Skip to the record
Every meeting, every word.

Original source · versioned page text

Slope Stability AG-220616-RPT-G-01_[Rev A]

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 Notes
Levels shown are
approximate and are sourced
from local council mapping
or information provided by                                                                                                                                                                                                         N
the client. These levels are
solely to demonstrate the
functionality of the system.                                                                                                                       Proposed Fixed Surface
Actual floor height is to be                                                                                                                       Irrigation Area - 240sqm
confirmed with the builder                                                                                                                         (12 x 20m)
prior to installation.                                                                                                                             (Approx RL 119)
All pipe work from the
structure to the proposed
system should be covered
and adequately vented and
be vermin/insect proof.
All work carried out should
meet relevant
codes/standards and be done
by an appropriately qualified                                                    BH4
                                                                     BH5
and licensed person.                                                             PT2
                                                                     PT3
Proposed system should be
constructed in a way to
maximize evapotranspiration
and minimize potential
pooling and runoff.                                             2m
If plans were not available at
                                                                                       BH3                                                                                       Proposed Advanced
the time of investigation
                                                                                       PT1                                                                                       Secondary ASTP
further reporting and design
                                                                                                            Reserve Area                                                         (Approx RL 126)
work may be needed prior to
council submission and
installation.
Care is to be taken not to
compact,smear or damage
the soil structure during


                                                                                 20m
installation (This can lead to
premature failure).
                                                                                             Slope 27-30%
If structures have been built
since our initial investigation
(Including neighboring
structures) please contact us                                                                                                                                            Proposed Residence
to confirm this will not                                                                                                                                                 (Approx RL 130)
adversely effect the design.
Final landscaping and
                                                                      82




installation should discourage
                                                                      m




and limit causal pedestrian
                                                                       Ap




access.(By way of plantings,                                                                 BH2            BH1
                                                                           pro




border, mounds, visual and
                                                                            x.




or physical deterrents)
The owner should obtain
knowledge on how to use
and maintain the proposed
system. Most of this is
available from your chosen                                                                                                                                           Typical Fixed Surface Installation (NTS)

supplier/installer.
                                                                                                                                                         Heavy
This report must be
                                                                                                                                                         Droplet
approved by the local council
                                                                                                                                                         Sprinkler
prior to any work
commencing.
The effluent disposal
report must be
accompanied by a Site
Classification Report. If




                                                                                                                                                                                                                 300mm
the Site Classification is
H1,H2, E or P an
articulation joint will need
to be designed by a
person licensed to do so.

Client- Bliss Homes & Renovations
Site - Lot 8 Hinterland Close, Tinbeerwah
                                                                                                                                                                                                                Ground Drill Pty Ltd
Date - 16/06/22
                                                                                                                           Abbreviations                                                                        Sunshine Coast, QLD.
Job# - 22/224
                                                                                                                           BH : Borehole           DCP : Dynamic Cone Penetrometer                              QBCC # 150 345 80
Scale - 1 : 750 @ A4 (Site features are approximate-Do not scale)
                                                                                                                           PT : Percolation Test   HD : Heavy Droplet Lilac Sprinkler                           E: [email protected]
                                                                                                                           TV : Turf Valve         RWT : Rain Water Tank                                        W: www.grounddrill.com.au
                                                                                                                                                                                                                P: 0407 035 220
Log in to download the original file

Slope Stability AG-220616-RPT-G-01_[Rev A].pdf · 4.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.