                                 SITE INVESTIGATION &
                              FOOTING/SLAB DESIGN REPORT

                         LOT 21 (No.16) PINES ROAD, COOROY

                CLIENT:                                   Chris Fraser
                                                          C/- DJ Sommer Homes
                                                          58 Dixon Avenue,
                                                          MALENY QLD 4552


                EBIS REFERENCE:                           210417-SI/FD


                PROJECT DESCRIPTION:                      Proposed New Residence


                DATE:                                     4 March 2022




PO Box 973 Buddina Q 4575 Unit 2/4 Textile Avenue Warana P (07) 5436 9199;   F (07) 5436 9198; Email: [email protected]
Log in to download the original file

Attachment 4 - Site Investigation and Slab Report.pdf · 5.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 46 pages

Page 2

LOT 21 (16) PINES ROAD, COOROY                                   EBIS REFERENCE NO: 210417-SI/FD



                    SITE INVESTIGATION, SITE CLASSIFICATION
                         AND FOOTING AND SLAB DESIGN

1.0    INTRODUCTION
1.1    General Information

We were commissioned to undertake a Site Investigation, Site Classification and
Footing and Slab Design at 16 Pines Road, Cooroy for the proposed new residence.

The site investigation was undertaken on 21 January, 2022.

2.0     TESTING
2.1     Locations

Three (3) boreholes were excavated using a hand auger and three (3) Dynamic Cone
Penetrometer (DCP) tests were undertaken at the locations shown on the attached site
sketch.

2.2     Field Testing

Soil samples were hand classified and soil profiles recorded on the attached Borehole
report no. 210417-BH.

Laboratory testing was performed on one (1) undisturbed sample and the results are
recorded in section 3.5 of this report.

3.0     FINDINGS
3.1     Slope & Topography

The proposed house site is located centrally on a ridge line which slopes towards the
north east at approximately 20-25%. An existing unsealed track has been previously cut
in below the proposed house site. Cut and fill earthworks are proposed to be
undertaken to provide a level building platform.

3.2     Vegetation

The site is well grassed. There are no trees on/near the site.

3.3     Site Drainage

We consider the drainage to be good.
Surface water ponding was not evident.

3.4     Soil Conditions

Site/Soil Summary:
Moderate to steep slopes of broad ridge line.
Cut and fill earthworks proposed.
Existing cut embankments present.
The natural soils generally consist of high plasticity silty clays and shalley gravelly silty
clays overlying weathered shalley gravels (weathered rock).
Slight seepage was encountered on the rod of DCP no.3 upon extraction indicating
seepage at the clay/weathered rock interface.
For full details of the soil strata layers refer to the borehole report within the enclosures
of this report.
PROPOSED NEW RESIDENCE                 PAGE 1 OF 3                           4 March 2022

Page 3

LOT 21 (16) PINES ROAD, COOROY                               EBIS REFERENCE NO: 210417-SI/FD


3.5       Test Results

The linear shrinkage of the sample was assessed to be 13%.
Based on our laboratory test results, the design surface movement (ys) in
Borehole no.2 was calculated to be 28mm which is in the range of 20mm to 40mm.


4.0       CLASSIFICATION
4.1       Site Classification

In accordance with the "Residential Slabs and Footings" code we have classified the
above site as a 'M' Class site.

4.2       Classification Reasons

The site has been classified as “M” because the soil is moderately reactive to changes in
soil moisture.

4.3       Footing Design Considerations

The footing design for this site must consider the following factors:

      1. Cut and fill earthworks are proposed to be undertaken to provide level building
         platforms.
      2. The site slopes moderately to steeply.
      3. Steep embankments exist on/near the site.
      4. Clays present in the soil profile are moderately reactive.
      5. Rocks/rock floaters are likely to be encountered during footing excavations.
      6. There needs to be drainage control of surface water.

5.0       RECOMMENDATIONS
5.1       Site Preparations

Site preparations should include removal of the vegetation in the vicinity of the
proposed building work.

Should it be necessary to remove any large vegetation from the site, the resulting voids
created by its removal must be backfilled and compacted to 98% standard compaction
using clean soil containing no organic material.

5.2       Site Drainage

The site should be profiled prior to construction so that water drains away from the
proposed building works.

The site drainage should be maintained after completion of the building so that water
does not pond next to the footings.

On predominantly clay sites the moisture content of the soil should be monitored prior
to the commencement of construction and maintained as set out in the CSIRO
publication "Guide to Home Owners on Foundation Maintenance and Footing
Performance". Refer to CSIRO website www.publish.csiro.au/pid/7076.htm.

5.3       Footings & Slab Design

The footings and slab should be constructed in accordance with the attached drawings
numbered A3-210417-FD1 to FD5.



PROPOSED NEW RESIDENCE                PAGE 2 OF 3                        4 March 2022

Page 4

LOT 21 (16) PINES ROAD, COOROY EBIS REFERENCE NO: 210417-SI/FD
5.4 Site Maintenance

Care should be taken to observe recommendations as set out in the CSIRO publication
"Guide to Home Owners on Foundation Maintenance and Footing Performance". Refer
to CSIRO website www.publish.csiro.au/pid/7076.htm.

5.5 Limitations

Engineering and Building Investigation Services are unable to guarantee that the soil
profile will not vary slightly across the site from that given in this report. This is due to
the inherent variable nature of all natural soils. If the soil conditions do appear to differ
from those indicated in this report Engineering and Building Investigation Services
should be contacted and requirements confirmed.

D. R. Stanfield
B.E. ( civil), C.P. Eng. MLE. Aust,, R.P.E.Q. No. 4177, Vic EB 19910.

ENCLOSURES:

Form 15 Compliance Certificate

Borehole Report no. 210417-BH

Laboratory Test Results

Site Sketch

Footing & Slab Drawings: A3-210417-FD1 to FD5

Photographs of site

Borehole Explanatory Notes

Site Drainage Diagram - DD1

Publication from the Cement and Concrete Association of Australia “Articulated Walling - Technical Note 61”

OONEMWAWNS

PROPOSED NEW RESIDENCE PAGE 3 OF 3 15 February 2022

Page 5

 

 

Form 15

 

Compliance certificate for
building design or specification

 

Queensland
Government

This form is to be used by an appointed competent person for the purposes of section 10 of the Building Act 1975 and sections 73
and 77 of the Building Regulation 2021 (Design-specification certificate) stating that an aspect of building work or specification
will, ifinstalled or carried out as stated in this form, comply with the building assessment provisions.

Additional explanatory information is included in the Appendix at the end of this form.

 

1. Property description

This section need only be completed
if details of street address and
property description are applicable.

E.g. in the case of (standard/generic)
pool design/shell manufacture and/
or patio and carport systems this
section may not be applicable.

The description must identify all land
the subject of the application.

The lot and plan details (e.g. SP/RP)
are shown on title documents or a
rates notice.

If the plan is not registered by title,
provide previous lot and plan details.

Street address (include number, street, suburb/locality and postcode)
16 PINES ROAD

 

Lot and plan details (attach list if necessary)

LOT 12 ON SP 308933

Local government area the land is situated in
NOOSA SHIRE COUNCIL

 

 

2.Description of aspect/s certified

Clearly describe the extent of work
covered by this certificate, e.g. all
structural aspects of the steel roof
beams.

PROPOSED NEW RESIDENCE

 

 

3.Basis of certification

Detail the basis for giving the
certificate and the extent to which
tests, specifications, rules, standards,
codes of practice and other
publications were relied upon.

 

AS1170.1 STRUCTURAL DESIGN ACTIONS - PERMANENT & IMPOSED ACTIONS
AS4055 WIND LOADS FOR HOUSING DESIGN CRITERIA N4

AS1684.2 RESIDENTIAL TIMBER FRAME CONSTRUCTION HYNE IN DESIGN 7.5
AS1720.1 TIMBER STRUCTURES - DESIGN METHODS

AS2870 RESIDENTIAL SLABS & FOOTINGS

AS3660.1 TERMITE MANAGEMENT - NEW BUILDING WORK

AS3798 GUIDELINES ON EARTHWORKS FOR COMMERCIAL & RESIDENTIAL
DEVELOPMENT

AS3700 MASONRY STRUCTURES

AS4678 EARTH RETAINING STRUCTURES

AS1726 GEOTECHNICAL SITE INVESTIGATIONS

NCC — NATIONAL CONSTRUCTION CODE OF AUSTRALIA

DESIGN FLOOR LIVE LOADS (AS1170.1): DOMESTIC HABITABLE 1.5kPa/BALCONY
2.0kPa

DURABILITY: ALL STEELWORK TO BE OF A TYPE SUITABLE FOR THE ATMOSPHERIC

 

 

Building Regulation 2021 © Section 73 and 77 ¢ Form 15 ® Version 1¢ September 2021

Page 10f3

Page 6

 

4. Reference documentation

Clearly identify any relevant
documentation, e.g. numbered
structural engineering plans.

SITE INVESTIGATION & FOOTING/SLAB DESIGN REPORT BY EBIS: 210417-SI/FD

CODE FOR DEVELOPMENT ON STEEP OR UNSTABLE LAND - GEOTHECHINCAL REPORT
BY EBIS: 210417-SU-GEO

DRAWINGS BY EBIS NOS: A3-210417-FD1 to FDS

DRAWINGS BY EBIS NOS: A3-210417-S1 to S6

 

 

5. Building certifier reference
number and building development
application number

Building certifier reference number

 

Building development application number (if available)

 

 

 

6.Appointed competent person
details

Under Part 6 of the Building
Regulation a person must be
assessed as a competent for the type
of work (design-specification) by the
relevant building certifier.

