Skip to the record
Beware of cheap imitations.

Original source · versioned page text

08/0273 - Operational Works - Transport Type 5 - Jetty [As Published]

of 17

Page text read automatically using OCR, there may be inaccuracies

Vr}
L

  

 

 
 

Checklist - Applications Involving Land
.. Development & Land Use Sections

IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at tae counter.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

41. APPLICATION FORMS
1.1. Form1PartA
1.1.1 Ensure that the form is fully completed. MH
1.1.2 Inthe case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 if there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
4.2. Form1 Part B-O Supporting Information
4.4.2. Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [7]
1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. (7
2. REFERRAL INFORMATION oo
2.4. Ensure that items 1-23 have been checked and/or completed with regard to referrals. 7
3. ° ENVIRONMENTALLY RELEVANT ACTIVITIES - me
3.1 Ensure that Part G is completed if EPA referral is required.
3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
4. FORM 2- REQUEST TO CHANGE APPROVAL . - .
4.1. Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
5. ~ PLANS - 7 ae . : * .
5.4 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational! +4
Works) accompanies the application. In addition ensure that each set is complete.
5.2 fnsure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is ~
inbound.
6. "SUPPORTING INFORMATION ee wT wows
6.1. Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is ~
capable of reproduction.
6.2 Inthe case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
7. FEE coe vee rt me ron
7.4. Ensure that the application fee, as determined from the Council’s adopted scale of fees,
accompanies the application or has been paid. Z
7.2. Ensure that the fee which has been paid is recorded on the application form. |
| eceiving Officer fs wane ee eT cece tere eee e nen enee Date _L8lt lo & eoeaceeeeeeee

| Having completed this form and accepte

trays:-

 
 

Application, please deliver both to the following IDAS Application Receiving

« — Ifthe application is for a Material Change of Use exclusively -AOP1's desk in the Land Use Section.

+ Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.

* Ifthe application is for Orerational Works (for parking, access, sewerage or drainage) exclusively — AOD2 in the
Land Development Secticn.

« In

alt other circumstances — AOP1’s desk in the Land Use Section.

(Please DO fOT leave the application at the counter and DO NOT deliver the application to Records.

SEP! g:AantYorms\application checklist.doc

Log in to download the original (08_0273 - Operational Works - Transport Type 5 - Jetty [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 16 pages

Page 2

   

 

 

 

 

 

 

vy
ED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007
\\ m:1:Development Application.
Common details
identification of the premases the subject of the application |
1. Can any part of the premises be identified by a street address or lot on plan description?
(J No - Answer Qifa)
&] Yes - Complete Table 8 and answer Q1{b) and Qi(c)
Table B
e@ bee abe E US Lotton plan description - a °
Unit | Street Official suburb | Post © | “(plate eactr destrption ira separate row) wes Eee
number | number Street name flocality name | code lot Plan ype Han] Local government area :
q umber fe.g. RP, SP} number
10 The Promontory Noosavitle 4566 845 SP 102579 Noosa Council

 

 

 

 

 

 

 

 

 

 

 

1(b). Can the address be further described by shop/tenancy number or storey/level?

& No

(1 Yes - Complete Table C

1(c). _ Is any part of the premises strategic port land under the Transport Infrastructure Act 19947
No

(1) Yes - Complete Table D

2. Can the premises best be identified by coordinates (e.g. for development proposed in waters, or ona site within a large rural lot)?
No
@ (2) Yes - Complete Table E

3. Are the premises within or adjacent to a water body or watercourse?

[] No

[X] Yes - Complete Table F and answer Q3(a)

Table F

 

~~ Name of water body or watercourse °

 

 

1 Noosa Waters Canal

 

 

 

 

3{a). Is any part of the development proposed in tidal waters {ie. below high water mark)?
I No
(1 Yes

Page 3

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007

4.  Whatis the total area of land that makes up the premises (ie. the area covered by the application)?

 

 

 

 

 

 

 

 

 

