      0.044       7.4    LOS A         0.3       1.8      0.03     0.68      0.03      47.2
 6u       U     All MCs    14 15.4      14 15.4     0.044       8.9    LOS A         0.3       1.8      0.03     0.68      0.03      50.3
 Approach                  67 3.1       67 3.1      0.044       7.7    LOS A         0.3       1.8      0.03     0.68      0.03      48.0

 North: Banksia Ave (N)
 7       L2 All MCs        47 0.0       47 0.0      0.038       5.6    LOS A         0.2       1.5      0.10     0.57      0.10      49.0
 8       T1 All MCs          1 0.0       1 0.0      0.038       4.9    LOS A         0.2       1.5      0.10     0.57      0.10      36.3
 9u       U     All MCs      1 0.0       1 0.0      0.038       8.8    LOS A         0.2       1.5      0.10     0.57      0.10      40.3
 Approach                  49 0.0       49 0.0      0.038       5.6    LOS A         0.2       1.5      0.10     0.57      0.10      48.8

 All Vehicles             119 1.8      119 1.8      0.044       6.8    LOS A         0.3       1.8      0.06     0.63      0.06      48.3

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:36 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 53

MOVEMENT SUMMARY
  Site: 101 [3_Grant St_Banksia Ave - Base+dev OP 2025 PM
Peak (Weekday) (Site Folder: Site 3)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov        Demand         Arrival       Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class         Flows        Flows        Satn    Delay Service              Queue           Que      Stop    No. of   Speed
                     [ Total HV ] [ Total HV ]                                     [ Veh.   Dist ]               Rate    Cycles
                      veh/h % veh/h %                  v/c      sec                  veh      m                                     km/h
 South: Banksia Ave (S)
 2       T1 All MCs          1 0.0       1 0.0      0.002       3.4    LOS A         0.0       0.1      0.25     0.53      0.25      38.2
 3       R2 All MCs          1 0.0       1 0.0      0.002       5.7    LOS A         0.0       0.1      0.25     0.53      0.25      48.5
 Approach                    2 0.0       2 0.0      0.002       4.6    LOS A         0.0       0.1      0.25     0.53      0.25      45.2

 East: Grant St (N)
 4       L2 All MCs          1 0.0       1 0.0      0.050       5.5    LOS A         0.3       2.1      0.03     0.68      0.03      46.1
 6       R2 All MCs        63 0.0       63 0.0      0.050       7.4    LOS A         0.3       2.1      0.03     0.68      0.03      47.2
 6u       U     All MCs    14 15.4      14 15.4     0.050       8.9    LOS A         0.3       2.1      0.03     0.68      0.03      50.3
 Approach                  78 2.7       78 2.7      0.050       7.6    LOS A         0.3       2.1      0.03     0.68      0.03      47.9

 North: Banksia Ave (N)
 7       L2 All MCs        58 0.0       58 0.0      0.045       5.6    LOS A         0.3       1.8      0.10     0.57      0.10      49.0
 8       T1 All MCs          1 0.0       1 0.0      0.045       4.9    LOS A         0.3       1.8      0.10     0.57      0.10      36.3
 9u       U     All MCs      1 0.0       1 0.0      0.045       8.8    LOS A         0.3       1.8      0.10     0.57      0.10      40.3
 Approach                  60 0.0       60 0.0      0.045       5.6    LOS A         0.3       1.8      0.10     0.57      0.10      48.8

 All Vehicles             140 1.5      140 1.5      0.050       6.7    LOS A         0.3       2.1      0.06     0.63      0.06      48.3

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:37 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 54

MOVEMENT SUMMARY
  Site: 101 [5_Grant St_Banksia Ave - Base 2025 PM Peak
(Weekend) (Site Folder: Site 3)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov        Demand         Arrival       Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.     Aver.
 ID          Class         Flows        Flows        Satn    Delay Service              Queue           Que      Stop    No. of    Speed
                     [ Total HV ] [ Total HV ]                                     [ Veh.   Dist ]               Rate    Cycles
                      veh/h % veh/h %                  v/c      sec                  veh      m                                     km/h
 South: Banksia Ave (S)
 2       T1 All MCs          1 0.0       1 0.0      0.002       3.3    LOS A         0.0       0.1      0.23     0.54      0.23      38.3
 3       R2 All MCs          1 0.0       1 0.0      0.002       5.6    LOS A         0.0       0.1      0.23     0.54      0.23      48.6
 Approach                    2 0.0       2 0.0      0.002       4.5    LOS A         0.0       0.1      0.23     0.54      0.23      45.3

 East: Grant St (N)
 4       L2 All MCs          1 0.0       1 0.0      0.041       5.5    LOS A         0.2       1.7      0.03     0.68      0.03      45.9
 6       R2 All MCs        46 0.0       46 0.0      0.041       7.4    LOS A         0.2       1.7      0.03     0.68      0.03      47.1
 6u       U     All MCs    17 0.0       17 0.0      0.041       8.7    LOS A         0.2       1.7      0.03     0.68      0.03      50.9
 Approach                  64 0.0       64 0.0      0.041       7.7    LOS A         0.2       1.7      0.03     0.68      0.03      48.4