Name (in full)

DONALD ROBERT STANFIELD

Company name (if applicable)
ENGINEERING & BUILDING INVESTIGATION SE

Contact person
DON STANFIELD

Mobile number

Business phone number

(07) 5436 9199

    

Postal address
PO Box 973

Licence or registration number (if applicable)
RPEQ 04177

 

 

7. Signature of appointed competent
person

This certificate must be signed by the

the building certifier as competent to
give design-specification help.

 

individual assessed and appointed bf

Signature

  

 

 

LOCAL GOVERNMENT USE ONLY

 

Date received

 

 

Reference number/s

 

 

 

Building Regulation 2021 ¢ Section 73 and 77 * Form 15 © Version 1 * September 2021

 

 

 

Page 2 of 3

Page 7

Appendix — explanatory information

IMPORTANT NOTE: it is an offence for a competent person to give a building certifier a document, including this form, that the person
knows or reasonably suspects, is false or misleading.

Who can complete this certificate? (sections 10 of the Building Act 1975 (Building Act) and 73 of Building Regulation 2021 (BR 2021)

A building certifier can accept from a competent person (design — specifications) a certificate stating that the competent person has
assessed the building design or specification for the aspect of building work, and it will, if installed or carried out under the certificate,
comply with the building assessment provisions, including any relevant standards and codes.

Schedule 10 of the BR 2021 defines building design or specification as any material, system, method of building or other thing related to
the design of or specifications for building work.

For a competent person to meet the regulation requirements (section 77 of the BR 2021) they must substantially complete all sections
of this form, including information, such as the design of a particular material, system, method of building or that a building element
complies with the Building Code of Australia or a provision of the Queensland Development Code. It is also important that the details of

the relevant reference documents are included, for example, the applicable Australian Standards or other technical provisions that may
be applicable to the subject work.

What is the purpose of this form? (section 10 of the Building Act 1975)
The information in this form informs the building certifier’s decision making when they are assessing a building development
application and issuing the building development approval for the building work the subject of the certificate (form).

When is this form not required?

The assessment of some building applications will be entirely within the expertise of the relevant building certifier and therefore they
may not seek the help of a competent person. In these instances, this form is not required.

Is a manufacturer or supplier required under the BR 2021 to complete and sign this Form 15, if requested?

No. A manufacturer or supplier of building materials is not required to complete and give this form or any aspect and inspection
certificates if requested by a construction contractor, builder, appointed competent person, ora building certifier.

However, a manufacturer or supplier may give the construction contractor, builder, competent person or the building certifier evidence
of suitability such as a manufacturers statement for an aspect or material that it is compliant with the relevant reference documents in
the BCA i.e. the applicable Australian Standard/s.

What if there is not enough space for all the supporting material/documents?

Items 2, 3 and 4 requires the competent person to clearly identify the extent of the assessment that was undertaken for aspect/s of work
identified in this form.

For instance, there is provision for material such as specifications, standards, codes or other relevant publications to be referenced in

the form, However, if the space in the form is not sufficient to accommodate all of this material, you can create and refer to additional
material in an addendum or attachment to the form.

The form is also available in a Microsoft Word version, that you can download and edit to include additional material in the relevant
parts of the form. Note that editing the form in the Microsoft Word version may cause the relevant boxes to expand and increase the

length of the document. This is acceptable and does not change the approved form, provided the section text (description on the left-
hand side of the page) is not altered.

Appointed competent person (design or specification) — (sections 34 and 36 of the BR.2021)
A building certifier must assess and decide to appoint an individual as a competent person before they can, as a competent person,

give design-specification help. The building certifier is required to keep detailed records about what was considered when appointing a
competent person.

A building certifier must be satisfied that an individual is competent to give the type of inspection help having regard to the individual’s

experience, qualifications and skilis and if required by law to hold a licence or registration, that the individual is appropriately registered
or licensed.

An individual is appointed as competent to give design-specification help on or from a particular day. The building certifier can also

decide an individual is a competent person (design-specification) and a competent person (inspection) at the same time or for the same
systems or components of the work.

For further information about assessment of someone as a competent person refer to the Guideline for the assessment of competent persons.

PRIVACY NOTICE

The Department of Energy and Public Works is collecting personal information as required under the Building Act 1975. This information
may be stored by the Department, and will be used for administration, compliance, statistical research and evaluation of building laws.
Your personal information will be disclosed to other government agencies, local government authorities and third parties for purposes

relating to administering and monitoring compliance with the Building Act 1975. Personal information will otherwise only be disclosed to
third parties with your consent or unless authorised or required by law.

Building Regulation 2021 « Section 73 and 77 * Form 15 ® Version 1 ¢ September 2021 Page 3 of 3

Page 8

 

 

 

 

 

 

 

| -ENGINEERING
“& BUILDING INVESTIGATION SERVICES

EBIS

 

 

   

ACN: 104 324 969
ABN: 93 104 324 969

 

 

 

 

 

 

Client: DJ Sommer Homes (Cooroy) Our Reference: 210417-BH
Site Address: L21 (16) Pines Road, Cooroy Date Tested: 21/01/22
Drill Type: Hand Auger Borehole Location: Refer Site Sketch
BOREHOLE LOG NO.1
Samples Classification . Consistency/
Taken FILL bcp Depth Symbol SOIL DESCRIPTION Moisture Density
0 (CH) Silty clay Moist Soft
- 100 Dark brown
. Very
1 200 (CH) Silty clay moist Soft to firm
2 300 Trace gravels
3 400 Brown
Silty clay with gravels . .
4 500 (Ch) Fine to medium & coarse grained sand Moist Stiff
6 600 Red brown
3 700 (Ch) Shalley gravelly silty clay Moist Stiff
3 800 Fine to medium & coarse gravels
Gravels increasing
5 900 | Some cobbles & rock fragments
5 1000 END BOREHOLE Hand Auger
5 4100 UTP cobbles & rock fragments
6 1200
7 1300
7 1400
11 1500
15 1600
25 1700

 

 

 

 

 

 

 

 

 

 

Page 9

ie X.

‘it | ENGINEERING
| t

 

 

 

 

 

 

 

 

EBIS
| 7 & BUILDING INVESTIGATION SERVICES

 

 

 

 

 

 

 

 

if
doar
Client: DJ Sommer Homes (Cooroy) Our Reference: 210417-BH
Site Address: L21 (16) Pines Road, Cooroy Date Tested: 21/01/22
Drili Type: Hand Auger Borehole Location: Refer Site Sketch
BOREHOLE LOG NO.2
Samples | Fit | pcp | Depth Csymbol SOIL DESCRIPTION Moisture | Consistency!
0 (CH) Silty clay Moist Soft
1 100 Dark brown
mee +] 200 |e 1 a wot |S
1 300 Brown
3 400 (Ch) Fine to modo somes grained sand Moist Stiff
4 500 Red brown
6 600 (Cl) Shailey gravelly silty clay Moist Stiff
8 700 Fine to medium & coarse gravels
10 800 Gravels increasing
12 900 Some cobbles & rock fragments
10 4000
10 1100 END BOREHOLE Hand Auger
1200 UTP cobbles & rock fragments
1300
10 1400
12 1500
10 1600
11 1700
10 1800
12 1900
10 2000
14 2100
14 2200

 

 

 

 

 

 

 

 

 

 

Page 10

 

 

 

 

 

 

   

.
{ *

“& BUILDING INVESTIGATION SERVICES

EBIS|

 

ACN: 104 224 969
ABN: 93 104 324 969

 

 

 

 

 

Client: DJ Sommer Homes (Cooroy) Our Reference: 210417-BH
Site Address: L21 (16) Pines Road, Cooroy Date Tested: 21/01/22
Drill Type: Hand Auger Borehole Location: Refer Site Sketch
BOREHOLE LOG NO.3
Samples Classification Consistency/
Taken FILL DCP Depth Symbol SOIL DESCRIPTION Moisture Density
0 (CH) Silty clay Moist Soft
- 100 Dark brown
- 200 (CH) Silty clay Moist Stiff
2 300 Trace gravels
1 400 Brown with red mottling
3 500 (Cl) Shalley gravelly silty clay Moist Stiff
8 600 Fine to medium & coarse gravels
Gravels increasing
10 700 Some cobbles & rock fragments
4 800 END BOREHOLE Hand Auger
900 UTP cobbles & rock fragments
- 1000
12 1100
18 1200
14 1300

 

 

 

 

 

 

 

 

 

 

Page 11

de
“OENGINEERING EBIS

7 & BUILDING INVESTIGATION SERVICES

ACN: 104 324 969
ABN: 93 104 324 969

 

   

Bal =\.
J

 

 

 

LABORATORY TEST RESULTS
Client: DJ Sommer Homes Job No: 210417
Address: 16 Pines Road, Cooroy Lab No: 210417-A
Location: BH2 @ 200-300 Date Sampled: 21/01/2022

 

Description: Silty Clay with gravels (CI-CH) Firm, Moist,
Yellow Light Brown with Orange mottling

Test Procedure: AS1289.3.4.1/2.1.1

 

 

 

 

 

 

 

 

 

 

 

 

 

LINEAR SHRINKAGE CALCULATION
Length of Mould (mm} 150
Length of Dry Soil (mm) 131
Shrinkage (mm) 19
Linear Shrinkage % 13
Prepared by: Louis McGrath Date: 25/01/2022

PO Box #73 BUDDINA 0 4575
Unit 2 / 4 Textiie Ave, Warana
P (07) 54369199

F (07) 5436 9198

E [email protected]

Page 12

 

 

 

 

 

 

 

  

{NGINEERING

& BUILDING INVESTIGATION SER VICES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ACN: 104 324 969

 

 

 

 

ABN: 93 104 324 969

 

 

 

 

 

 

 

 

DETAILS ON THIS PLAN ARE
APPROXIMATE ONLY. DO NOT
SCALE FROM PLAN FOR
CONSTRUCTION PURPOSES.