 

mail “Area of land above high water mark/outside watercourse " Areainaweterbodyorwatercouse  —~C«CS@YSY
747.00 (Im? [hectares (Tick applicable unit) (Cm = [hectares (Tick applicable unit)
Existing use of the premises 1

 

5. Are the premises currently used for any purpose?

—X] No

(1 Yes - Ensure details of any existing use of the premises are provided in plans and documentation submitted with this application, e.g. location
and nature of existing uses, buildings, structures and services

6. Are there any existing easements on the premises (e.g. for vehicular access, electricity, overland flow)?

{I No

(1 Yes - Complete Table H and ensure the location and dimensions of each easement are included in plans, submitted with the application

 

(Proposal details . }
7. Are new uses proposed on the premises? .

(I No

OX] Yes - Provide details in Table !

Tablet

 

 

‘Each proposed new use i

 

1 New Timber Jetty

 

 

 

 

8. Are new buildings or structures proposed to be erected on the premises?

(J No

DX] Yes - Ensure the nature, location and dimensions of the proposed new buildings, structures or services are included in plans, submitted with the
application

 

Applicant detalls J
9. Whois the applicant for the application?

 

 

Companylorganisation name |i41-c1m & Marilyn Mackenzie C/- Noosa Jetty Builders

 

 

 

 

 

 

 

 

 

 

(if applicable)
individual’ contact person detais oe : 0 . - — |
Postal address [Po Box 299 Noosaville 4566

 

 

 

Contact telephone number lor 5474 3480

 

 

 

Mobile phone number -—-‘{0408 137 526

 

 

 

 

 

 

|
|
|

 

 

 

 

 

Facsimile number [oz 5474 3480
e-mail address [email protected]
{Owner's consent and resource entitlement ]

 

10. Does the application involve a State-owned resource prescribed by schedule 10 of the Integrated Planning Regulation 1998 (IP Reg) or
any other regulation?

[X] No

oO Yes - Complete a new Table J for each State-owned resource and submit, with the application evidence of resource allocation or entitlement

Page 4

a

 

 

 

 

 

 

 

 

 

INTEGRATED PLANNING ACT 1997 Part A, Version 3 0, 3 September 2007
11. Does the application involve land other than State-owned land {i.. privately owned land) and require owner's consent?

(] No

[KX] Yes - Complete Table K and submit, with the application, written documentation of all ovmer's consent
Table K

J “Owner namels : - Steet address or lot on plan description Date written consent
ss was obtained
1 Malcolm & Marilyn Mackenzie 10 The Promontory Noosaville 4566 05/02/2008

Mandatory attachments and supporting information }

 

12. What are the other parts of IDAS Application Form 1 submitted with this application, and the other mandatory attachments and
supporting information accompanying this application, not identified in those other form parts?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

fen Pate Far Lames seonsat vatene of |} (eg. Gpnaal Auoa name Stuart Date Method of delvery to
resource avocation’eniiiement, plans, drawings, reports) Report) - . assessment manager ;
1 Part E 05-Feb-2008 | over the counter
e 2 Checklist 05-Feb-2008 | over the counter
{3 Owners consent 05-Feb-2008 | over the counter
4 Plans 08/ Feb 2008 over the counter
Portable Long Service Leave (PLSL) levy for bullding and construction work 1

 

13, Is payment of a Portable Long Service Leave (PLSL) levy required for building and construction work before a development permit for
the application can be given?

2] No
CD Yes

13(a). Indicate the reason PLSL is not applicable

[D_ The application is not for building and construction work under the Building and Construction Industry (Portable Long
Service Leave) Act 1991, section 3AA (e.g. the application is only for a change of use or for the following types of work carried
out solely for farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching
vegetation, clearing of regrowth, thinning vegetation or controlling weeds or pests); OF

&_ Allccosts, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or

@ (1) The work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority
Act 1991- Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number
stated). The receipted form must be sighted by the assessment manager before a development permit can be given

 

OFFICE USE ONLY

Date Received Reference Numbers | o8f [2273 |
T

[ FOR COMPLETION BY ASSESSMENT MANAGER ]

 

 

 

 

 

 

Is a QLeave Notification and Payment Form required for this application?