 North: Banksia Ave (N)
 7       L2 All MCs        58 1.9       58 1.9      0.046       5.6    LOS A         0.3       1.8      0.11     0.57       0.11     48.8
 8       T1 All MCs          1 0.0       1 0.0      0.046       4.9    LOS A         0.3       1.8      0.11     0.57       0.11     36.3
 9u       U     All MCs      1 0.0       1 0.0      0.046       8.9    LOS A         0.3       1.8      0.11     0.57       0.11     40.3
 Approach                  60 1.8       60 1.8      0.046       5.6    LOS A         0.3       1.8      0.11     0.57       0.11     48.7

 All Vehicles             126 0.9      126 0.9      0.046       6.7    LOS A         0.3       1.8      0.07     0.62      0.07      48.5

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:38 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 55

MOVEMENT SUMMARY
  Site: 101 [5_Grant St_Banksia Ave - Base+dev OP 2025 PM
Peak (Weekend) (Site Folder: Site 3)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov        Demand         Arrival       Deg.    Aver. Level of          95% Back Of       Prop.      Eff.    Aver.     Aver.
 ID          Class         Flows        Flows        Satn    Delay Service              Queue           Que      Stop    No. of    Speed
                     [ Total HV ] [ Total HV ]                                     [ Veh.   Dist ]               Rate    Cycles
                      veh/h % veh/h %                  v/c      sec                  veh      m                                     km/h
 South: Banksia Ave (S)
 2       T1 All MCs          1 0.0       1 0.0      0.002       3.3    LOS A         0.0       0.1      0.25     0.53      0.25      38.2
 3       R2 All MCs          1 0.0       1 0.0      0.002       5.7    LOS A         0.0       0.1      0.25     0.53      0.25      48.6
 Approach                    2 0.0       2 0.0      0.002       4.5    LOS A         0.0       0.1      0.25     0.53      0.25      45.3

 East: Grant St (N)
 4       L2 All MCs          1 0.0       1 0.0      0.048       5.5    LOS A         0.3       1.9      0.03     0.68      0.03      46.0
 6       R2 All MCs        57 0.0       57 0.0      0.048       7.4    LOS A         0.3       1.9      0.03     0.68      0.03      47.2
 6u       U     All MCs    17 0.0       17 0.0      0.048       8.7    LOS A         0.3       1.9      0.03     0.68      0.03      50.9
 Approach                  75 0.0       75 0.0      0.048       7.7    LOS A         0.3       1.9      0.03     0.68      0.03      48.2

 North: Banksia Ave (N)
 7       L2 All MCs        68 1.9       68 1.9      0.053       5.6    LOS A         0.3       2.2      0.11     0.57       0.11     48.9
 8       T1 All MCs          1 0.0       1 0.0      0.053       4.9    LOS A         0.3       2.2      0.11     0.57       0.11     36.3
 9u       U     All MCs      1 0.0       1 0.0      0.053       8.9    LOS A         0.3       2.2      0.11     0.57       0.11     40.3
 Approach                  71 1.8       71 1.8      0.053       5.6    LOS A         0.3       2.2      0.11     0.57       0.11     48.7

 All Vehicles             147 0.9      147 0.9      0.053       6.6    LOS A         0.3       2.2      0.07     0.62      0.07      48.4

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 24 June 2025 10:56:38 AM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 56

SITE LAYOUT
  Site: 101 [Weyba Road_Mary Street - Exiting 2022 AM Peak
(Weekday) (Site Folder: Site 4)]
New Site
Site Category: (None)
Roundabout

Layout pictures are schematic functional drawings reflecting input data. They are not design drawings.




SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Created: Wednesday, 16 July 2025 3:00:54 PM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 57

MOVEMENT SUMMARY
  Site: 101 [Weyba Road_Mary Street - Exiting 2022 AM Peak
(Weekday) (Site Folder: Site 4)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov             Demand         Arrival   Deg.    Aver. Level of         95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class              Flows        Flows    Satn    Delay Service             Queue           Que      Stop    No. of   Speed
                          [ Total HV ] [ Total HV ]                                [ Veh.   Dist ]               Rate    Cycles
                           veh/h % veh/h %              v/c     sec                  veh      m                                     km/h
 South: Reed Street
 1       L2 All MCs         260 0.0      260 0.0      0.346     8.2    LOS A         2.6      18.0      0.85     0.72      0.85      52.0
 2       T1 All MCs         244 0.0      244 0.0      0.477     7.5    LOS A         4.5      31.2      0.92     0.73      0.94      50.0
 3b      R3 All MCs         244 0.0      244 0.0      0.477    14.8    LOS B         4.5      31.2      0.92     0.73      0.94      49.3
 3u       U     All MCs        4 0.0        4 0.0     0.477    16.1    LOS B         4.5      31.2      0.92     0.73      0.94      49.3
 Approach                   753 0.0      753 0.0      0.477    10.2    LOS B         4.5      31.2      0.90     0.73      0.91      50.4

 SouthEast: Weyba Road
 21b     L3 All MCs         317 0.0      317 0.0      0.188     3.0    LOS A         0.0       0.0      0.00     0.44      0.00      56.0
 21a     L1 All MCs         481 0.0      481 0.0      0.473     5.1    LOS A         4.1      28.5      0.75     0.60      0.75      52.6
 23a     R1 All MCs         132 0.0      132 0.0      0.473    10.3    LOS B         4.1      28.5      0.75     0.60      0.75      51.7
 23u      U     All MCs        3 0.0        3 0.0     0.473    14.0    LOS B         4.1      28.5      0.75     0.60      0.75      51.7
 Approach                   933 0.0      933 0.0      0.473     5.2    LOS A         4.1      28.5      0.50     0.54      0.50      53.6