 

 

 

 

PROPOSED FUTURE DRIVEWAY -
ALL DETAILS TO BE CONFIRMED

 

 

 

 

     
 

PROPOSED FILL
EMBANKMENT BY Ad
OWNER - DETAILS /

TO BE CONFIRMED,

 
 

—+—UNSEALED TRACK

  
 
  
   
 

CUT EMBANKMENT WITH HARD
[—~SHALEY ROCK EVIDENT IN CUTIING

 

   
 
  
  
   
 

AN
o> X LY it

WY COARSE
qx PROPOSED we

   

RESIDENCE

APPROXIMATE CENTER
OF RIDGE UNE

ror eaae NOMEN

EMBANKMENT

bo togg

3.8653 Ha rASTEOANATELOCATON SP

LOCATION TO BE CONFIRMED

SITE SKETCH

JOB No.: 210417
Scale.:N.T.S. Drawn: LM

Page 13

LOT 21 PINES ROAD, COOROY

  PHOTOGRAPHS OF SITE




      Proposed house site


[OCR of page images]
LOT 21 PINES ROAD, COOROY

PHOTOGRAPHS OF SITE

 

 

 

 

Proposed house site

Page 14

  LOT 21 PINES ROAD, COOROY

      PHOTOGRAPHS OF SITE




             Proposed house site




Driveway alignment on north side of ridge line

Page 15

      LOT 21 PINES ROAD, COOROY

          PHOTOGRAPHS OF SITE




Shallow bedrock in cut in embankments near house site

Page 16

 

 

 

SITE CLASSIFICATION - CLASS "M" Cancers ON Solt MOSTURE

 

 

FOOTING DESIGN CONSIDERATIONS:

~ CUT & FILL EARTHWORKS ARE PROPOSED TO BE UNDERTAKEN TO PROVIDE LEVEL BUILDING PLATFORMS

- THE SITE SLOPES MODERATELY TO STEEPLY

~ STEEP EMBANKMENTS EXIST ON/NEAR THE SITE

- CLAYS PRESENT ON THE SOIL PROFILE ARE MODERATELY REACTIVE

~ ROCKS/ROCK FLOATERS ARE LIKELY TO BE ENCOUNTERED DURING FOOTING EXCAVATIONS
- THERE NEEDS TO BE DRAINAGE CONTROL OF SURFACE WATER

 

E.B.I.S. RECOMMENDS THAT WE UNDERTAKE
CONSTRUCTION INSPECTIONS FOR FOOTING
AND/OR SLAB EXCAVATIONS TO VERIFY SITE

 

 

 

 

 

 

ALTERNATIVE SLAB DESIGN

125mm THICK CONC. FLOOR

SLAB REINF. WITH 2 LAYERS OF SL82 MESH
30 TOP & 40 BTM COVER

P4 PIERS TO BE DELETED

P1 350 dia FOOTING PIERS FOUNDED
& 900mm MINIMUM DEPTH & TO REFUSAL
ONTO ROCK (REINF. AS NOTED)

P2 350 dia FOOTING PIERS FOUNDED
& 900mm MINIMUM DEPTH & TO REFUSAL
ONTO ROCK

P3 350 dia THICKENING PIERS FOUNDED
900mm MINIMUM DEPTH & TO REFUSAL
ONTO ROCK

P4 350 dia INTERNAL SLAB PIERS FOUNDED
& 900mm MINIMUM DEPTH & TO REFUSAL

 

 

 

 

RESIDENCE SLAB

100mm THICK CONC. FLOOR
SLAB REINF, WITH SL82 MESH.

 

 

 

 

P5 350 dia PAD FOOTINGS FOUNDED
& 900mm MINIMUM DEPTH & TO REFUSAL
ONTO ROCK

Pé 350 dia PAD FOOTINGS FOUNDED
& 900mm MINIMUM DEPTH & TO REFUSAL
ONTO ROCK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ONTO ROCK
AND SOIL CONDITIONS PRIOR TO PLACEMENT 30 TOP COVER IN CUT AREA
OF CONCRETE 40 BTM COVER IN FILL AREA
Pb Pb Pb Pb Pb P6 P6 P6 Pb Pb P6
QO Pé
ALTERNATIVE SLAB DESIGN e ~ “ © © ~ o o 4 Vv ac
125mm THICK CONC. FLOOR
SLAB REINF. WITH 2 LAYERS OF SL82 MESH
30 TOP & 40 BIM COVER
P4 PIERS TO BE DELETED
PI fal Pl Pl Pl PI PI PI Pl PI Py
i vy | (7) ZT I i AA. T - zy, i U7) LZ). i At +H
RET. WALL 1200 RET. WALL
GARAGE SLAB Po [ 200 200 z | O @ Pé
| 100mm THICK-CONC:-FLOOR OS 7 LW r O | LU oO 4 LU r 5 1 HW r O 1g LK r O 1 PS
SLAB REINF. WITH SL82 MESH. LH P3 P3 P3 P3 ZO P3 Lh
40 BOTTOM COVER ae Lo | | 1o} | | a | | Loo 1 O | é| | IO! AP
P4 P4 Pd P4 P4 6 P4 |
x
THICKENING BEA = ul
P2 P2 P2 P6 pL THICKENING BEAM [oO EE FA
P2 () C) CG D) Pit —o— © —O— © ~O" oO _O © __O- © _O —t) Pl PS cut
1 TV Tp3 | Tp3 P3 | [ps P3 ~} Tp3 P3 TT p3 P3 r QO Hrs
He H rea oO
8 r—7 --4 BEAM ro7 | | ra7 | | roa | | r—4 roa | | ro 0
2 10| es 10! | _ al © | Or |O| Or |1Ol Or 10] Or |Ol Ors |Ot [Fes Pl
We Lo - Pree Lo Loo M | Leo Lo Leo Ae cH LV ZT AD (7 Pl
p2 (2 a a Cy P2 Pa Pa Pa Pa ee 4 1200 RET. WALL
<
6 THICKENING BEAM | _ JE =_J tL __ HH | THICKENING BEAM |{ 0 Ed ee
x oO O O | rift — om —o— © = QO _ oO O_O OO Pl
cpg P3. =P r ~T Tes | ° sl Tes a ott P3 a ee Be) “TT ps L.
<
PO roa roa le Tou for | fe || |
g 101 Ces | © | Pu Ors 10 ZO Ps AN
pigs Bete. Pe PRP ah | | |
PA P | ©
J x
| _| Fit , LI 1 V
P2 {2 OQ O GjP2 PI oO C) 2 OD Oo aEN YY oO Oo oO oO Pl
P2 P2 _ — P2 P2 P2 P2 7 ry TW p2 P2 P2 P2 P2
ee P2 P2 P2  ATRE-ENTRANT CORNERS
PLACE 2 PIECES 3-L117M200
a 1500 LONG TIED UNDER
ee SLAB MESH AT 45°
FOOTING & SLAB PLAN
FOR TENDER/APPROVAL 02.03.2022

 

 

Engineering & Building Investigation Services Proposed New Residence

FOOTING & SLAB PLAN

Drawing No. A3-210417-FD1

 

at Lot 21 (No. 16) Pines Road, Cooroy
Client: C & H Fraser

Unit 1/4 Textile Ave, Warana PO Box 973 Buddina 4575
T: (07) 5436 9199 F: (07) 5436 9198 E: [email protected]

 

 

Scale: 1:100

February 2022

Drawn: SLS

 

Checked: Cyd

 

 

Page 17

 

NOTES

1. CONCRETE CLASS

CONCRETE TO BE CLASS N25 FOR SLABS & CLASS N20
FOR FOOTINGS & PIERS. 80 SLUMP. 20 NOM. AGGREGATE

2. CONCRETE COMPACTION

ALL CONCRETE TO BE MECHANICALLY VIBRATED FOR
COMPACTION IN TRENCHES OR FORMWORK.

3. SITE SOIL CONDITIONS

IF SOIL OR SITE CONDITIONS VARY FROM THOSE
INDICATED IN THE SITE INVESTIGATION REPORT THEN
THE FOOTING AND SLAB DESIGN SHOULD BE VERIFIED
WITH E.B.LS.

4, SCALED DIMENSIONS

DO NOT SCALE THIS DRAWING FOR SET OUT. REFER TO
DIMENSIONED WORKING DRAWINGS.

5. TERMITE MANAGEMENT.

PROVIDE TERMITE MANAGEMENT SYSTEM TO REDUCE
LIKELIHOOD OF TERMITE INFESTATION & TO DETER
CONCEALED ENTRY.

|

j | TIMBER
IN HIGH MOISTURE SITES, | | FRAME
COAT EDGE WITH XYPEX

.. CONCENTRATE WHERE |.
CONCRETE IN CONTACT | |
LAP VAPOUR BARRIER

WITH SOIL OR EXTEND
VAPOUR BARRIER 10 {| 200mm MIN. & FULLY TAPE
FIGURE 5.2 OF AS2870 |

6. FILL COMPACTION

COMPACT FILL UNDER SLAB TO 65% SAND DENSITY
INDEX OR 98% STANDARD COMPACTION. USE ONLY CLEAN
SOIL - FREE OF ORGANIC OR COMPRESSIBLE MATTER.