[J No

C1 Yes - Complete Table M

Page 5

PILE-IT Pty Ltd Ree 1 .
Trading as "dt.

Noosa Jetty Builders

LETTER ABN: 55099036736
No: 0001 BSA: 1111115

DATE: 1/02/2008
FROM: Noosa Jetty Builders

PO Box 299 Phone: (07) 5474 3480
Noosaville Fax: (07) 5474 3480
QLD, 4566 Mobile: 0408 137 526

To Whom It May Concern,

I Malcolm & Marilyn Mackenzie, give Pile-It Pty Ltd t/a Noosa Jetty Builders
permission to submit an application for prescribed title works on my behalf.

Address: 10 The Promontory,

 

Noosaville. QLD Post Code: 4566
Phone: (OF) Stk 2022 Mobile: OG29) 4746 Koa

Email: [email protected]

Yours Sincerely,
Molrobrir. Mauctrat

Movie ee

 

RECEIVED

43 FEB 2008

HOOSA SHIRE COUNCIL
FRONT COUNTER

 

 

 

Page 6

INTEGRATED PLANNING ACT 1997

Part E, Version 3.0, 3 September 2007

    
 

aon 1 De ene Application

Part E

Building &or operational works assessable against a planning scheme

 
 

 

 

Nature of the works : - — _ 4
1. Is the application seeking approval of building work assessable against the local government planning scheme?

KI No

LJ Yes

2. ts the application seeking approval of operational work assessable against a planning scheme?
e C) No
J Yes
2(a)_ |s the application seeking approval for more that one type of operational work?
[K] No - Compiete Table 8
(1 Yes - Complete a new Table B for each type of operational work

 

 

 

 

 

Table B

(i) What is the nature of the operational work?
[1] Roadworks (] Stormwater [_] Water infrastructure [] Sewerage infrastructure
L] Landscaping ([] Clearing vegetation under the planning scheme (J Earthworks
(DD Drainage Works LX] Other - Specify below
New Timber Jetty

(ii) Is the application for operational work involving the creation of new lots?
EX] No

@ (1 Yes - Specify number below

 

(iii) What type of approval is being sought?
(D Preliminary approval
[XJ Development Permit

(iv) {s there a current Preliminary Approval for this operational work on the premises?
—K} No
(] Yes - Complete Table B(a}

(v) Are the works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development?
Dx] No

L] Yes - Complete Table B(b)

 

 

 

 

Mandatory Information . ]

3. Confirm that the following mandatory information accompanies this application

 

Confirmation of 1 otha of ladgement}

lodgement

Plans showing the nature and location of the proposed works (including the extent of any cut and fil Confirmed over the counter

 

 

 

 

 

 

Page 7

INTEGRATED PLANNING ACT 1997

Part E, Version 30, 3 September 2007

 

OFFICE USE ONLY

 

Date Received

 

 

 

Reference Numbers

 

r

Page 8

INTEGRATED PLANNING ACT 1997

Advice for completing Part E

Part E, Version 3 0, 3 September 2007

 

General advice

- Part Amust also be completed for all IDAS development applications.
. All questions must be answered unless, following a response, there is a statement to go directly to a particular question.

 

(Q1&2 A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise
development to occur.

 

 

 

 

Proposal iD

 

 

 

 

 

 

 

 

Click here to submit your DA

 

 

Page 9

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

   
   

N _ Form 1 Development Application

: IDAS

Assessment Checklist

 

boas Development Application Form 1 is the approved form for all development applications under the Integrated Planning Act

1997. Form 1 is made up of various Parts. Part A (Common details) of Form 1 must be completed for all applications.
relevance of other Parts of Form 1 depends on the nature of the application.

requirements, and the Parts of Form 1 relevant to the application.

IDAS Application Form.

