211109 OPW Information Response Letter
Attached to the e-mail OPW21/0272 - Information Request (32 Viewland Dr Noosa Heads).
9th December 2021 NOOSA COUNCIL PO BOX 141 TEWANTIN QLD 4565 Attention: Laurie Schreck Dear Laurie, 32 VIEWLAND DRIVE, NOOSA HEADS LOT 1 ON RP226728 APPLICANT’S INFORMATION REQUEST RESPONSE Application No: OPW21/0272 We refer to Noosa Council information request, dated 12 October 2021, for the operational works application over the above site. We provide our response to this information request below. INFORMATION REQUEST RESPONSE Civil Engineering Issue Response 1 Car Parking Allocations The carpark layout plan has been amended to match the architectural GA-Plan. A separate emergency parking bay has been allocated. Refer the following supporting documentation: Appendix A for updated civil drawings, Appendix B for updated architectural drawings and 2 Pedestrian Safety The site access is no different to a standard vehicle cross-over similar to other cross overs for residential units on Viewland Drive. Nevertheless, signage and linemarking has been included, as well as a speed hump on the exit isle and surface treatment variation to improve driver awareness of pedestrians. Refer the following supporting documentation: Appendix A for updated civil drawings, Ground Floor, 61 Park Rd Milton, QLD 4064 | PO Box 1514 Milton, 4064 | www.deluca.com.au P (07) 3369 1000 | F (07) 3369 2333 | QBCC 62822 | ABN 80 055 193 514 | ACN 055 193 514
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 8 pages
Page 2
Appendix B for updated architectural drawings and
Appendix C for Landscape drawings
3 Geotechnical Certification Refer to Appendix F for geotechnical certifications
4 Geotechnical Report Refer to Appendix F for updated geotechnical report
5 Earthworks Refer to Appendix A for engineering response and
updated earthworks
6 CMP Refer to Appendix E for the Construction Management
Plan
Water Quality and Stormwater
Issue Response
7 Stormwater Design – hydraulic Refer to Appendix A for engineering response and
design updated stormwater documentation.
8 Stormwater Design – pipe sizes Refer to Appendix A for engineering response and
updated stormwater documentation.
9 Stormwater Design – re- No works are now being undertaken in verge and
instatement works agreements therefore no cross-overs will be impacted. Refer to
Appendix A for engineering response and updated
stormwater documentation.
10 Pollutant Reduction Target Refer to Appendix A for engineering response and
Calculations updated stormwater documentation.
11 Currency of References Refer to Appendix A for engineering response and
updated stormwater documentation.
12 Swale drain and Rubble Pit Refer to Appendix A for engineering response and
updated stormwater documentation.
13 Flow velocities Refer to Appendix A for engineering response and
updated stormwater documentation.
14 Biobasin Retaining Wall Heights Refer to Appendix A for engineering response and
updated stormwater documentation.
15 Biobasin Maintenance Link to “Guide to the Cost of Maintaining Bioretention
Systems” is contained with the SWMP, the
maintenance regime detailed in this document is our
intention.
16 Filtration Prior to Discharge Refer to Appendix A for engineering response and
updated stormwater documentation.
Landscaping and Vegetation Clearing/Retention
Issue Response
Impacted Street Trees Refer to Appendix D for updated Arborist Report
17 Street Fencing Refer to Appendix C for updated landscape drawings
18 Frontage Landscaping Buffer Refer to Appendix C for updated landscape drawings
Ground Floor, 61 Park Rd Milton, QLD 4064 | PO Box 1514 Milton, 4064 | www.deluca.com.au
P (07) 3369 1000 | F (07) 3369 2333 | QBCC 62822 | ABN 80 055 193 514 | ACN 055 193 514
Page 3
19 Side and Rear Landscaping Buffer Refer to Appendix C for updated landscape drawings
20 Planting Schedule Refer to Appendix C for updated landscape drawings
21 Arboricultural Report and Tree Refer to Appendix C for updated Tree Works Plan
Works Plan Conflict
We look forward to continuing working with you on this development. In the meantime, should you
have any queries, please do not hesitate to contact me directly.
