Skip to the record
The only place to find full transcripts.

Original source · versioned page text

08/0273 - Operational Works - Transport Type 5 - Jetty [As Published]

of 17

Page text read automatically using OCR, there may be inaccuracies

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkltst, Version 21.0, 3 September 2007
IPA, schedule 8, part 1, table 5. item 1
JP Regulation, schedule 2, table 2. item 11
IP Regulation, schedule 7. table 5, vem 2 (wid river area}
Water Act 2000, section 966C
Wild Rivers Act 2005, section 43A

 

 

“ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVERAREA . . wo : ae ~
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

BX] No

(] Yes

IPA, schedule 8 part 1, tale 2. tem 7

IPA, schedule 8, part 1, table 5, tems 3 and 4

IP Regutation, schedule 2, table 2, tems | and 23

Environmental Protection Act 1994, sectian 73AA (wild river area)
Wild Rivers Act 2005, section 43A

 

 

 

 

WIHINTHELINTS OFAPORT " . 4d
1.4 (s any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?

Bd No

LC] Yes

IP Regulation, schedule 2, table 2, items 15 and 16
IDECLARED FISH HABITAT AREA : |
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?

DJ No

[1 Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA,
schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

IP Regulation, schedule 2, table 2, tem 26
(COMMUNITVINFRASTRUGTURE "jo

1.6 's any part of the premises designated for community infrastructure?

—] No
() Yes

IP Regulation, schedule 2, table 3, tem 7

WASTEWATER MANAGEMENT _ Lr arr ]

 

a

   

 

17 Does the proposal involve the establishment or expansion of a waste water disposal system?

>] No
[1 Yes

JP Regulation, schedtle 2, table 3, item &

 

 

SEC THe 4 Saction 4 must be completed when the application seeks approval to carry out operational work,
PUIANNINGSCHEME |

41 ls any of the proposed operational work assessable under a planning scheme?

[]_ No - Go to Question 4.2 below
EX] Yes - Complete Part E of IDAS Application Form 1 and Questions 4.1.1 - 4.1.8 below

 

 

 

BIATECONTROLEDROAD.. gid
4.1.1 Is any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?
—] No

C] Yes

Log in to download the original (08_0273 - Operational Works - Transport Type 5 - Jetty [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.