 North: Weyba Road
 7a      L1 All MCs          98 0.0       98 0.0      0.201    11.2    LOS B         1.2       8.5      0.82     0.75      0.82      51.8
 8       T1 All MCs         221 0.0      221 0.0      0.477     9.8    LOS A         4.2      29.3      0.94     0.82      1.05      50.0
 9       R2 All MCs         118 0.0      118 0.0      0.477    16.0    LOS B         4.2      29.3      0.94     0.82      1.05      49.2
 9u       U     All MCs        6 0.0        6 0.0     0.477    18.4    LOS B         4.2      29.3      0.94     0.82      1.05      49.2
 Approach                   443 0.0      443 0.0      0.477    11.9    LOS B         4.2      29.3      0.92     0.80      1.00      50.2

 West: Mary Street
 10      L2 All MCs         153 0.0      153 0.0      0.185     6.8    LOS A         1.2       8.7      0.74     0.65      0.74      52.9
 12a     R1 All MCs         521 0.0      521 0.0      0.576    12.4    LOS B         6.2      43.6      0.91     0.77      1.01      48.7
 12      R2 All MCs         114 0.0      114 0.0      0.576    13.7    LOS B         6.2      43.6      0.91     0.77      1.01      48.7
 12u      U     All MCs      20 0.0       20 0.0      0.576    16.2    LOS B         6.2      43.6      0.91     0.77      1.01      48.7
 Approach                   807 0.0      807 0.0      0.576    11.6    LOS B         6.2      43.6      0.88     0.75      0.96      49.4

 All Vehicles              2936 0.0 2936 0.0          0.576     9.2    LOS A         6.2      43.6      0.77     0.68      0.81      51.0

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 15 July 2025 3:40:16 PM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 58

MOVEMENT SUMMARY
  Site: 101 [Weyba Road_Mary Street - Base 2025 AM Peak
(Weekday) (Site Folder: Site 4)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov             Demand         Arrival   Deg.    Aver. Level of         95% Back Of       Prop.      Eff.    Aver.     Aver.
 ID          Class              Flows        Flows    Satn    Delay Service             Queue           Que      Stop    No. of    Speed
                          [ Total HV ] [ Total HV ]                                [ Veh.   Dist ]               Rate    Cycles
                           veh/h % veh/h %              v/c     sec                  veh      m                                     km/h
 South: Reed Street
 1       L2 All MCs         269 0.0      269 0.0      0.373     8.6    LOS A         2.8      19.8      0.88     0.73      0.88      51.8
 2       T1 All MCs         253 0.0      253 0.0      0.512     8.3    LOS A         5.2      36.4      0.96     0.77      1.04      49.7
 3b      R3 All MCs         253 0.0      253 0.0      0.512    15.7    LOS B         5.2      36.4      0.96     0.77      1.04      48.9
 3u       U     All MCs        4 0.0        4 0.0     0.512    16.9    LOS B         5.2      36.4      0.96     0.77      1.04      48.9
 Approach                   779 0.0      779 0.0      0.512    10.9    LOS B         5.2      36.4      0.93     0.75      0.98      50.1

 SouthEast: Weyba Road
 21b     L3 All MCs         328 0.0      328 0.0      0.195     3.0    LOS A         0.0       0.0      0.00     0.44      0.00      56.0
 21a     L1 All MCs         499 0.0      499 0.0      0.499     5.2    LOS A         4.4      30.9      0.78     0.61      0.78      52.5
 23a     R1 All MCs         137 0.0      137 0.0      0.499    10.5    LOS B         4.4      30.9      0.78     0.61      0.78      51.6
 23u      U     All MCs        3 0.0        3 0.0     0.499    14.2    LOS B         4.4      30.9      0.78     0.61      0.78      51.6
 Approach                   967 0.0      967 0.0      0.499     5.3    LOS A         4.4      30.9      0.52     0.55      0.52      53.5

 North: Weyba Road
 7a      L1 All MCs         101 0.0      101 0.0      0.218    11.8    LOS B         1.3       9.4      0.85     0.77      0.85      51.4
 8       T1 All MCs         229 0.0      229 0.0      0.521    11.3    LOS B         4.9      34.6      0.98     0.86      1.15      49.1
 9       R2 All MCs         122 0.0      122 0.0      0.521    17.4    LOS B         4.9      34.6      0.98     0.86      1.15      48.4
 9u       U     All MCs        6 0.0        6 0.0     0.521    19.9    LOS B         4.9      34.6      0.98     0.86      1.15      48.4
 Approach                   459 0.0      459 0.0      0.521    13.1    LOS B         4.9      34.6      0.95     0.84      1.09      49.4

 West: Mary Street
 10      L2 All MCs         158 0.0      158 0.0      0.196     6.9    LOS A         1.4       9.5      0.77     0.66      0.77      52.9
 12a     R1 All MCs         540 0.0      540 0.0      0.614    13.3    LOS B         7.2      50.5      0.95     0.80       1.11     48.3
 12      R2 All MCs         118 0.0      118 0.0      0.614    14.5    LOS B         7.2      50.5      0.95     0.80       1.11     48.3
 12u      U     All MCs      21 0.0       21 0.0      0.614    17.0    LOS B         7.2      50.5      0.95     0.80       1.11     48.3
 Approach                   837 0.0      837 0.0      0.614    12.4    LOS B         7.2      50.5      0.91     0.78      1.04      49.1

 All Vehicles              3042 0.0 3042 0.0          0.614     9.8    LOS A         7.2      50.5      0.80     0.71      0.87      50.7