7. ARTICULATION JOINTS

ARTICULATION JOINTS TO BE CONSTRUCTED IN ACCORDANCE
WITH “CONCRETE INFORMATION" FROM THE CEMENT AND
CONCRETE ASSOCIATION OF AUSTRALIA - TECHNICAL NOTE 61.

8. LOAD BEARING

LOAD BEARING WALLS SHOULD BE SUPPORTED BY SLAB
THICKENINGS. WHERE THIS DOES NOT OCCUR, VERIFY THE
DESIGN WITH E.B).S.

9. SITE INSPECTIONS

THE FOOTING & SLAB PREPARATIONS SHOULD BE VERIFIED

BY INSPECTIONS DURING CONSTRUCTION. WHERE PREPARATION
VARIES FROM THE DESIGN THEN ADEQUACY SHOULD BE
VERIFIED WITH E.B.1.S

10, HOT WEATHER CONDITIONS

DURING HOT OR WINDY CONDITIONS
ADDITIONAL PRECAUTIONS SHOULD BE TAKEN

TO CONTROL EVAPORATION, TO REDUCE THE RISK
OF PREHARDENING CRACKING IN CONCRETE,
THIS MAY TAKE THE FORM OF A SPRAY ON ANTI -
EVAPORATIVE AGENT AND ESTABLISHING A
TEMPORARY WIND BREAK

11, BLOCK WORK REINFORCING

VERTICAL STARTER BARS ARE TO BE PROVIDED TO COINCIDE
WITH THE LOCATIONS SPECIFIED BY THE DESIGNER. THESE ARE
GENERALLY AT ALL CORNERS, EITHER SIDE OF OPENINGS
AND AT 1200 MAX CENTERS AND ARE TO BE CAST INTO

THE FOOTING AND/OR SLAB

12, PLUMBING (STORMWATER & SEWER)

FOR “M, H1, H2 & E" CLASS SITES, PROVIDE ROTATION BENDS &
TELESCOPIC JOINS TO ACCOMODATE MOVEMENT OF SOIL
WITHOUT SEPARATION OF PIPEWORK. PIPEWORK FITTINGS SIMILAR
TO “STORMPLASTICS" (WITH RECOMMENDED PRACTICE) IS
RECOMMENDED. WHERE LARGE RUNS OF PIPE, SOFT SOILS OR
UNCOMPACTED FILL LOCATED UNDER SLAB, PROVIDE SUPPORT
FIXING TO SUSPEND FROM MAIN SLAB

13, REFERENCED DOCUMENTS

THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH
REPORT No. 210417-SI/FD BY EBIS

COMPLIANCE WITH DESIGN

FOR COMPLIANCE WITH OUR DESIGN, THE FOLLOWING
MINIMUM STANDARD FOR PIER/PAD FOOTING CONSTRUCTION
IS REQUIRED:

BASE OF PIERS ARE TO BE OF AT LEAST THE SPECIFIED DIAMETER

LOOSE SOIL IS TO BE FULLY REMOVED TO EXPOSE THE SPECIFIED
FOUNDING SOILS;

WHERE COMPLETE REMOVAL OF SOILS IS UNACHIEVABLE, THEN
DEPTH OF THE FILL SHOULD BE LIMITED TO NO MORE THAN 50mm
AND COMPACTED TO ACHIEVE AN ALLOWABLE BEARING CAPACITY
OF 200kPa

AS A GUIDELINE ONLY

FOR SAND:

A70 x 35 STUD SHALL NOT PENETRATE MORE
THAN 20mm USING GREAT EFFORT

FOR CLAY:

A N12 ROD SHALL NOT PENETRATE MORE
THAN 50mm USING GREAT EFFORT

THICKEN SLAB LOCALLY & PLACE
EXTRA SQUARE SL82 SLABMESH
(1200 x 1200) OVER EACH SLAB
PIER. 30 TOP COVER

 

 

 

 

 

 

 

I" N12 STARTER BARS
| At 1000 CTS OR

| RIO STARTER BARS
|

j

 

AT 600 CTS

 

 

 

 

AS PER CLAUSE 5.3.3.4

3-L11TM TOP & BTM TIED AS2870

WITH R6 LIGS AT 900 CTS
OR EQUIVALENT CAGE
[ FOUND P2 PIERS

350

FOOTING & SLAB DETAIL

TERMINATE VAPOUR BARRIER
MIN. 400mm INTO FOOTING

oo oo
3-L1 Tw200 § a ===

 

 

 

ee ee ee >

350

THICKENING BEAM DETAIL

_ a — FOUND P3 PIERS
(a) OF ~ : | | AS SPECIFIED : Te

"TO NCC/AS2870 Te

. 1000 ~~" 1 TONCC/AS2870

  

SL82 SLABMESH. 30 TOP/40 BTM COVER | \ SL82 SLABMESH. 30 TOP/40 BTM COVER | | , 5t82 SLABMESH. 40 BTM COVER \ {|
E = 100 > = 100 | ; ==. = 100 125
pa a Tee ee ——— =
be VAPOUR BARRIER | t r __ -_ Lo VAPOUR BARRIER | a ~ eee ieee eae — VAPOUR BARRIER. |
a TO NCC/AS2870 —L

FOUND P4 PIERS.

: ASSPECIFIED”
350 TO

 

SLAB THICKENING DETAIL

FOR TENDER/APPROVAL 02.03.2022

 

 

Engineering & Building Investigation Services —

Unit 1/4 Textile Ave, Warana

PO Box 973 Buddina 4575

Proposed New Residence

EBIS

 

T: (07) 5436 9199 F: (07) 5436 9198 E: [email protected]

 

Client: C & H Fraser

at Lot 21 (No. 16) Pines Road, Cooroy

FOOTING & SLAB DETAILS

Drawing No. A3-210417-FD2

 

Scale: 1:20

 

February 2022

Checked tod

Drawn: SLS

 

 

 

Page 18

 

| \ SL82 SLABMESH. 40 BTM COVER
100 —_——_— >,

f  F7 VAPOUR BARRIER

 

VERT. BARS BENT
| 500 INTO SLAB

  
  

 

 

 

 

 

 

 

 

 

 

N12 STARTER BARS
AT 400 CTS. LAP
500 WITH VERT. BARS

TO NCC/AS2870 =
VN a

2 2

Do

&

N12 BARS AT 400 &

COMPACTED 5
TH WAY: =

| EARTH FILL CTS BOTH s o
Pad

5

&

QoQ

2

x

 

 

 

 

 

 

[NARS
Fr 4
3-L11TM TOP & BTM TIED | l ol 8
WITH Ré LIGS AT 900 CTS g,
OR EQUIVALENT CAGE | i l
bo a

 

 

 

 

 

Ue
aAll

AS SPECIFIED

4-N12 BARS.IN PIER TIED
WITH R6 LIGS AT 300 PITCH

 

 

350

RETAINING WALL DETAIL

 

 

 

 

 

 

 

 

TM (TOP & BIM) 3-L11TM 200
FOOTING DEPTH 450 DEEP
HEIGHTOFCAGE | 300
NUEMANNS

STEEL CAGE NS7
BLUESCOPE

BLUESCOP| Z17X30412
MESH & BAR

ZED CAGE 27
BLUESCOPE

WICAGE 1220X30611
ONeTEEL ze71

 

 

 

 

 

 

 

 

 

 

 

SHS POST
AS NOTED

PROVIDE BITUMOUS PAINT
100mm EITHER SIDE OF
TOP OF PAD FOOTING

 

 

 

HW COLUMN
AS NOTED

50x 5 MS STIRRUP -
PRYDA PSQ OR SIMILAR
FIX TO COLUMN WITH
2-M12 HDG BOLTS

 

 

 

 

 

 

 

| 75mm CLEARANCE
- = 7 7 F * - — q AT DOD DOT
SAAR SAY) RD RT RIG WASARDAY KS R TRIE
“YS 4 ’ i
Cc
£2) Ns fs
=| Es z 8 1 |
&} 88 100 x 100 x 8 THICK a] 2
ao] Se BASE PLATE FULLY a ! \
< o WELDED TO POST < | \ 1-N12 BAR HOOKED
E € i OVER STIRRUP
Q _l Lt Q
3 COLD JOINT 8 ' \
2-512 LOOPED BARS
CAST INTO FIRST POUR
FOUND FOOTING FOUND FOOTING
AS SPECIFIED 3500 AS SPECIFIED 3508

PAD FOOTING DETAIL PS

 

N

WARNS)

450 min
jembeddm

 

600 min

 

 

 

 

SHS POST
AS NOTED

PROVIDE BITUMOUS PAINT
100mm EITHER SIDE OF
TOP OF PAD FOOTING

4500

CORT RI PRI

 

 

BELLED OUT
TO 550

 

 

 

 

PAD FOOTING DETAIL P6

 

SOAS

 

 

 

100 x 100 x 8 THICK
BASE PLATE FULLY
WELDED TO POST

FOUND FOOTING
AS SPECIFIED

PAD FOOTING DETAIL
(for shallow rock)

SL82 SLABMESH. 40 BTM COVER 1 4
—< 100
o VAPOUR BARRIER I
Fae | a iritazoo TONCC/AS2870
350

 

 

 

EDGE BEAM DETAIL

FOR TENDER/APPROVAL 02.03.2022

 

 

Engineering & Building Investigation Services -,
Unit 1/4 Textile Ave, Warana PO Box 973 Buddina 4575 | EH BIS

T: (07} 5436 9199 F: (07) 5436 9198 E: [email protected]

 

 

Proposed New Residence

at Lot 21 (No. 16) Pines Road, Cooroy

Client: C & H Fraser

FOOTING & SLAB DETAILS

Drawing No. A3-210417-FD3

 