Yours sincerely,
Kris Starker
Design Manager
M – 0409 839 182
E – [email protected]
Deluca Corporation
Encl. Attachment A – Civil engineering response and amended drawings and report
Attachment B – Amended Architectural GA drawings
Attachment C – Amended Landscape drawings
Attachment D – Amended Arborist report
Attachment E – Construction Management Plan
Attachment F – Updated Geotechnical report
Ground Floor, 61 Park Rd Milton, QLD 4064 | PO Box 1514 Milton, 4064 | www.deluca.com.au
P (07) 3369 1000 | F (07) 3369 2333 | QBCC 62822 | ABN 80 055 193 514 | ACN 055 193 514
Page 4
Appendix A
Civil Drawings prepared by Neil McKenzie & Associates
• C01.1-STORMWATER-DRAINAGE-LINE-1-&-LINE-2-LONG-SECTION-Rev.5
• C01.2-STORMWATER-CATCHMENT-PLAN-Rev.2
• C01-STORMWATER-DRAINAGE-LAYOUT-PLAN-Rev.4
• C02-STORMWATER-DRAINAGE-LONG-SECTION-Rev.2
• C03-SEWERAGE-LAYOUT-PLAN-Rev.1
• C04.1-SEWERAGE-NOTES-Rev.1
• C04-SEWERAGE-LONGITUDINAL-SECTION-Rev.1
• C05-EARTHWORKS-PLAN-Rev.3
• C06.1-EARTHWORKS-STRUCTURAL-RETAINING-WALL-DETAILS-Rev.1
• C06-EARTHWORKS-SECTIONS-Rev.3
• C07-STREET-PARKING-BAY-LAYOUT-PLAN-Rev.1
• C08-WATER-SERVICE-LAYOUT-PLAN-Rev.1
• C09-WATER-SERVICE-CONNECTION-DETAILS-Rev.1
• C10-CARPARK-LAYOUT-PLAN-Rev.4
• C011-EROSION-&-SEDIMENT-CONTROL-MANAGEMENT-PLAN-Rev.1
SWMP
• SBSMR 20004 Revision D - Response to RFI
Ground Floor, 61 Park Rd Milton, QLD 4064 | PO Box 1514 Milton, 4064 | www.deluca.com.au
P (07) 3369 1000 | F (07) 3369 2333 | QBCC 62822 | ABN 80 055 193 514 | ACN 055 193 514
[OCR of page images]
deluca
Appendix A
Civil Drawings prepared by Neil McKenzie & Associates
C01.1-STORMWATER-DRAINAGE-LINE-1-&-LINE-2-LONG-SECTION-Rev.5
C01.2-STORMWATER-CATCHMENT-PLAN-Rev.2
C01-STORMWATER-DRAINAGE-LAYOUT-PLAN-Rev.4
C02-STORMWATER-DRAINAGE-LONG-SECTION-Rev.2
C03-SEWERAGE-LAYOUT-PLAN-Rev.1
C04.1-SEWERAGE-NOTES-Rev.1
C04-SEWERAGE-LONGITUDINAL-SECTION-Rev.1
CO5-EARTHWORKS-PLAN-Rev.3
C06.1-EARTHWORKS-STRUCTURAL-RETAINING-WALL-DETAILS-Rev.1
CO6-EARTHWORKS-SECTIONS-Rev.3
CO7-STREET-PARKING-BAY-LAYOUT-PLAN-Rev.1
CO8-WATER-SERVICE-LAYOUT-PLAN-Rev.1
CO9-WATER-SERVICE-CONNECTION-DETAILS-Rev.1
C10-CARPARK-LAYOUT-PLAN-Rev.4
C011-EROSION-&-SEDIMENT-CONTROL-MANAGEMENT-PLAN-Rev.1
SBSMR 20004 Revision D - Response to RFI
Ground Floor, 61 Park Rd Milton, QLD 4064 | PO Box 1514 Milton, 4064 | www.deluca.com.au
P (07) 3369 1000 | F (07) 3369 2333 | QBCC 62822 | ABN 80 055 193 514 | ACN 055 193 514
Page 5
Appendix B
Architectural Plans prepared by Ellivo Architects