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 15 July 2025 3:40:17 PM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 59

MOVEMENT SUMMARY
  Site: 101 [Weyba Road_Mary Street - Base+dev OP 2025 AM
Peak (Weekday) (Site Folder: Site 4)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov             Demand         Arrival   Deg.    Aver. Level of         95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class              Flows        Flows    Satn    Delay Service             Queue           Que      Stop    No. of   Speed
                          [ Total HV ] [ Total HV ]                                [ Veh.   Dist ]               Rate    Cycles
                           veh/h % veh/h %              v/c     sec                  veh      m                                     km/h
 South: Reed Street
 1       L2 All MCs         269 0.0      269 0.0      0.373     8.6    LOS A         2.8      19.8      0.88     0.73      0.88      51.8
 2       T1 All MCs         253 0.0      253 0.0      0.522     8.5    LOS A         5.4      37.9      0.96     0.77      1.05      49.6
 3b      R3 All MCs         263 0.0      263 0.0      0.522    15.9    LOS B         5.4      37.9      0.96     0.77      1.05      48.8
 3u       U     All MCs        4 0.0        4 0.0     0.522    17.1    LOS B         5.4      37.9      0.96     0.77      1.05      48.8
 Approach                   789 0.0      789 0.0      0.522    11.0    LOS B         5.4      37.9      0.93     0.76      1.00      50.0

 SouthEast: Weyba Road
 21b     L3 All MCs         339 0.0      339 0.0      0.201     3.0    LOS A         0.0       0.0      0.00     0.44      0.00      56.0
 21a     L1 All MCs         499 0.0      499 0.0      0.500     5.2    LOS A         4.4      31.0      0.78     0.61      0.78      52.5
 23a     R1 All MCs         137 0.0      137 0.0      0.500    10.5    LOS B         4.4      31.0      0.78     0.61      0.78      51.6
 23u      U     All MCs        3 0.0        3 0.0     0.500    14.2    LOS B         4.4      31.0      0.78     0.61      0.78      51.6
 Approach                   978 0.0      978 0.0      0.500     5.2    LOS A         4.4      31.0      0.51     0.55      0.51      53.5

 North: Weyba Road
 7a      L1 All MCs         101 0.0      101 0.0      0.221    12.0    LOS B         1.4       9.6      0.85     0.77      0.85      51.3
 8       T1 All MCs         229 0.0      229 0.0      0.528    11.6    LOS B         5.1      35.5      0.99     0.87      1.18      48.9
 9       R2 All MCs         122 0.0      122 0.0      0.528    17.7    LOS B         5.1      35.5      0.99     0.87      1.18      48.1
 9u       U     All MCs        6 0.0        6 0.0     0.528    20.2    LOS C         5.1      35.5      0.99     0.87      1.18      48.1
 Approach                   459 0.0      459 0.0      0.528    13.5    LOS B         5.1      35.5      0.96     0.85      1.10      49.2

 West: Mary Street
 10      L2 All MCs         158 0.0      158 0.0      0.198     7.0    LOS A         1.4       9.6      0.77     0.67      0.77      52.8
 12a     R1 All MCs         540 0.0      540 0.0      0.621    13.6    LOS B         7.4      52.1      0.96     0.81      1.13      48.2
 12      R2 All MCs         118 0.0      118 0.0      0.621    14.8    LOS B         7.4      52.1      0.96     0.81      1.13      48.2
 12u      U     All MCs      21 0.0       21 0.0      0.621    17.3    LOS B         7.4      52.1      0.96     0.81      1.13      48.2
 Approach                   837 0.0      837 0.0      0.621    12.6    LOS B         7.4      52.1      0.92     0.79      1.06      49.0

 All Vehicles              3063 0.0 3063 0.0          0.621    10.0    LOS A         7.4      52.1      0.80     0.71      0.88      50.6

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Wednesday, 16 July 2025 1:04:51 PM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 60

MOVEMENT SUMMARY
  Site: 101 [Weyba Road_Mary Street - Exiting 2022 PM Peak
(Weekday) (Site Folder: Site 4)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov             Demand         Arrival   Deg.    Aver. Level of         95% Back Of       Prop.      Eff.    Aver.     Aver.
 ID          Class              Flows        Flows    Satn    Delay Service             Queue           Que      Stop    No. of    Speed
                          [ Total HV ] [ Total HV ]                                [ Veh.   Dist ]               Rate    Cycles
                           veh/h % veh/h %              v/c     sec                  veh      m                                     km/h
 South: Reed Street
 1       L2 All MCs         297 0.0      297 0.0      0.419     9.0    LOS A         3.3      23.4      0.91     0.76      0.93      51.4
 2       T1 All MCs         266 0.0      266 0.0      0.549     9.1    LOS A         6.0      42.0      0.98     0.80       1.11     49.4
 3b      R3 All MCs         268 0.0      268 0.0      0.549    16.5    LOS B         6.0      42.0      0.98     0.80       1.11     48.6
 3u       U     All MCs        2 0.0        2 0.0     0.549    17.7    LOS B         6.0      42.0      0.98     0.80       1.11     48.6
 Approach                   834 0.0      834 0.0      0.549    11.5    LOS B         6.0      42.0      0.96     0.78      1.05      49.8

