3 Previous investigations
This DMP is based on site specific information sourced from the following documentation provided to
ADG by SCG Consulting Engineers:
PTG Consulting. April 2025. Geotechnical Soils Investigation Report (Interim), Proposed Residential
Development, 20 William Street, Noosaville. PTG/02023 – 001 – Rev 1.
SCG Consulting. April 2025. Drawing Set. Operational Works for Residential Development Lot 3 on
RP63813 No. 20 Wiliam St, Noosaville. Rev issued 15 April 2025. (see Appendix C).
Skale Building Design. March 2025. Drawing Set. Duplex Residence 20 William Street, Noosaville.
2502 – 07 – Rev DA01.
A brief discussion of relevant soil and groundwater conditions is provided below.
3.1 PTG Consulting 2025
A Geotechnical and Acid Sulfate Soil (ASS) Investigation was undertaken on the site by PTG Consulting in
March 2025 (report dated April 2025). The following sections summarise the relevant information from
the report provided.
3.1.1 Soils
During the Geotechnical and ASS investigation four (4) boreholes (BH1 to BH4) were attempted or drilled
to depths of up to 3.0 m below ground level (bgl) using solid flight auger with a specialised 4WD truck‐
mounted drill rig. BH1 was terminated at surface due to presence of astroturf underlain by concrete of
unknown thickness. The sub‐surface soil profile encountered in the remaining boreholes generally
comprised a thin silty sand topsoil layer underlain by silty sand/sand to the termination depth of up to
3.0 mbgl. The sands were described as generally medium dense to dense, with some loose material
encountered near the surface. PTG noted that additional investigation will be required to adequately
characterise the subsurface profile.
A total of fifteen (15) soil samples were recovered from boreholes (BH2 to BH3) at 0.25 m intervals from
between 0.0 m and 3.0 m in depth. No samples were reported as being subject to laboratory analysis by
the Chromium Reducible Sulfur suite (CRS), despite field screening indications of potential ASS, with PTG
noting that additional CRS analysis has been arranged but not yet reported in the Interim Geotechnical
Investigation Report.
It is noted that the ASS investigation did not provide assessment of deeper soils (>3.0 mbgl) or cone of
depression that will be created during dewatering. Given ADG’s previous experience with ASS and
dewatering operations in the local area, ASS conditions are likely to become more significant with
increasing depth and rewetting of the soil structure in the cone of depression following commencement
of dewatering.
3.1.2 Groundwater
During the geotechnical and acid sulfate soil investigation, no groundwater was reported as being
encountered during the drilling of the boreholes (PTG Consulting, 2025). However, ADG notes that
groundwater levels can be perched and fluctuate seasonally and during heavy rainfall events. Due to the
site’s close proximity to the tidal Noosa River and the permeable nature of the silty sand soils
encountered, this increases the likelihood of groundwater fluctuations. In addition, ADGs recent previous
experience in the locality has generally identified standing groundwater at or around RL 0.5 to 1.0 mAHD,
and given the sandy subsurface profile and proximity to the tidal canal network associated with Noosa
Inlet these relative groundwater levels should be expected, with higher levels during or following periods
of intense or extended rainfall.
3.2 Groundwater quality
No site specific groundwater investigation was undertaken as part of the preliminary Geotechnical and
ASS Investigations undertaken by PTG Consulting. However, ADG is of the opinion that localised
monitoring well data can often be misleading and does not always accurately represent the properties of
the groundwater that will be extracted and treated from the entire site and local surrounds during
ADG1808.25 Dewatering Management Plan_Rev0_07.05.25 Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RESPONSE TO FURTHER ADVICE - ADG1808.25 Dewatering Management Plan_Rev0_07.05.25.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.