Form 1 also includes the IDAS Assessment Checklist, which is used to assist in determining State assessment and referral

Section 1 and ail other relevant sections of the IDAS Assessment Checklist must be completed for all development applications
except those for building work requiring assessment against the Building Act 1975 only, For more advice refer to Part B of the

The

 

 

If unsure, phone or visit your local government or log on to the IPA website for help.

Answering the following questions will assist you in determining which sections of the checklist must be completed for your application.

 

Does the application seek approval to materially change use of the premises? Ces
if yes - complete Section 2 of this checklist

EX No

 

Does the application seek approval to reconfigure a lot?
if yes - complete Section 3 of this checklist and Part F of IDAS Application Form 1 yes
Assessment is by the local government

No

 

Does the application seek approval to carry out operational work?
ifyes - complete Section 4 of this checklist & Yes

LINo

 

Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994?
iF yes - complete Section 5 of this checklist

Yes

No

 

Does the application seek approval to carry out building work requiring assessment against a local government planning
scheme?

if yes - complete Part E of IDAS Application Form 1 bes
Assessment is by the local government

[LINo

 

Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of [DAS Application Form 1 Yes
Assessment is by a building certifier

 

 

EJNo

 

 

 

 

-
5 tet OG. uf Section 1 must be completed for ali applications that require completion of the IDAS Assessment Checklist

 

 

HERITAGE

11 \s any part of the proposal intended to be carried out on a registered place under the Queensland Heritage Act 1992?

XX) No
1 Yes
IPA, schedule 8, part 1, table 5, em 2

IP Regulation, scheciule 2, table 2, item 18
IPA, section 1.3 5 (Definitions for terms used in developmeni)

 

(REMGVING QUARRY MATERIAL; WILD RIVER AREA

1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?

J No
LI Yes

Page 10

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkltst, Version 21.0, 3 September 2007
IPA, schedule 8, part 1, table 5. item 1
JP Regulation, schedule 2, table 2. item 11
IP Regulation, schedule 7. table 5, vem 2 (wid river area}
Water Act 2000, section 966C
Wild Rivers Act 2005, section 43A

 

 

“ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVERAREA . . wo : ae ~
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

BX] No

(] Yes

IPA, schedule 8 part 1, tale 2. tem 7

IPA, schedule 8, part 1, table 5, tems 3 and 4

IP Regutation, schedule 2, table 2, tems | and 23

Environmental Protection Act 1994, sectian 73AA (wild river area)
Wild Rivers Act 2005, section 43A

 

 

 

 

WIHINTHELINTS OFAPORT " . 4d
1.4 (s any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?

Bd No

LC] Yes

IP Regulation, schedule 2, table 2, items 15 and 16
IDECLARED FISH HABITAT AREA : |
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?

DJ No

[1 Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA,
schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

IP Regulation, schedule 2, table 2, tem 26
(COMMUNITVINFRASTRUGTURE "jo

1.6 's any part of the premises designated for community infrastructure?

—] No
() Yes

IP Regulation, schedule 2, table 3, tem 7

WASTEWATER MANAGEMENT _ Lr arr ]

 

a

   

 

17 Does the proposal involve the establishment or expansion of a waste water disposal system?

>] No
[1 Yes

JP Regulation, schedtle 2, table 3, item &

 

 

SEC THe 4 Saction 4 must be completed when the application seeks approval to carry out operational work,
PUIANNINGSCHEME |

41 ls any of the proposed operational work assessable under a planning scheme?

[]_ No - Go to Question 4.2 below
EX] Yes - Complete Part E of IDAS Application Form 1 and Questions 4.1.1 - 4.1.8 below

 

 

 

BIATECONTROLEDROAD.. gid
4.1.1 Is any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?
—] No

C] Yes

Page 11

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

If no, is the proposed operational work listed in Integrated Planning Regulation 1998, schedule 5 and does it exceed
the threshold?

{X} No
(11 Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

IP Regulation, schedule 2, table 3, tem 3
IP Requiation, scheduie 2, table 3, tein 1{b}

 

‘ACID SULFATE SOILS J

41.2 Is any of the operational work proposed in a lacal government area listed in State Planning Policy 2/02: Planning and
Managing Development Involving Acid Sulfate Soils?