 SouthEast: Weyba Road
 21b     L3 All MCs         347 0.0      347 0.0      0.206     3.1    LOS A         0.0       0.0      0.00     0.44      0.00      56.0
 21a     L1 All MCs         491 0.0      491 0.0      0.526     6.6    LOS A         5.1      35.8      0.88     0.71      0.93      52.1
 23a     R1 All MCs         107 0.0      107 0.0      0.526    11.8    LOS B         5.1      35.8      0.88     0.71      0.93      51.2
 23u      U     All MCs        4 0.0        4 0.0     0.526    15.6    LOS B         5.1      35.8      0.88     0.71      0.93      51.2
 Approach                   949 0.0      949 0.0      0.526     5.9    LOS A         5.1      35.8      0.56     0.61      0.59      53.3

 North: Weyba Road
 7a      L1 All MCs          99 0.0       99 0.0      0.237    12.6    LOS B         1.5      10.4      0.87     0.79      0.87      50.8
 8       T1 All MCs         245 0.0      245 0.0      0.648    16.1    LOS B         7.5      52.5      1.00     1.00      1.40      46.1
 9       R2 All MCs         158 0.0      158 0.0      0.648    22.2    LOS C         7.5      52.5      1.00     1.00      1.40      45.4
 9u       U     All MCs        9 0.0        9 0.0     0.648    24.7    LOS C         7.5      52.5      1.00     1.00      1.40      45.4
 Approach                   512 0.0      512 0.0      0.648    17.5    LOS B         7.5      52.5      0.98     0.96      1.30      46.7

 West: Mary Street
 10      L2 All MCs         206 0.0      206 0.0      0.259     7.1    LOS A         1.9      13.1      0.80     0.68      0.80      52.7
 12a     R1 All MCs         487 0.0      487 0.0      0.656    14.1    LOS B         8.4      59.0      0.98     0.84      1.19      47.8
 12      R2 All MCs         201 0.0      201 0.0      0.656    15.4    LOS B         8.4      59.0      0.98     0.84      1.19      47.8
 12u      U     All MCs      26 0.0       26 0.0      0.656    17.8    LOS B         8.4      59.0      0.98     0.84      1.19      47.8
 Approach                   921 0.0      921 0.0      0.656    12.9    LOS B         8.4      59.0      0.94     0.80       1.11     48.8

 All Vehicles              3216 0.0 3216 0.0          0.656    11.2    LOS B         8.4      59.0      0.84     0.77      0.97      49.9

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 15 July 2025 3:40:18 PM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 61

MOVEMENT SUMMARY
  Site: 101 [Weyba Road_Mary Street - Base 2025 PM Peak
(Weekday) (Site Folder: Site 4)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov             Demand         Arrival   Deg.    Aver. Level of         95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class              Flows        Flows    Satn    Delay Service             Queue           Que      Stop    No. of   Speed
                          [ Total HV ] [ Total HV ]                                [ Veh.   Dist ]               Rate    Cycles
                           veh/h % veh/h %              v/c     sec                  veh      m                                     km/h
 South: Reed Street
 1       L2 All MCs         307 0.0      307 0.0      0.453    10.0    LOS B         3.8      26.9      0.94     0.79      1.01      50.7
 2       T1 All MCs         276 0.0      276 0.0      0.591    10.4    LOS B         7.0      49.3      1.00     0.85      1.21      48.8
 3b      R3 All MCs         278 0.0      278 0.0      0.591    17.8    LOS B         7.0      49.3      1.00     0.85      1.21      48.1
 3u       U     All MCs        2 0.0        2 0.0     0.591    19.0    LOS B         7.0      49.3      1.00     0.85      1.21      48.1
 Approach                   863 0.0      863 0.0      0.591    12.7    LOS B         7.0      49.3      0.98     0.83      1.14      49.2

 SouthEast: Weyba Road
 21b     L3 All MCs         255 0.0      255 0.0      0.151     3.0    LOS A         0.0       0.0      0.00     0.44      0.00      56.0
 21a     L1 All MCs         508 0.0      508 0.0      0.556     7.3    LOS A         5.8      40.6      0.91     0.74      1.00      51.9
 23a     R1 All MCs         112 0.0      112 0.0      0.556    12.5    LOS B         5.8      40.6      0.91     0.74      1.00      51.0
 23u      U     All MCs        4 0.0        4 0.0     0.556    16.2    LOS B         5.8      40.6      0.91     0.74      1.00      51.0
 Approach                   879 0.0      879 0.0      0.556     6.7    LOS A         5.8      40.6      0.64     0.65      0.71      52.9

 North: Weyba Road
 7a      L1 All MCs         102 0.0      102 0.0      0.259    13.4    LOS B         1.6       11.5     0.89     0.81      0.89      50.3
 8       T1 All MCs         254 0.0      254 0.0      0.710    20.2    LOS C         9.1      63.9      1.00     1.10      1.55      43.9
 9       R2 All MCs         163 0.0      163 0.0      0.710    26.3    LOS C         9.1      63.9      1.00     1.10      1.55      43.3
 9u       U     All MCs        9 0.0        9 0.0     0.710    28.8    LOS C         9.1      63.9      1.00     1.10      1.55      43.3
 Approach                   528 0.0      528 0.0      0.710    20.9    LOS C         9.1      63.9      0.98     1.04      1.43      44.8