Scale: 1:20

 

February 2022

 

Drawn: SLS

Checkedy Fad

 

 

Page 19

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N12"L" BAR TOP & BTM
LAP WITH CAGE WIRES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OVER LAP CAGES KX RR K
FULL WIDTH 500 LAP
t sn
5 a
=$ abs / — — _ _ oe = | — — COMPACTED a
sc \ — _ | | Soe ee Se EARTH FILE 5
8 Se aiitities 9
2
N12"L" BAR TOP & BTM | PS a
LAP WITH CAGE WIRES 9
—— fae ~ :
| | NATURAL
| | SOIL PROFILE
4 FOUND PIERS Lt L_ p——!
width AS SPECIFIED s—
as noted —
2000 MAXIMUM CENTRES 2000 MAXIMUM CENTRES
| I |
TYPICAL FOOTING
INTERSECTION DETAIL FOOTING PIER DETAILS
FOR TENDER/APPROVAL 02.03.2022

 

Engineering & Building Investigation Services -
Unit 1/4 Textile Ave, Warand PO Box 973 Buddina 4575 | EBIS

T: (07) 5436 9199 F: (07) 5436 9198 E: [email protected]

 

 

Proposed New Residence
at Lot 21 (No. 16) Pines Road, Cooroy

FOOTING & SLAB DETAILS Drawing No. A3-210417-FD4

 

 

Client: C & H Fraser

 

Scale: 1:20 February 2022 | Drawn: SLS

Checked Ca, Jf

 

 

Page 20

 

 

 

LAGGING THICKNESS

+

100

”

  
    
 
        

ze 4
ina * SERVICE
5 a PIPE
Ee lad Ee 3
T CLEARANCE TO
REINFORCEMENT

~ CLASS S, M= 25mm FIG WIDTH

- CLASS H, E, P= 40mm

SERVICE PENETRATION LOCATION NOTES:
-MAINTAIN SPECIFIED FOOTING DEPTH, SLAB DEPTH
AND REINFORCEMENT COVER AT ALL TIMES.

-WHERE SERVICE PIPES INTERFERE WITH FOOTING
DEPTH OR REINFORCEMENT COVER, THE FOOTING
MUST BE DEEPENED AND MINIMUM REINFORCEMENT
COVER MAINTAINED

-CUTTING OR BENDING THE REINFORCEMENT TO GO
AROUND OR OVER THE PIPE MUST NOT BE PERMITTED

SERVICE PENETRATION LOCATION

SERVICE PIPE
& LAGGING

REINFORCEMENT SPECIFICATIONS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

fa

 

 

 

>

x {
Pr rT

7

I jl qT

bod \—8 :

Rael
50 50

MIN.

50

MIN.

 

FTG DEPT!

 

 

 

MIN

 

MIN.

FTG WIDTH

REINFORCEMENT / STEEL LAP NOTES:

TRENCH MESH

STEEL BARS

CORNER BARS
SLAB FABRIC

<9 fee a ly

200 x 200
SQUARES

- 500mm IN A STRAIGHT LINE OR

TO THE FAR FACE AT "T” AND "L" INTERSECTIONS
-"N" BARS - 35 TIMES THE BAR DIAMETER

N12 - 420 LONG

N16 - 560 LONG

- REQUIRED AT ALL "T" AND "L” INTERSECTIONS

- ONE FULL PANEL OF FABRIC, SO AS THE TWO
OUTER-MOST TRANSVERSE WIRES OF EACH SHEET
ARE OVERLAPPED

REFER TO DETAIL

ee
200 x 100 EDGE
SQUARE

SLAB FABRIC LAP DETAIL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

— i oz =
szi ——\ — f
wey 1000 1000
LAP EXTRA LAYER
OF MESH WITH
LOCAL DEEPENING — iMESH Wit | - sxerG verry
2-N12"Z" BARS
&
48
STEP IS > 200 AND oO
900 MIN. LAP < 2x FIG DEPTH ic
STEP IS < 200 x 2-N12 "Z" BARS
z-— tr I Te |
a i &
Q
: [_ 1
3 __ E
AL SLOPE < 1:10
STEPPED FOOTING DETAIL 1 STEPPED FOOTING DETAIL 2
FOR TENDER/APPROVAL 02.03.2022
Engineering & Building Investigation Services - Proposed New Reson od Cooroy FOOTING & SLAB DETAILS Drawing No. A3-210417-FD5
Unit til WwW PO Box 973 Buddina 4575 . '
Wo 555999 8 [0] Sue o19S Erccnet com cy BIS) [227.8% Scale: nis February 2022 [ brawnsis Checker a

 

 

 

Page 21

                                                                                                                              61
                                                                                                                              aug
                                                                                                                               2008
Technical note




                 Articulated Walling

                 Articulated
                 walling
                 PREFACE                                                deal only with angular distortions in walls due
                 In 1984 the Cement & Concrete Association of           to the response of a footing system to ground
                 Australia (now Cement Concrete & Aggregates            deformations. Other movements in masonry walls
                 Australia) published Construction Note 9 Articulated   are deemed to be accommodated by other types
                 Walling (CN9). It was replaced in 1991 by Technical    of control joints. This document nevertheless
                 Note 61 (TN61) under the same title. This first        recognises that it is often appropriate for articulation
                 edition of TN61 was a referenced document in           joints to be multi-purpose, ie to function as
                 AS 2870.1 – 1988 Residential Slabs and Footings –      expansion and/or contraction joints in addition to
                 Part 1: Construction.                                  their primary function.
                     A second edition of TN61 published in 1998
                 took into account the provisions of a replacement      1       SCOPE
                 Standard, ie AS 2870 – 1996 Residential Slabs and      This Technical Note deals with the articulation of
                 Footings – Construction. It remains a referenced       masonry walls, both internal and external, built on a
                 document in that Standard. It is also a referenced     concrete slab-on-ground or strip footing. The details
                 document in the Building Code of Australia (BCA),      included also provide guidance for the articulation
                 Volume 2 Housing Provisions.                           of masonry walls with other footing systems on
                     This third edition of TN61 also takes into         reactive soils, eg pier-and-beam footings.
                 account the requirements of all relevant Australian        The joint spacings and details given are intended
                 standards including the draft of the yet-to-be-        for masonry (brick and block) walls constructed of
                 published AS 4773 Construction Practices for           materials such as clay, concrete, calcium silicate or
                 Masonry in Small Buildings. The definition of          stone. Autoclaved aerated concrete (AAC) masonry
                 articulation joints used in this Standard has been     walls are not covered in this document. While the
                 adopted, ie as a subset of ‘Control Joints’ they       principles still apply, the joint spacing will need to
                                                                        be appropriate for the increased stiffness of the
                                                                        AAC wall system.

Page 22

                      Likewise, the principles apply in mine subsidence    movement. Measures intended to provide more
                  areas (particularly in areas where long-wall mining      consistent foundation conditions include:
                  methods are used) as the ground movements are            ■ Draining surface water away from the building to
                  similar to those encountered on reactive clay soils.        prevent ponding adjacent to footings.
                  However, items such as the required joint width and      ■ Providing ‘apron’ paths around perimeter walls
                  spacing will need to be calculated to confirm that          to better control and provide more consistent
                  the details contained herein are appropriate for the        moisture levels within the soil adjacent to the
                  expected ground movement.                                   footings.
                      While articulation joints normally apply to          ■ Avoiding large trees or thick shrubbery nearby
                  masonry walls, framed walls (referred to as clad            that locally draw moisture from the soil and
                  frame in AS 28701) which are more flexible than             cause uneven and often large soil movements.
                  masonry walls may also benefit from articulation.        ■ Providing flexible drainage connections to
                  The location and spacing of articulation joints for         prevent water leakage near footings.
                  clad frame walls are similar to those recommended
                  for masonry walls.                                          These and other practical measures are
                      While every individual situation where an            outlined in Foundation Maintenance and Footing
                  articulation joint is required can not be covered        Performance: A Homeowner’s Guide3.
                  because of the variety of wall and window/door
                  opening combinations, this document provides             3        FOUNDATION AND BUILDING MOVEMENT
                  guidelines for the location and detailing of             The foundation is the ground that supports the
                  articulation joints.                                     building and the footing is the construction
                                                                           (concrete slab, strip, pad or piers) which transfers
                  2         INTRODUCTION                                   the load from the building to the foundation.
                  Masonry walls – whether built of bricks or blocks,            Footings may be designed to either restrict
                  made of fired clay, concrete or sand/lime – are          or accommodate movements that occur in the
                  rigid and brittle. They can thus tolerate only minor     foundation soil. For small buildings constructed on
                  footing movement without cracking and/or causing         soils that shrink or swell (reactive sites) it is usually
                  windows and doors to become jammed.                      uneconomical to attempt to design a rigid footing
                       Unpainted masonry walls incorporating cement/       system to avoid transmission of any significant
                  lime mortar are the most tolerant of movement,           movement to the superstructure. It is better to
                  and any cracking in the mortar joints tends to be        design the footing system to allow a limited amount
                  inconspicuous. In rendered and/or painted walls,         of movement, and a superstructure that can tolerate
                  cracking may be visually unacceptable, even though       that movement.
                  structural performance is unimpaired.                         Generally, the more reactive the soil is the more
                      The solution is to provide footings that are rigid   rigid the footings need to be in order to ensure the
                  enough or to articulate the walls; the latter will       acceptable performance of the structure above.
                  usually be the more economical solution as more          If brittle elements such as masonry walls which
                  flexible footings can be used. Articulation involves     are susceptible to cracking due to movement are
                  dividing the walls into panels separated by vertical     articulated, the risk of cracking will be minimised,
                  joints that allow movement and thus reduce the risk      and less-rigid footings than those needed for
                  of cracking.                                             non‑articulated buildings will be adequate.
                       Footing movement is typically caused by                  Deemed-to-comply or standard footing systems
                  swelling and shrinking of the foundation material.       for soils of varying reactivity are detailed in AS 2870.
                  Thus the risk of movement depends on the extent          Apart from full masonry on Class H sites, for which
                  to which the foundation soil reacts to changes           articulation is mandatory, options are given for
                  in moisture content. AS 2870 classifies sites in         either articulated or non-articulated masonry
                  accordance with the soil’s reactivity in a range from    construction for various site classes. On stable sites
                  Class A (stable) to Class E (extremely reactive). The    (Class A) and slightly reactive sites (Class S) no
                  Building Code of Australia (BCA)2 requires that          concession in footing size is allowed for articulated
                  houses on all sites other than Class A and Class S       masonry veneer walling. On Class S sites there is a
                  (slightly reactive) incorporate articulated walls.       concession for articulated full masonry. Note that
                       It is important to note that articulation of the    the acceptable construction provisions of the BCA
                  walls of a building does not replace the need to         require articulation on all site classes other than
                  adopt other measures which are essential when            Class A and S.
                  building on reactive-soil sites to further reduce the
                  risk of cracking to masonry walls from foundation