& No
LD Yes
Saurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cootoola, Douglas,

Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redoliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

ip Regulation, schedule 2, table 3, item 4
State Planning Policy 2/02- Planning and Managing Development involving Acid Sulfate Sotls, section 3.6

 

 

IEASEMENTS AND SUBSTATIONS 7 : ]
4.1.3 Is any of the proposed operational work for filling or excavation?

{Xx} No

CI Yes

IP Regulation, schedule 2, table J item 10(a)
IP Regulation, schedule 2, table 3, item 10(b}

4.1.4 |s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?

BJ No
LC Yes

IP Regulation, schedule 2, table 3, item 17
PUBLIC PASSENGER TRANSPORT |

4.1.5 |s any of the proposed operational work listed in schedule 13C of the iniegrated Planning Regulation 1998 and does it exceed the
specified threshold?

BY No
(21 Yes - This application must be referred to QueenslandTranspont (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, tem 14

 

 

 

RAILWAY SAFETY AND EFFICENCY |
41.6 Is any of the proposed operational work listed in schedule 13D of the Integrated Planning Regulation 1998 and does it exceed the
g!
specified threshold?
kk] No

[1 Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 15

 

 

AKOALA CONSERVATION |
417 Is any part of the premises in a koala conservation area or koala sustainability area?

—] No

C] Yes

IP Regulation, schedule 2. table 3, item 19

Page 12

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

WILD RIVER AREA - Although legislation provides for assessment of operational works for recidential, commercial and industrial

development for the purposes of the Wild Rivers Act 2008, currently no declarations for any of the wild tiver areas apply the Wiid Rivers
ycode to that type of development,

 

 

 

en ere master A SEARCH TET SE A

(ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
"AREA

4.2 Is any of the proposed operational work associated with reconfiguring a lot, if the reconfiguration is also assessable?

No
C] Yes

IPA, schedule 8, part 1, table 4, tem 2

IP Regulation, schedule 1, part 2. table 5 item 1{c)

Wild Rivers code (Note: the code does not currently contain applicable provisions for residential, industrial or commercial development inside a designated urban
alea)

 

 

 

WEGETATION CLEARING: KOALA CONSERVATION; WILD RIVER AREA en |

43 ls any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?

No
C Yes

IPA, schedule 8, part 1, table 4, tems 1A-1G

iP Reguiation, schedule 2, table 2, tem 5 (vegetation clearing)

IP Regulation, schedule 2, table 2, item 34 (koala conservation)

IP Regulation, schedule 1, part 3, table 4, item (vegetaticn clearingAwild river area)
Vegetation Management Act 1999, section 22A (vegetation clearing/wild river area}
Wild Rivers Act 2005, sections 31F and 43A

 

 

 

JTAKING.OR INTERFERING WITH WATER; WILD RIVER AREA , |
44 is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with water from a
watercourse, lake or spring (other than under the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a
watercourse?
KX] No

(1 Yes - This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency

IPA, schedule 8, part 1, lable 4, items Xa)

IP Regulation, schedule 2, table 2, item 8

IP Regulation, schedule 1, part 3, lable 4, tems 3 arc 3A
Water Act 2000, section 966A {wild river area)

Wild Rivers Act 2005, section 43A

45 Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with artesian water?

XX] No
(1) Yes - (Complete Part K,) This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, part 1. table 4, item 3(b}

IP Regulation, schedule 2, table 2, tem 8

IP Requiation, schectule 1, part 3, table 4, tem 3

Wild Rivers code (Note: the cade does not curently contam applicable pravisions for aking ot interfering with artesian water)

46 Is any of the proposed operational work to allow, under the Wafer Act 2000, for taking overland flow water?

EJ No

(11 Yes - Answer (a) and (b) below

IPA, schedule 8. part 1. table 4. item 3(c}ti)

IP Regulation, schedule 2. table 2. item &

iP Regulation, schedule 1, part 3, table 4, tem 3
Water Act 2000, section 966A {wild nver area)
Wild Rivers Act 2008, section 43A

Page 13

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checktst, Version 21.0, 3 September 2007

47 Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?