 West: Mary Street
 10      L2 All MCs         214 0.0      214 0.0      0.276     7.3    LOS A         2.0      14.2      0.82     0.69      0.82      52.6
 12a     R1 All MCs         505 0.0      505 0.0      0.700    15.5    LOS B         9.9      69.4      1.00     0.90      1.29      47.0
 12      R2 All MCs         208 0.0      208 0.0      0.700    16.8    LOS B         9.9      69.4      1.00     0.90      1.29      47.0
 12u      U     All MCs      27 0.0       27 0.0      0.700    19.2    LOS B         9.9      69.4      1.00     0.90      1.29      47.0
 Approach                   955 0.0      955 0.0      0.700    14.1    LOS B         9.9      69.4      0.96     0.86      1.19      48.1

 All Vehicles              3225 0.0 3225 0.0          0.710    12.8    LOS B         9.9      69.4      0.88     0.82      1.08      49.0

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 15 July 2025 3:40:18 PM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 62

MOVEMENT SUMMARY
  Site: 101 [Weyba Road_Mary Street - Base+dev OP 2025 PM
Peak (Weekday) (Site Folder: Site 4)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov             Demand         Arrival   Deg.    Aver. Level of         95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class              Flows        Flows    Satn    Delay Service             Queue           Que      Stop    No. of   Speed
                          [ Total HV ] [ Total HV ]                                [ Veh.   Dist ]               Rate    Cycles
                           veh/h % veh/h %              v/c     sec                  veh      m                                     km/h
 South: Reed Street
 1       L2 All MCs         307 0.0      307 0.0      0.453    10.0    LOS B         3.8      26.9      0.94     0.79      1.01      50.7
 2       T1 All MCs         276 0.0      276 0.0      0.602    10.7    LOS B         7.3      51.3      1.00     0.87      1.22      48.6
 3b      R3 All MCs         288 0.0      288 0.0      0.602    18.1    LOS B         7.3      51.3      1.00     0.87      1.22      47.9
 3u       U     All MCs        2 0.0        2 0.0     0.602    19.3    LOS B         7.3      51.3      1.00     0.87      1.22      47.9
 Approach                   874 0.0      874 0.0      0.602    12.9    LOS B         7.3      51.3      0.98     0.84      1.15      49.1

 SouthEast: Weyba Road
 21b     L3 All MCs         371 0.0      371 0.0      0.220     3.1    LOS A         0.0       0.0      0.00     0.44      0.00      56.0
 21a     L1 All MCs         508 0.0      508 0.0      0.556     7.3    LOS A         5.8      40.6      0.91     0.74      1.00      51.9
 23a     R1 All MCs         112 0.0      112 0.0      0.556    12.5    LOS B         5.8      40.6      0.91     0.74      1.00      51.0
 23u      U     All MCs        4 0.0        4 0.0     0.556    16.2    LOS B         5.8      40.6      0.91     0.74      1.00      51.0
 Approach                   995 0.0      995 0.0      0.556     6.3    LOS A         5.8      40.6      0.57     0.63      0.63      53.2

 North: Weyba Road
 7a      L1 All MCs         102 0.0      102 0.0      0.261    13.6    LOS B         1.7       11.6     0.90     0.81      0.90      50.2
 8       T1 All MCs         254 0.0      254 0.0      0.718    21.1    LOS C         9.4      65.7      1.00     1.12      1.58      43.5
 9       R2 All MCs         163 0.0      163 0.0      0.718    27.2    LOS C         9.4      65.7      1.00     1.12      1.58      42.9
 9u       U     All MCs        9 0.0        9 0.0     0.718    29.7    LOS C         9.4      65.7      1.00     1.12      1.58      42.9
 Approach                   528 0.0      528 0.0      0.718    21.7    LOS C         9.4      65.7      0.98     1.06      1.45      44.4

 West: Mary Street
 10      L2 All MCs         214 0.0      214 0.0      0.279     7.4    LOS A         2.1      14.4      0.83     0.69      0.83      52.6
 12a     R1 All MCs         505 0.0      505 0.0      0.709    15.9    LOS B        10.2      71.7      1.00     0.92      1.32      46.7
 12      R2 All MCs         208 0.0      208 0.0      0.709    17.2    LOS B        10.2      71.7      1.00     0.92      1.32      46.7
 12u      U     All MCs      27 0.0       27 0.0      0.709    19.7    LOS B        10.2      71.7      1.00     0.92      1.32      46.7
 Approach                   955 0.0      955 0.0      0.709    14.4    LOS B        10.2      71.7      0.96     0.87      1.21      47.9

 All Vehicles              3352 0.0 3352 0.0          0.718    12.8    LOS B        10.2      71.7      0.85     0.82      1.06      49.0

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Wednesday, 16 July 2025 1:04:51 PM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 63

MOVEMENT SUMMARY
  Site: 101 [Weyba Road_Mary Street - Exiting 2022 PM Peak
(Weekend) (Site Folder: Site 4)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov             Demand         Arrival   Deg.    Aver. Level of         95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class              Flows        Flows    Satn    Delay Service             Queue           Que      Stop    No. of   Speed
                          [ Total HV ] [ Total HV ]                                [ Veh.   Dist ]               Rate    Cycles
                           veh/h % veh/h %              v/c     sec                  veh      m                                     km/h
 South: Reed Street
 1       L2 All MCs         207 0.0      207 0.0      0.255     7.4    LOS A         1.8      12.4      0.78     0.68      0.78      52.6
 2       T1 All MCs         286 0.0      286 0.0      0.512     7.4    LOS A         4.9      34.4      0.89     0.74      0.94      50.1
 3b      R3 All MCs         278 0.0      278 0.0      0.512    14.8    LOS B         4.9      34.4      0.89     0.74      0.94      49.4
 3u       U     All MCs        3 0.0        3 0.0     0.512    16.0    LOS B         4.9      34.4      0.89     0.74      0.94      49.4
 Approach                   775 0.0      775 0.0      0.512    10.1    LOS B         4.9      34.4      0.86     0.72      0.90      50.5