• 190023_A13-01-GA PLAN - GROUND LEVEL(10)
• Vehicle Swept Paths
Ground Floor, 61 Park Rd Milton, QLD 4064 | PO Box 1514 Milton, 4064 | www.deluca.com.au
P (07) 3369 1000 | F (07) 3369 2333 | QBCC 62822 | ABN 80 055 193 514 | ACN 055 193 514
Page 6
Appendix C
Landscape Plans prepared by Form Landscape Architects
• LA001-Project-Details-Rev.E
• LA002-Proposed-Stage-Plan-Rev.A
• LA201-Surface-Treatment-Plan-Level-1-Rev.F
• LA202-Surface-Treatment-Plan-Level-2-Rev.F
• LA501-Tree-Works-Ground-Level-Rev.A
• LA502-Tree-Works-Ground-Level-Rev.A
• LA601-Planting-Plan-Level-1-Rev.D
• LA602-Planting-Plan-Level-2-Rev.D
• LA801-Details-Softscape-Rev.D
• LA810-Details-Hardscape-Rev.F
• LA860-Details-Hardscape-Rev.D
• LA900-Specification-&-Plant-Schedule-Rev.D
• LA910-Material-Schedule-Rev.E
• LA911-Material-Schedule-Rev.E
• LA920-Plant-Palette-Rev.D
• LA921-Plant-Palette-Rev.D
Ground Floor, 61 Park Rd Milton, QLD 4064 | PO Box 1514 Milton, 4064 | www.deluca.com.au
P (07) 3369 1000 | F (07) 3369 2333 | QBCC 62822 | ABN 80 055 193 514 | ACN 055 193 514
[OCR of page images]
Appendix C
Landscape Plans prepared by Form Landscape Architects
LA001-Project-Details-Rev.E
LA002-Proposed-Stage-Plan-Rev.A
LA201-Surface-Treatment-Plan-Level-1-Rev.F
LA202-Surface-Treatment-Plan-Level-2-Rev.F
LA501-Tree-Works-Ground-Level-Rev.A
LA502-Tree-Works-Ground-Level-Rev.A
LA601-Planting-Plan-Level-1-Rev.D
LA602-Planting-Plan-Level-2-Rev.D
LA801-Details-Softscape-Rev.D
LA810-Details-Hardscape-Rev.F
LA860-Details-Hardscape-Rev.D
LA900-Specification-&-Plant-Schedule-Rev.D
LA910-Material-Schedule-Rev.E
LA911-Material-Schedule-Rev.E
LA920-Plant-Palette-Rev.D
LA921-Plant-Palette-Rev.D
deluca
Ground Floor, 61 Park Rd Milton, QLD 4064 | PO Box 1514 Milton, 4064 | www.deluca.com.au
P (07) 3369 1000 | F (07) 3369 2333 | QBCC 62822 | ABN 80 055 193 514 | ACN 055 193 514
Page 7
Appendix D
Arborist Report prepared by Tree Solutions
• Viewland 32 (Dec2021)
Ground Floor, 61 Park Rd Milton, QLD 4064 | PO Box 1514 Milton, 4064 | www.deluca.com.au
P (07) 3369 1000 | F (07) 3369 2333 | QBCC 62822 | ABN 80 055 193 514 | ACN 055 193 514
Page 8
Appendix E Ground Floor, 61 Park Rd Milton, QLD 4064 | PO Box 1514 Milton, 4064 | www.deluca.com.au P (07) 3369 1000 | F (07) 3369 2333 | QBCC 62822 | ABN 80 055 193 514 | ACN 055 193 514
Page 9
Appendix F Ground Floor, 61 Park Rd Milton, QLD 4064 | PO Box 1514 Milton, 4064 | www.deluca.com.au P (07) 3369 1000 | F (07) 3369 2333 | QBCC 62822 | ABN 80 055 193 514 | ACN 055 193 514