KK] No
(1 Yes

IPA, schedule 8. part 1, fable 4. tem 3{c}{u)

iP Regulation, schedule 2 table 2 tem 8

IP Regulation. schedule 1, part 3. table 4, item 3

Water Act 2000, section 966A {wild rver area}(Note. no current Wid River declaration identifies taking or interfering with subartesian water as assessable}
Wud River code (Note ihe code does not currently contain appiicable provisions for sub artesian water)

48 Is any of the proposed operational work to allow, under the Water Act 2000, for interfering with overland flow water?

1 No

[J Yes - Answer both (a) and (b) below

IPA, schedile 8, part 1, table 4, dems 3{c}{i) and 3{d}
iP Regulation, schedule 2, table 2, item 9

IP Regulation, schedule 1, part 3, table 4, item 3A
Water Act 2000, section 966B {wild river area}

49 is the proposed operational work for the following?
« For the construction of a referable dam as defined under the Water Act 2000 & No 1 Yes
@ * To increase the storage capacity of a referable dam by more than 10% & No 1 Yes

If yes to either or both - (Complete Part Ks) This application requires assessment by the Department of Natural Resources and Water (NRW).
if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, part 1, table 4, tem 4
IP Regulation, schedule 2, table 2, item 10

 

{TIDAL WORK; WILD RIVER AREA
4.10 1s any of the proposed operational work tidal work, other than excluded work defined under the IPA?
—] No

(11 Yes - Answer (a) and (b) below

JPA, schedule 8, part 1, table 4, item 5

IP Regulation, schedule 2, table 2, items 12, 14 and 17

iP Regulation, schedule 1, part 3, table 4, tems 4A and 5

Coastal Protection and Management Act 1995, section 104A (wild river area)

 

‘COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA . . : i

4.14 Is any of the operational work proposed to be carried out within a coastal management district?

e@ & No

(0 Yes

IPA, schedule 8. part 1. table 4, em 5

IP Regulation, schedule 2, table 2, tems 12 and 14

IP Regulation, schedule 1, part 3, table 4, tems 4A and 5

Coastal Protection and Management Act 1995 Act 1995, section TOMA {wild rivet area}
Wild Rivers Act 2005, section 43A

 

 

WATERWAY BARRIER WORKS; WILD RIVER AREA - - : oe _|
4.12 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?

DX} No

[1 Yes

IPA, schedule 8, part 1, table 4, item 6

IPA, schedule 8, part 2, table 4, item 2

IP Regulation, schedule 2, table 2, tem 28

IP Regulation, schedule 1, part 3, table 4. tem 6
Fisheries Act 1994. section 76D {wild river area}
Wild Rivers Act 2005, section 43A

Page 14

 

L-pz/80__

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Oud ODHNYOM _ + ons a t LNOAW1 ONINWYS
woe oor: $ puso As ‘vio 009%
oer ee: een NV1Id 3LIS asst" 4 Sasso got — He
eessenvg 10 ees DEisornd 20 2d oat + | 3 Pe OMH SZ Xx OS4 | By
on +H tt a a
ee nL com 008 #1. | P—GMHSZX001 |
ame INT g | 8 I th :
rooney oe at thin +
uepion wor J pei 3 Vo
SUaLVM WSOON an tceauosaa ich | ’
AYOLNOWOWd SHL
OL'ON To
Ste LOT rue —8—8- + | 8
ALL3ar GaSOd0ud @) niet AN a i 8
SIZNSOVIN ; | a 3h
anise remo a “ é ——
OBYEPL99 20 a og OM & S¥8 101 & w - 7 5
sugaiing “eet ;
ALLS? YSOON ‘onoad —— aes a
Po sess serone uae moore, i ‘
ALN3d0Ud WWII 38 OL SIN FSI tl 8
TVM IN3FLLSA3Y ONULSDG «= TIVM OL ALIS —F *
5 ma 2N0
mt mq mq | oo! 5
NM NOILVAS1a ZaIs | |
' n eu | |
8 | AYOLNOWOSMGd S3uHL § | 1}
| 7 NOILWAI13 LNOYS
L | 30009 ONMd - 6SbZ SV HLIM
a | | SONVOYOOOV NI OATIVLSNI 38 TIWHS Said Tiv 5 UY
g oneeva 9 CUVZVH O1 GALVSYL ONV
SONY Owioaa MOAB 9 QOOMOGYVH G3SA0uddY 36 TIVHS S3lld TV
LJ | ———- YVIT 39 O1 SS FEF ‘Sad
: ~ OHV >F°0 Ta ULL WOWININ
Oy oad [ OHV 0'+ TY ow yo30 GHv 0°} Ta
LL | TIWM 4O dOL _ TW 30 OL

