08/0273 - Operational Works - Transport Type 5 - Jetty [As Published]
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checktst, Version 21.0, 3 September 2007
47 Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?
KK] No
(1 Yes
IPA, schedule 8. part 1, fable 4. tem 3{c}{u)
iP Regulation, schedule 2 table 2 tem 8
IP Regulation. schedule 1, part 3. table 4, item 3
Water Act 2000, section 966A {wild rver area}(Note. no current Wid River declaration identifies taking or interfering with subartesian water as assessable}
Wud River code (Note ihe code does not currently contain appiicable provisions for sub artesian water)
48 Is any of the proposed operational work to allow, under the Water Act 2000, for interfering with overland flow water?
1 No
[J Yes - Answer both (a) and (b) below
IPA, schedile 8, part 1, table 4, dems 3{c}{i) and 3{d}
iP Regulation, schedule 2, table 2, item 9
IP Regulation, schedule 1, part 3, table 4, item 3A
Water Act 2000, section 966B {wild river area}
49 is the proposed operational work for the following?
« For the construction of a referable dam as defined under the Water Act 2000 & No 1 Yes
@ * To increase the storage capacity of a referable dam by more than 10% & No 1 Yes
If yes to either or both - (Complete Part Ks) This application requires assessment by the Department of Natural Resources and Water (NRW).
if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, tem 4
IP Regulation, schedule 2, table 2, item 10
{TIDAL WORK; WILD RIVER AREA
4.10 1s any of the proposed operational work tidal work, other than excluded work defined under the IPA?
—] No
(11 Yes - Answer (a) and (b) below
JPA, schedule 8, part 1, table 4, item 5
IP Regulation, schedule 2, table 2, items 12, 14 and 17
iP Regulation, schedule 1, part 3, table 4, tems 4A and 5
Coastal Protection and Management Act 1995, section 104A (wild river area)
‘COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA . . : i
4.14 Is any of the operational work proposed to be carried out within a coastal management district?
e@ & No
(0 Yes
IPA, schedule 8. part 1. table 4, em 5
IP Regulation, schedule 2, table 2, tems 12 and 14
IP Regulation, schedule 1, part 3, table 4, tems 4A and 5
Coastal Protection and Management Act 1995 Act 1995, section TOMA {wild rivet area}
Wild Rivers Act 2005, section 43A
WATERWAY BARRIER WORKS; WILD RIVER AREA - - : oe _|
4.12 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
DX} No
[1 Yes
IPA, schedule 8, part 1, table 4, item 6
IPA, schedule 8, part 2, table 4, item 2
IP Regulation, schedule 2, table 2, tem 28
IP Regulation, schedule 1, part 3, table 4. tem 6
Fisheries Act 1994. section 76D {wild river area}
Wild Rivers Act 2005, section 43A