Page 2 Articulated Walling

Page 23

                                                                                Joint width INCREASES at top of wall




    More flexible wall types such as clad frame
walls with timber or metal studs will also benefit
from articulation to reduce the risk of surface
distress and window and door jamming due to
                                                                                Joint width as constructed
foundation movement.
    The construction of a building on a reactive         DOMING CAUSED BY SWELLING OF REACTIVE SOILS
soil site typically causes changes in the moisture
content of the soil under the building relative to the                          Joint width DECREASES at top of wall
surrounding soil. After the construction of slab-
on-ground footings the soil beneath the slab will
generally have a higher moisture content than the
surrounding soil, causing reactive soils to swell
and form a mound. Strip footings with suspended
flooring systems, which provide ventilation under
the floor, generally cause the soil beneath the
floor to dry causing reactive soils to shrink and
form a dish. Seasonal weather changes (ie dry and                               Joint width as constructed
wet periods) will cause reactive soils around the        DISHING CAUSED BY SHRINKAGE OF REACTIVE SOILS
exposed edges of the building to also either swell
or shrink. This may increase the mounding (dry           Figure 1 Effect of ground movement on footings and
periods) or even cause dishing of slab-on-ground         articulated walls
footings if the moisture increase around the edges
is more than that under the slab (wet periods)
Figure 1.
    The differences in the soil movement cause
the greatest problems. Doming and dishing of the
foundation soil and footings – although it may be          Articulation joint
only a few millimetres – causes distortion in the          may commence
walls. Articulation is designed to accommodate             above DPC if
                                                           close to footing
such movement by dividing walls into smaller
panels that can move independently of each other,          Damp-proof
thereby minimising the risk of cracking in the walls.      course (DPC)
    Doming and dishing of the footings means that
articulated wall panels need to be able to move
in their own plane, with the articulation joints
opening and closing in response to the foundation
movement. The articulation joint width and details
(eg sliding or vertical expansion joint ties) should
allow for this movement. Note that the foundation
movement associated with reactive soils generally
occurs over long periods (say 12 to 18 months) due       Figure 2 Articulation joint above damp-proof course
to the relative impermeability of the clay materials
that typically cause the swelling and shrinkage
movements. Thus joints will tend to open or close
seasonally with prolonged wet or dry conditions,
rather than over short periods.
    It should also be noted that the greatest opening
or closing occurs at the top of an articulation joint,
with little or no movement at the bottom (ie at the
top of the footing). For this reason, provided that
some hairline cracks in the wall just above the
footing is acceptable (usually concealed within the
mortar joints), articulation joints may start above
the level of the damp-proof course Figure 2. This
has the advantage of providing less interference to
the installation of damp-proof courses and termite


                                                                                                   Articulated Walling Page 3

Page 24

                   barrier systems within the masonry walling or            requiring minor repair work such as repointing.
                   cavity. For situations where the damp-proof course       Note that these fine cracks usually occur in the
                   is more than say 400 mm above the footing or the         mortar joints where they often go unnoticed.
                   risk of cracking in this area must be minimised, it      Damage in categories 3 and 4 will generally
                   is recommended that the articulation joint should        require more substantial repairs.
                   extend down to the footing and allowance be made             Thus while articulation allows a more flexible
                   for movement in any built-in components such as          and therefore economical footing system for a
                   termite barriers.                                        particular walling type and soil reactivity, the
                       Ideally, the wall layout for the building should     expected performance levels of the standard
                   follow a basically straight grid pattern so the          designs having articulated walling follows the same
                   beams of a raft slab can follow the wall pattern         philosophy outlined above regarding acceptable
                   economically and simplify the division of the wall       crack widths, ie the majority of articulated walls
                   into independent panels by articulation joints.          on footing systems complying with AS 2870 will
                       The roof construction (framed, trussed or            perform satisfactorily, some will display fine cracks
                   beam‑and-rafter) should include adequate bracing         and a few will have noticeable cracking.
                   to prevent spreading of the roof framing and hence           Articulation may therefore be used in two ways
                   the tops of walls being pushed out which could           for any given walling type: it may be used to reduce
                   cause cracking of internal walls that are located        the required footing size, or, by maintaining the
                   adjacent to the eaves.                                   footing size required for the non-articulated case,
                                                                            to further reduce the risk of walls cracking and
                   4        FOOTINGS FOR ARTICULATED WALLS                  windows and doors jamming. The latter approach is
                   One of the benefits of articulated walling is the        recommended for walls containing arches, and for
                   reduction in the size and ultimate cost of footings      buildings with rendered or painted finishes where
                   required for a building with masonry walls on            any cracking that may occur is more noticeable.
                   reactive soils. Because an articulated structure has         If one of the standard footing designs in AS 2870
                   sufficient flexibility to move in harmony with the       (which ensure compatibility between footing design
                   footings without developing unacceptable cracks,         and tolerable movement for the type of walling
                   the footing can be designed to be less rigid than        system) is not used, the designer should consider
                   would be required for a non-articulated masonry          the following points when determining the allowable
                   superstructure.                                          deflection of the footings:
                       Regarding the ‘acceptability’ of cracking,           ■ Materials and construction of internal and
                   AS 2870 includes guidance on this by classifying the         external walls
                   damage that may occur to walls. Adoption of the          ■ Surface finish of internal and external walls
                   deemed-to-comply or standard footing designs in          ■ The number of articulation joints and their
                   AS 2870 should ensure that the majority of damage            location
                   to walls falls into damage category 0 (either no         ■ Length and plan arrangement of walls
                   cracking or hairline cracks less than about 0.1 mm       ■ The inclusion of damage-prone elements such
                   in width), some may fall into category 1 (fine cracks        as masonry arches.
                   less than about 1 mm in width which do not need
                   repair) and a few may fall into category 2 (noticeable       Suggested maximum limits for the deflection
                   cracks less than about 5 mm in width that can be         for the design of footings and rafts for various types
                   easily filled). Damage categories 3 and 4 include        of construction given in AS 2870 are reproduced in
                   cracking from 5 mm to 15 mm and 15 to 25 mm              Table 1. The limit adopted for a particular design
                   respectively with doors and windows jamming and,         will depend on the form of construction and take
                   in the worst cases, possibly distorting. Damage          account of factors such as the distance between
                   within these categories seldom occurs, and when          articulation joints, number of storeys, first-floor
                   it does, is usually the result of some specific site     construction materials, wall surface finish, and
                   problem. The range of categories acknowledges            whether or not the masonry is reinforced. The
                   that standard footing designs on typical sites of a      design limit for deflection should be nominated
                   particular soil classification (Class A, S, M and H)     by an experienced engineer. Note that for
                   will generally perform satisfactorily, but that soil     non‑articulated, full-masonry construction, a
                   conditions are variable. Thus, in some instances the     deflection of the footing of around 5 mm over a
                   soil and therefore footing movements will be greater.    10-m span may cause cracking.
                       The Guide to Standards and Tolerances4                   Should more than one form of construction be
                   produced by various State Government Authorities,        used in a building, it is possible to design footings
                   refers to a category 2 crack as being a defect           with different limits of deflection in separate parts


Page 4 Articulated Walling

Page 25

                                                                  of the building. AS 2870 simplifies this issue by
                                                                  equating different external and internal wall types to
                                                                  an ‘equivalent’ type of construction which may then
                                                                  be used for the entire footing system, thus allowing
                                                                  standard details to be used throughout.

                                                                  5        SPACING OF ARTICULATION JOINTS
                                                                  If footings appropriate for articulated masonry have
                                                                  been selected from the standard designs within
                                                                  AS 2870, then the recommended maximum spacing
                                                                  of articulation joints in straight, continuous masonry
                                                                  walls having no openings should be in accordance
                                                                  with Table 2. If walls have openings larger than
                                                                  900 x 900 mm, the maximum joint spacing should
                                                                  be 5.0 m.
                                                                       The spacing from corners or ends of walls
                                                                  should be in the range of 2 m to 4.5 m for all
                                                                  finishes and masonry wall types. Control joints less
                                                                  than 2 m from the corner or end of a wall may be
                                                                  necessary for other reasons. However, they should
                                                                  not be regarded as effective articulation joints
                                                                  Figure 3. For single-storey construction, if there are
                                                                  windows present near corners or ends of walls then
Figure 3 Control joints less than 2 m from the                    the articulation joint should generally be located
corner do not function as articulation joints                     near or at the furthest side of the window from the
                                                                  corner or end of wall Figure 4.