 

 

 

 

 

 

 

 

Page 15

 

 

Z-bZ/80__

 

Dua OPHAYOM _

 

 

__ pea
rwoe
UY

00e Auvrnias NOLHSY 8

 

 

ZLLLOWVE 20 X84 LOL E099 10 Ud

200% © unvene,

902 9G Od / erueny sURpUDY

JAzMij URED, 9} CNG

aneuOug sByeeg WD / mareONAS

eee
228 €9% O10 NOW q

s9e}e/90Ssy 9
uepJON UYOr fF

W/L CL Ald INTYG WY

 

SY3LVM VSOON
AYOLNOWONd SHL
OL'ON

S¢8 LOT

ALLar GaSOd0ud
SIZNSMOVW W

 

0Br. L190 SOS? DID
SZVLEL GOWO eRqONY OMABICON
OBVEPLIS LO X8act 08z x08 Od

 

 

 

99S/W S'0 - ALIDOTAA ONIHLYA
WG - TASSSA GSYOOW WAWIXVA

 

 

 

bd} 0'% - GVO SAIN NOISAG
WOILYSA XO30 AVM TWM

 

 

 

SSAOOV YVINDIHSA ON
ALVAId ‘YASN STONIS
-3SN ALLS

 

 

 

    

 

 

 

 

 

 

suygaing | \@/NOILOS
ALLBl VSOON IIVL3G olan
“JM OMH 82 * 001 OLN! |
AA AaB) n Nouuad mrvmem uur = fi
<= santivon heap one ony suneoe _/

“SONIMVYO SHL
WOU G3ITVOS 38 LON TIVHS STSA37 ONY SNOISNANIG ‘S

“G39ONTY YO
Q3HSV1s d¥O ATINA GNY G3 TWAS 38 TIWHS S31ld JO dOl ‘v

“T3ALS SSFINIVLS YO G3SSINVATWS CaddiG LOH 38 TIVHS
“OLS 'STIVN 'SM3UOS 'SYSHSVM 'SL108 'SLNN ONIGN TON!
MYOMTAALS YSHLO TH “9F€ SOV SNINVW G3A0dd¥
38 TIVHS "OL3 'SOOY 'SL109 1331S SSFINIVLS TIv ‘€

« SWMYOM TWOIL YO SOUVONVLS

ONSANIONA ONV ONICTING. - ADMOd WNOLLVYsdO
SSAONSOV NOILOSLOUd TWLINSNNOYIANS SHL HLIM AIdNOO
TIVHS NOLLONYLSNOD TI¥ SSIMYSHLO GSLON SSSINN ‘2

‘NIW #14 40 30VUYS SSIYLS V
BAVH ONV S3IDadS QaA0uddY 4O | SSV70 ALITIGVENG
38 TIWHS YSEWIL TV SSIMYSHLO O3S.LON SS3INN “+

‘SALON

 

 

€ STs

OMH Si * 00%

        

MBEAN HOVE O1 S/S LPT
LOVEE TONY 1d O01

QMH $2 051

S/S OLNZ

008

OMH 92 * O51

¢ awiss

 