 SouthEast: Weyba Road
 21b     L3 All MCs         275 0.0      275 0.0      0.163     3.0    LOS A         0.0       0.0      0.00     0.44      0.00      56.0
 21a     L1 All MCs         421 0.0      421 0.0      0.414     4.9    LOS A         3.4      23.5      0.71     0.58      0.71      52.8
 23a     R1 All MCs         126 0.0      126 0.0      0.414    10.2    LOS B         3.4      23.5      0.71     0.58      0.71      51.9
 23u      U     All MCs        1 0.0        1 0.0     0.414    13.9    LOS B         3.4      23.5      0.71     0.58      0.71      51.9
 Approach                   823 0.0      823 0.0      0.414     5.1    LOS A         3.4      23.5      0.47     0.53      0.47      53.7

 North: Weyba Road
 7a      L1 All MCs         132 0.0      132 0.0      0.240    10.5    LOS B         1.5      10.5      0.83     0.74      0.83      52.2
 8       T1 All MCs         172 0.0      172 0.0      0.421     8.6    LOS A         3.4      23.6      0.91     0.77      0.94      50.2
 9       R2 All MCs         139 0.0      139 0.0      0.421    14.7    LOS B         3.4      23.6      0.91     0.77      0.94      49.4
 9u       U     All MCs        4 0.0        4 0.0     0.421    17.2    LOS B         3.4      23.6      0.91     0.77      0.94      49.4
 Approach                   446 0.0      446 0.0      0.421    11.1    LOS B         3.4      23.6      0.89     0.76      0.91      50.5

 West: Mary Street
 10      L2 All MCs         189 0.0      189 0.0      0.243     7.4    LOS A         1.7      12.1      0.80     0.68      0.80      52.7
 12a     R1 All MCs         445 0.0      445 0.0      0.566    13.0    LOS B         6.2      43.3      0.95     0.78      1.06      48.5
 12      R2 All MCs         146 0.0      146 0.0      0.566    14.3    LOS B         6.2      43.3      0.95     0.78      1.06      48.5
 12u      U     All MCs      11 0.0        11 0.0     0.566    16.7    LOS B         6.2      43.3      0.95     0.78      1.06      48.5
 Approach                   792 0.0      792 0.0      0.566    11.9    LOS B         6.2      43.3      0.91     0.76      1.00      49.4

 All Vehicles              2836 0.0 2836 0.0          0.566     9.3    LOS A         6.2      43.3      0.77     0.68      0.80      51.0

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 15 July 2025 3:40:19 PM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 64

MOVEMENT SUMMARY
  Site: 101 [Weyba Road_Mary Street - Base 2025 PM Peak
(Weekend) (Site Folder: Site 4)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov             Demand         Arrival   Deg.    Aver. Level of         95% Back Of       Prop.      Eff.    Aver.    Aver.
 ID          Class              Flows        Flows    Satn    Delay Service             Queue           Que      Stop    No. of   Speed
                          [ Total HV ] [ Total HV ]                                [ Veh.   Dist ]               Rate    Cycles
                           veh/h % veh/h %              v/c     sec                  veh      m                                     km/h
 South: Reed Street
 1       L2 All MCs         215 0.0      215 0.0      0.272     7.7    LOS A         1.9      13.5      0.81     0.69      0.81      52.4
 2       T1 All MCs         297 0.0      297 0.0      0.546     8.2    LOS A         5.7      39.9      0.93     0.77      1.03      49.8
 3b      R3 All MCs         288 0.0      288 0.0      0.546    15.6    LOS B         5.7      39.9      0.93     0.77      1.03      49.0
 3u       U     All MCs        3 0.0        3 0.0     0.546    16.8    LOS B         5.7      39.9      0.93     0.77      1.03      49.0
 Approach                   803 0.0      803 0.0      0.546    10.7    LOS B         5.7      39.9      0.89     0.75      0.97      50.2

 SouthEast: Weyba Road
 21b     L3 All MCs         285 0.0      285 0.0      0.169     3.0    LOS A         0.0       0.0      0.00     0.44      0.00      56.0
 21a     L1 All MCs         437 0.0      437 0.0      0.436     5.0    LOS A         3.6      25.4      0.73     0.59      0.73      52.7
 23a     R1 All MCs         131 0.0      131 0.0      0.436    10.3    LOS B         3.6      25.4      0.73     0.59      0.73      51.8
 23u      U     All MCs        1 0.0        1 0.0     0.436    14.0    LOS B         3.6      25.4      0.73     0.59      0.73      51.8
 Approach                   854 0.0      854 0.0      0.436     5.2    LOS A         3.6      25.4      0.49     0.54      0.49      53.6

 North: Weyba Road
 7a      L1 All MCs         137 0.0      137 0.0      0.262    11.1    LOS B         1.7       11.8     0.85     0.76      0.85      51.9
 8       T1 All MCs         178 0.0      178 0.0      0.458     9.6    LOS A         3.9      27.6      0.94     0.81      1.03      49.8
 9       R2 All MCs         144 0.0      144 0.0      0.458    15.7    LOS B         3.9      27.6      0.94     0.81      1.03      49.0
 9u       U     All MCs        4 0.0        4 0.0     0.458    18.2    LOS B         3.9      27.6      0.94     0.81      1.03      49.0
 Approach                   463 0.0      463 0.0      0.458    12.0    LOS B         3.9      27.6      0.92     0.79      0.98      50.1