                              ≤ 4.5 m                      ≤ 5.0 m                  ≤ 4.5 m
                            from corner             (openings > 900 x 900)        from corner




 ≤ 4.5 m
 from corner
                          Lounge                       Bed room                  Bed room            ≤ 4.5 m
                          room                                                                       from corner




≤ 6.0 m
(no openings)             Dinning         Kitchen      Laundry        Bath            Bed room       ≤ 4.5 m
                          room                                                                       from corner




 ≤ 4.5 m                  Family room
 from corner
                                                                               ≤ 4.5 m
                                                                             from corner
                                                                                                    Articulation joints


Figure 4 Typical location of articulation joints for brick veneer building
on Class M site with face finished masonry




                                                                                                     Articulated Walling Page 5

Page 26

                  Table 1 Maximum design differential movement, ∆, for design of footings and rafts (from AS 2870)

                                                    Absolute maximum deflection, ∆
                                                    as a function of span, L                 Absolute maximum deflection, ∆
                  Type of construction              (mm)                                     (mm)

                   Clad frame                       L/300                                   40
                   Articulated masonry veneer       L/400                                   30
                   Masonry veneer                   L/600                                   20
                   Articulated full masonry         L/800                                   15
                   Full masonry                     L/2000                                  10

                   Notes: ‘L’ is the footing or slab length in the design direction.
                         'Special provisions for the Design of Residential Slabs and Footings for South Australian Conditions' 5
                          relates the maximum deflection to joint spacing.




                  Table 2 Maximum spacing of articulation joints for unreinforced masonry walls (after AS 4773 Parts 1 and 2  6)

                                                                              Joint spacing (m) for wall height/joint widths

                                                                                                  4 m to 8.5 m high
                   Site        Masonry wall construction and                  Up to 4 m high
                   class1      surface finish                                 for 10-mm joints    For 10-mm joints 15-mm joints

                   A and S		                                                  Articulation not required2

                   M, M–D      External face finish masonry                       6.0                 4.2               6.0
                               External rendered and/or painted masonry           5.5                 3.9               5.5
                               Internal face finish or sheeted masonry            6.0                 4.2               6.0
                               Internal rendered and/or painted masonry           5.5                 3.9               5.5

                   H, H–D3     External face finish masonry                     5.0–5.5             3.5–3.9           5.0–5.5
                               External rendered and/or painted masonry         4.5–5.0             3.2–3.5           4.5–5.0
                               Internal face finish or sheeted masonry          5.0–5.5             3.5–3.9           5.0–5.5
                               Internal rendered and/or painted masonry         4.5–5.0             3.2–3.5           4.5–5.0

                   E           Refer Note 4

                  Notes:
                  1 As defined in AS 2870
                  2 Use maximum spacing for expansion or contraction joints.
                  3 For H–D sites use the shorter spacing within the range.
                  4 The location of articulation joints for Class E sites should be determined from engineering principles.




Page 6 Articulated Walling

Page 27

               If length greater than
               spacing in Table 2,
               provide articulation joints




               Open articulation             Sealed articulation
               joint between masonry         joint between single-
               fence and house               and two-storey wall




Figure 5 Articulation joints at changes of wall height




     For footings designed by an engineer, the                           the opening thereby reducing the loads that the
 maximum spacing of joints will depend on the                            lintel must support. If the articulation joint is in
 maximum deflection adopted in the design. If the                        line with the edge of the opening (Figure 8 (b)
 joint spacing exceeds four times the average wall                       and Figure12), lintel sizes selected from
 height or 12 m, the walls should be considered                          standard design tables should be checked for
 as non-articulated and the maximum deflection                           adequacy as masonry can no longer be assumed
 for this case should be selected on the basis of                        to arch over the opening.
 non‑articulated masonry construction5. Also,                        ■   Changes in wall thickness Figure 14. Note that
‘sections of walls without openings may be                               engaged piers are not considered to be a change
 considered as fully articulated if the distance                         in thickness.
 between joints is not more than twice the average                   ■   Junctions of walls built of different masonry
 height, nor 6 m.’ This is in agreement with the                         materials (clay, concrete, calcium silicate or
 maximum 6-m spacing adopted in Table 2.                                 stone) Figure 14;
     For Class E (extremely reactive) sites, the                     ■   Joints between masonry walls and structural
 footings should be designed in accordance with                          reinforced concrete or steel elements;
 engineering principles, with the joint spacing                      ■   Deep chases or rebates for service pipes
 depending on the maximum deflection adopted.                            Figure 15. Note that chases deeper than 25%
 Note that deemed-to-comply or standard footing                          of the leaf thickness should be regarded as a
 designs are not provided for Class E sites in AS 2870.                  change in thickness.
                                                                     ■   At offsets in walls. Note that the internal corner
6       LOCATION OF ARTICULATION JOINTS                                  is an inconspicuous location for a joint Figure 16.
In addition to locations determined by the maximum                   ■   At changes in plan geometry where differences
spacing, articulation joints should also be located                      in movement may occur, eg where the family
at positions where concentrations or variations in                       room shown in Figure 4 is connected to the
the potential development of stress may occur, for                       remainder (and basic rectangular shape) of the
example:                                                                 house.
■ Where the height of the wall changes abruptly by
    more than 20% of its lesser height eg changes of                     For other than brick veneer walls (which are
    storey height Figure 5.                                          attached to a structural/supporting framework),
■ Control or construction joints in slab-on-ground                   articulation joints should be located either at or
    or strip footings.                                               within 300 mm of wall junctions or engaged piers
■ Window and door openings Figures 6 to 9. For                       that serve as lateral supports. Note that their
    two-storey buildings, positioning openings to                    positioning should not interfere with the required
    allow easier location of articulation joints is                  lateral support Figure 17.
    desirable Figure 8. Note that most lintel design
    methods assume arching of the masonry over

                                                                                                         Articulated Walling Page 7

Page 28

                                                                                                                                    If > 1800 mm wide,
                                                                                                                                    consider providing
                                                                                                                                    articulation joints
                                                                                                                                    both sides of window




                                             Articulation joint
                             ≤ 4.5 m                                Articulation joint
                             from corner   Spacing                  If masonry extends
                                           from Table 2 or          over openings, see
                   (a)                     to suit footing design   Figures 9 or 11                             Clad frame
                                                                                                                infill panel




                                                                                                               Articulation joint


                                                                                             Maximum spacing       Spacing, see Section 5
                                                                                              from Table 2


                                                                                         Figure 7 Articulation joints at window openings
                                                                                         with infill panel between




                   (b)




                    (c)


                   Figure 6 Articulation joints at window/door openings
                   (a) Maximum spacing
                   (b) Face-finished wall with sealant to match
                       mortar colour
                   (c) Face-finished wall with sealant to match
                       brick colour

Page 8 Articulated Walling

Page 29

                                             If > 1800 mm wide,
                                             consider providing
                                             articulation joints
                                             both sides of window


                                                                                                             If > 1800 mm wide,
                                                                                                             consider providing
                                                                                                             articulation joints
                                                                                                             both sides of window
                        Figure 11                                                                                   Articulation joint



                                                                                            Joint extends
                        Figure 10                                                           through window
                        Alternative                                                         sill
                        Figures 12,13




                                                                                      Figure 10
                        Articulation joint                                            Alternative
                                                                                      Figures 12,13

      Maximum spacing       Spacing, see Section 5
       from Table 2
(a)

                                                                                                           Articulation joint


                                                                            Spacing, see Section 5         Maximum spacing
                                                                    (a)                                     from Table 2


                                                                                                             If > 1800 mm wide,
                                                                                                             consider providing
                                                                                                             articulation joints
                                                                                                             both sides of window

                                                                                                                    Articulation joint




(b)


Figure 8 Articulation joint at window openings with                                                  Min. 600
masonry between
                                                                               Spacing, see Section 5            Maximum spacing
(a) Offsetting joint may simplify detail at lintel                                                                from Table 2
                                                                    (b)
(b) Positioning of openings to line up may simplify
    location of joints and reduce visual impact                     Figure 9 Articulation joints at window openings
                                                                    that are offset
                                                                    (a) Joint adjacent to lower opening
                                                                    (b) Joint adjacent to higher opening




                                                                                                                Articulated Walling Page 9

Page 30

                                                                                                                          Compressible material at end of lintel to allow
                                                                                                                          movement (width to match articulation joint)
                                                                                                                                                     Articulation joint


                   Articulation joint




                                                                                               Slip joint above and below
                                                                                               steel lintel (eg, two layers                          Steel lintel with
                   Slip joint below steel lintel                                               of DPC) Provide sealant                               vertical leg
                   (eg, two layers of DPC)                                                     along front of lintel                                 in cavity
                                                                        Steel lintel with
                                                                        vertical leg
                                                                        in cavity                                                                    Window/door frame

                                                                        Window/door frame                                                            Articulation joint

                                                                                               Figure 12 Alternative if articulation joint can not be
                                                                        Articulation joint     offset to end of steel lintel

                  Figure 10 Articulation joint offset to end of
                  steel (or other) lintel over opening (this detail is
                  recommended where possible to ensure arching
                                                                                               Expansion material                       Slip joint (eg, two layers of DPC
                  of masonry over opening)                                                     at end of steel lintel                   or compressible material used
                                                                                               (width to match                          in articulation joint)
                                                                                               articulation joint)
                                                                                                                                                     Articulation joint


