Original source · versioned page text
Slope Stability AG-220616-RPT-G-01_[Rev A]
ABN 51 640 311 842
arcosgroup.com.au
Sunshine Coast | Brisbane | Gold Coast
ABOUT YOUR GEOTECH REPORT
Reporting
These notes have been provided to clarify and The report has been prepared and reviewed by
enhance the reader’s understanding of the suitably qualified and experienced persons. The
terminology used throughout the report, and also to persons draw on previous experience, local
identify where limitations exist. All investigations are knowledge, published literature, and otherwise
undertaken based on budgetary constraints which standard engineering approaches and principals. The
impart a level of uncertainty as a result of limiting the context of which the report has been prepared for must
amount of investigation undertaken. be considered and if the context changes, due
consideration should be given to the possibility that the
report is no longer considered relevant and review by
Copyright Arcos Unit Group Pty Ltd must be undertaken.
This report remains the property of Arcos Unit Group Arcos Unit Group Pty Ltd undertakes quality
Pty Ltd at all times unless ownership is transferred in assurance checks in accordance with its’ quality
writing. It cannot be included in any documentation system requirements; however, restrictions on the
without the express written permission of Arcos Unit project outside of Arcos Unit Group Pty Ltd’s control
Group Pty Ltd can result in unanticipated variations, changes in
policy or interpretation of said policies by the relevant
authority, or the actions of contractors subject to
Subsurface Report Sheets (Bores etc) commercial pressure.
The provided subsurface sheets are inherently an
interpretation undertaken by a suitably qualified and
experienced person; however, the reliability of the
Site Variations
provided information will rely on the method of If site variations become evident at the time of
investigation. It is prudent to state that these sheets construction or after the release of a report, Arcos Unit
only represent a very small percentage of the Group Pty Ltd requests immediately notification. This
subsurface conditions across a particular project. notification is proposed in order to assist in
remediation prior to any permanent structures or
It reasons that given the relatively small representation
design procedures are undertaken.
of the subsurface conditions for a project, spacial
variability between testing locations must be taken into
consideration including the orientation of strata Collaboration
intersections.
Arcos Unit Group Pty Ltd strongly recommends open
The presence or lack of groundwater is usually stated and collaborative communication about the use and
on the subsurface sheets; however, it must be noted inherent interpretation of Arcos Unit Group Pty Ltd’s
that the measurements undertaken onsite are typically report. Please contact the author of the report to
very inaccurate and if the presence or lack of arrange for an obligation free discussion regarding the
groundwater will have any degree of affect on the potential benefits of having geotechnical consultants.
project, additional groundwater monitoring techniques
should be employed such as groundwater monitoring
wells.
Sunshine Coast | Brisbane | Gold Coast
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.