 West: Mary Street
 10      L2 All MCs         197 0.0      197 0.0      0.261     7.6    LOS A         1.9      13.3      0.83     0.70      0.83      52.5
 12a     R1 All MCs         461 0.0      461 0.0      0.606    14.1    LOS B         7.2      50.5      0.98     0.82      1.16      47.9
 12      R2 All MCs         152 0.0      152 0.0      0.606    15.3    LOS B         7.2      50.5      0.98     0.82      1.16      47.9
 12u      U     All MCs      11 0.0        11 0.0     0.606    17.8    LOS B         7.2      50.5      0.98     0.82      1.16      47.9
 Approach                   820 0.0      820 0.0      0.606    12.8    LOS B         7.2      50.5      0.95     0.79      1.08      48.9

 All Vehicles              2940 0.0 2940 0.0          0.606     9.9    LOS A         7.2      50.5      0.79     0.71      0.86      50.7

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 15 July 2025 3:40:19 PM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Page 65

MOVEMENT SUMMARY
  Site: 101 [Weyba Road_Mary Street - Base+dev OP 2025 PM
Peak (Weekend) (Site Folder: Site 4)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov    Turn Mov             Demand         Arrival   Deg.    Aver. Level of         95% Back Of       Prop.      Eff.    Aver.     Aver.
 ID          Class              Flows        Flows    Satn    Delay Service             Queue           Que      Stop    No. of    Speed
                          [ Total HV ] [ Total HV ]                                [ Veh.   Dist ]               Rate    Cycles
                           veh/h % veh/h %              v/c     sec                  veh      m                                     km/h
 South: Reed Street
 1       L2 All MCs         215 0.0      215 0.0      0.272     7.7    LOS A         1.9      13.5      0.81     0.69      0.81      52.4
 2       T1 All MCs         297 0.0      297 0.0      0.556     8.4    LOS A         5.9      41.4      0.93     0.78      1.05      49.7
 3b      R3 All MCs         299 0.0      299 0.0      0.556    15.7    LOS B         5.9      41.4      0.93     0.78      1.05      48.9
 3u       U     All MCs        3 0.0        3 0.0     0.556    17.0    LOS B         5.9      41.4      0.93     0.78      1.05      48.9
 Approach                   814 0.0      814 0.0      0.556    10.9    LOS B         5.9      41.4      0.90     0.76      0.99      50.1

 SouthEast: Weyba Road
 21b     L3 All MCs         296 0.0      296 0.0      0.176     3.0    LOS A         0.0       0.0      0.00     0.44      0.00      56.0
 21a     L1 All MCs         437 0.0      437 0.0      0.437     5.0    LOS A         3.6      25.5      0.73     0.59      0.73      52.7
 23a     R1 All MCs         131 0.0      131 0.0      0.437    10.3    LOS B         3.6      25.5      0.73     0.59      0.73      51.8
 23u      U     All MCs        1 0.0        1 0.0     0.437    14.0    LOS B         3.6      25.5      0.73     0.59      0.73      51.8
 Approach                   864 0.0      864 0.0      0.437     5.2    LOS A         3.6      25.5      0.48     0.54      0.48      53.6

 North: Weyba Road
 7a      L1 All MCs         137 0.0      137 0.0      0.265    11.3    LOS B         1.7      12.0      0.86     0.76      0.86      51.8
 8       T1 All MCs         178 0.0      178 0.0      0.464     9.9    LOS A         4.0      28.3      0.95     0.81      1.05      49.6
 9       R2 All MCs         144 0.0      144 0.0      0.464    16.0    LOS B         4.0      28.3      0.95     0.81      1.05      48.9
 9u       U     All MCs        4 0.0        4 0.0     0.464    18.5    LOS B         4.0      28.3      0.95     0.81      1.05      48.9
 Approach                   463 0.0      463 0.0      0.464    12.3    LOS B         4.0      28.3      0.92     0.80      0.99      50.0

 West: Mary Street
 10      L2 All MCs         197 0.0      197 0.0      0.264     7.7    LOS A         1.9      13.6      0.84     0.70      0.84      52.4
 12a     R1 All MCs         461 0.0      461 0.0      0.614    14.4    LOS B         7.4      52.1      1.00     0.83      1.19      47.7
 12      R2 All MCs         152 0.0      152 0.0      0.614    15.6    LOS B         7.4      52.1      1.00     0.83      1.19      47.7
 12u      U     All MCs      11 0.0        11 0.0     0.614    18.1    LOS B         7.4      52.1      1.00     0.83      1.19      47.7
 Approach                   820 0.0      820 0.0      0.614    13.1    LOS B         7.4      52.1      0.96     0.80       1.11     48.7

 All Vehicles              2961 0.0 2961 0.0          0.614    10.0    LOS B         7.4      52.1      0.80     0.71      0.87      50.6

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Wednesday, 16 July 2025 1:04:50 PM
Project: C:\Users\Ashley.Schalken\OneDrive - Colliers International\2022 Synergy Projects - 22BRT0122 3 – 7 Serenity Close, Noosa Heads –
Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122_02_OPW.sip9

Used in these records

About this file

File size
2.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Further Advice Response 17-07-25 22BRT0122_LT01_3.pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.