 

 

 

 

 

GMH $2. 002
i |
b
A | Nz
88 oLrez ers ose z
OM 92 091 —>}
a

3000 ONITd - 6912 SV HUM
AYINOD O1 8370d TW LVHL 3LON
~] BI70d GMH SNRIVN OM 007 2

 

  

ot

\W/NOILOS

 

1708 8/5 OLIW? HUM
Td HWS O1 Xd
00S ONITid - 6912 SV HLM OMH 2 * 054
ATENOD OL SIVWd TH LVHL LON
SIWd CMH INNIVA OH OO O

‘Sutuvz8
sane
SeD 0or O emawoe
ALS SSIWNVLS

2b 3dAL VION X Out
OMH 8E * 92

ENO! {— 4
_|
GMA 9 X92).

“ONDRSO

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 16

X

 

 

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
DECLARED FISH HABITAT AREA; WILD RIVER AREA |
4.13 Is any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
KX] No
LJ Yes

IPA, schedule 8, part 1, table 4, tem 7

IPA, schedule 8, part 2. table 4, tem 3

IP Regulation, schedule 2. table 2. tem 25

IP Regulation, schedule 1 part 3, table 4. sem /
Wild Rivers Act 2005, sections 43A

Fisheries Act, section 76DC fwid river area)

 

 

(REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA |
414 (s any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 19947

— No

Cl Yes

IPA, schedule 8, part 1, iable 4, item 8

IPA, schedule 8, part 2, lable 4, tem 4

IP Regulation, schedule 2. table 2, itern 29

IP Reguiatan, schedule 1, part 3, tabie 4, tem &
Fisheries Act 1994, section 76DA (wild river area}
Wild Rivers Act 2005, section 43A

 

 

MILD RIVERAREA - : i
4.15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?

—X No

Cl] Yes

IPA, schedule 8 part 1, table 4, item 16
IP Regulation, schedule 2, table 2, item 37
Wild Rivers Act 2005, sections 42. 43A

 

 

{STATE-CONTROLLED ROAD - . |
4.16 {s any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?

KK] No

(1 Yes

IP Regulation, schedule 2, table 2, item 3

 

Disclaimer:

While the Department of Local Government, Planning, Sport and Recreation (DLGPSR) believes that this information contained on this
form and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the information
without first making your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances.

To the full extent permitted by law DLGPSR expressly disclaims all liability {including but not limited to liability for negligence) for errors
or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form

 

 

 

 

 

 

 

Proposal ID

 

 

 

 

 

—<==——

Click here to: submit-your-BA

 

 

 

 

Page 17

 

 

xm . LAND USE SECTION FEES
wr MENLOXOSY | ——

RECEIPT TYPE

SALE OF DOCUMENTS
Superseded: Planning Scheme Documentation 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation . 111
APPLICATION FEES
, Material Change of Use - Code/Impact ;
Consistent . 5217
Inconsistent 521
. Assessment under Superseded Planning Scheme . : 521
Modification to a Development Permit . , 521
: Extension of a Currency Period : : 521
e@ Operational Works - Landscaping . 521
Bldg Work assessable against the Planning Scheme 521
PRE LODGEMENT REVIEW .
Half Hour 522
One Hour 522
ADVERTISING :
Purchase Advertised Applications : 523
JETTIES
Jetty Application Fee : B00 524
- Jetty Bond Soo 51
. (Category 4)
BONDS
Performance Bond . . ; 51
: (Category 9)
SIGNS : : .
@ Registration Fee —_ 222
SEARCH FEE
Search of Land Use Section file 112
Liquor Licensing Request 113

 

TOTAL $ 1 &aQ0

NAME: My -~ Me Mackervoree

ADDRESS: [Dre Promo fan
MessAVILLE Vusee .

FILENO: © el Ooms DATE: ) wr] lo r

RECEIPTNO: S782 / Signature of TP Officer: S Kowa
O

AUTHORITY NO:

[4/reos/ 2273/1

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.