                   Slip joint (eg, two layers of
                   DPC or compressible material
                   used in articulation joint)
                                                                          Articulation joint

                                                                          Window frame
                                                                          Window sill



                                                                                               Slip joint below steel lintel
                                                                                               (eg, two layers of DPC)
                                                                                                                                                     Steel lintel with
                                                                                                                                                     vertical leg
                                                                                                                                                     in cavity

                                                                                                                                                     Window/door frame

                                                                                                                                                     Articulation joint

                                                                                               Figure 13 Alternative if articulation joint can not
                                                                                               be offset to end of steel lintel (similar detail is
                                                   Articulation joint                          appropriate for prestressed concrete or clay lintels)

                  Figure 11 Articulation joint offset at window sill




Page 10 Articulated Walling

Page 31

               Clay brickwork              Concrete or sand/lime brickwork                       Concrete blockwork




                                Articulation joint                                   Articulation joint

Figure 14 Articulation joints at changes of wall thickness/material


       Elastomeric sealant       Render terminated in render       7         DETAILING OF ARTICULATION JOINTS
                                 starter or expansion joint trim   7.1       External Walls
                                                                   To maintain the bonding pattern at vertical
                                                                   articulation joints (recommended), half-length
                  d*
                                                                   bricks or blocks should be used at joint locations in
                                                                   masonry walls. The option of toothing masonry at
 D       Service run in chase
         (eg, insulated          Compressible filler               joints is generally not recommended because of the
         hot-water pipe)                                           difficulty of ensuring the required gap is achieved.
                                 Elastomeric sealant               (Note that AS 3700 does not allow toothing unless
                                                                   it is specifically considered in the design). Further,
 * If depth of chase > 0.25D
                                                                   as most sealants perform better in tension and
     an articulation joint is    Articulation joint
     required                                                      compression (at the vertical joint) than in shear
                                                                   (at the horizontal part of a toothed joint), suitable
Figure 15 Articulation joints at deep chases                       joint details must be specified if toothing is being
                                                                   considered.
                                                                        If the walls are rendered or coated, the same
                                                                   movement capacity available in the articulation joint
                                                                   should be provided in these finishes. Render can
                                                                   be stopped either side of the joint by using a starter
                                                                   trim or possibly an expansion-joint trim. Simply
     Articulation joint                                            forming a groove in the render at the joint location
                                                                   is not recommended Figure 18 (a). Bagged finishes
                                                                   and other types of thin coatings should also be kept
                                                                   flush with the edges of the joint. The painting of
                                                                   these types of finishes (including the sealant) will
                                                                   make joints less conspicuous Figure 18 (b).
                                                                        Articulation joints must be free of mortar and
                                                                   may be packed with a compressible filler such as
                                                                   polystyrene or a closed-cell polyethylene foam to
                                                                   ensure a continuous gap and provide a backing for
                                                                   an elastomeric sealant to be gunned into the joint
                                                                   Figure 19. Note that semi-rigid foams, bitumen-
                                                                   impregnated fibre board (eg jointex) or cork are not
                                                                   suitable as permanent joint fillers because of their
                                                                   limited compressibility. Alternatively, a temporary
                                                                   filler may be used to keep the joint clean and true;
                                                                   when removed, a permanent backer rod is forced
                                                                   into the joint to provide a backing for the sealant
                                                                   Figure 20. Note that the joint must be clean and free
                                                                   of any materials (eg mortar) that would prevent or
Figure 16 Articulation joint at offset in wall                     restrict closing of the joint.




                                                                                                          Articulated Walling Page 11

Page 32

                                         Return wall                             Return wall required                   300
                                         required for                            for lateral restraint                  max.
                                         lateral restraint




                                      Articulation joint
                                      with sliding ties                   Articulation joint             Articulation joint
                              INCORRECT 7                         CORRECT 3                                                   CORRECT 3

                  Figure 17 Location of articulation joints to maintain stability


                  7.1.1 Minimum Width                                          Sealants should be applied towards the end of
                  The minimum width of articulation joints should              the construction after any initial movement has
                  take into consideration the height of the wall and           occurred.
                  the expected movement, especially if the joint is to             For clay bricks which tend to grow, sealants
                  serve the dual function of articulation and expansion        must allow for long-term, permanent compression;
                  or contraction. Table 2 gives suitable joint spacings        for concrete or calcium silicate bricks and blocks
                  for both 10- and 15-mm-wide joints for walls up to           which tend to shrink, the sealants must allow for
                  8.5 m high.                                                  long-term tension.
                      The joint widths in Table 2 will also                        The geometry of the sealant is important to
                  accommodate some expansion or contraction of                 ensure that the material is able to comply with the
                  the masonry wall panels. Designers and builders              stated performance. If the depth of the sealant is
                  should, however, consider whether there is potential         too great it will act more like a rigid ‘block’ than a
                  for greater movement than can be accommodated                thin elastic member and will not be able to extend/
                  by a 10- or 15-mm joint width, eg in mine                    contract properly. Generally, the depth of sealant
                  subsidence areas. Where the control joint functions          should not be more than the joint width for joints up
                  both as an articulation joint and an expansion               to 12 mm in width, and no more than half the joint
                  joint, either the overall width of the joint should          width for wider joints. The joint filler or a backer
                  be increased to 0.7 times the sum of the required            rod, are typically used to provide the correct joint
                  widths for each separate function, or the joint              geometry. The manufacturer’s recommendations
                  spacing should be reduced for the 10- or 15-mm-              should be followed for each specific material.
                  wide joints.                                                 Note that sealants may need to be replaced every
                                                                               10 to 15 years (depending on type and exposure
                  7.1.2 Joint Sealants                                         condition) as part of building maintenance.
                  Sealant materials typically include silicones and                Where articulation joints occur at the ends of
                  polyurethanes. For painted finishes, either a                lintels (ie at the sides of window/door openings)
                  specialist silicone sealant that can be painted, or          and movement of the lintel along the bed joint
                  more commonly, a polyurethane sealant should be              is expected, this joint may also be sealed as the
                  used. Polysulphide materials (able to be painted)            movement will typically cause cracking and loss of
                  are also available but as they are two-component             the mortar from the joint Figure 22.
                  products, they are not commonly used. Sealants                   If the wall of a Class 1 building (house) is located
                  should have a minimum extensibility of 50%                   closer than 900 mm to a property boundary (other
                  (ie ±25%) and be suitable for the clay or concrete           than a boundary adjoining a road or other public
                  masonry walling material used. Some sealants may             space), the BCA requires a fire resistance level
                  require priming of the joint to promote bonding to           (FRL) of not less than 60/60/60. However, the BCA
                  the substrate. Sealants are gunned into the joint            states that small openings in the masonry such
                  and are available in a variety of colours, either to         as sub‑floor vents, weepholes and control joints
                  match the masonry or mortar colour to assist in              (including articulation joints) do not need to be fire
                  reducing the visual impact of the joint. It is also          rated. For fire separating walls of attached Class 1
                  possible to dust the surface of freshly applied              buildings and other building types, the use of a
                  sealant with crushed mortar, thereby giving it a             fire‑rated sealant in articulation joints should be
                  texture and colour that closely matches the mortar           provided. For such buildings, the sealant may also
                  joints in the surrounding brickwork. Note that               need to provide acoustic performance.
                  sealants and/or filler materials should be recessed
                  back from the outside face to prevent the sealant
                  being squeezed out of the joint if the maximum
                  expected compression of the joint occurs Figure 21.


Page 12 Articulated Walling

Page 33

                                                           Elastomeric sealant

                                                           Compressible foam or
                                                           polystyrene filler built
                                                           in by bricklayer




                                                         Figure 19 Typical articulation joint detail for
                                                         external masonry wall

(a)

                                                           Masonry expansion                    Gap formed by
                                                           (sliding/extendable) tie             temporary filler



                                    Articulation joint


                                                                                                 Backer rod*
                                                                                                 Elastomeric sealant
                                                                                 10
                                                                                                   * Open-cell polyurethane or
                                                                                                     closed-cell polyethylene
                                                                                         10          to ensure proper sealant
                                                                                      minimum        dimensions

                                                         Figure 20 Alternative articulation joint detail for
                                                         external masonry wall




(b)


Figure 18 Joints should be continuous through
applied finishes
(a) Joints should be continuous through applied
    finishes such as render, not just scored in the
    surface as shown
(b) Joints/sealants may be painted to reduce their
    visual impact




                                                         Figure 21 Joint filler/sealant squeezed out of joint
                                                         as a result of not having been recessed


                                                                                                    Articulated Walling Page 13

Page 34

                                                                           7.1.3 Wall Ties
                       Face of lintel may                                  To provide support for wall panels at articulation
                       be sealed
                                                                           joints, the BCA requires wall ties to be provided
                                                                           on each side of the joint and spaced horizontally
                                                                           no more than 300 mm from the joint. The vertical
                                                                           spacing of wall ties at articulation joints must also
                                                                           be halved, effectively doubling the number of ties
                                                                           at these locations. In order to suit brick or block
                                                                           courses, the vertical spacing could vary from 200 to
                                                                           400 mm but should average the required 300-mm
                                                                           spacing (ie half of the normal 600-mm vertical
                                                                           spacing).
                                                                               For cavity and unreinforced single-leaf masonry
                                                                           walls, lateral support across the joint (to carry
                                                                           horizontal loads and to maintain alignment) should
                                                                           be provided. To achieve this, and also to allow the
                                                                           joint to open and close, masonry expansion (sliding/
                  Figure 22 Bed joint along lintel may also require        extendable) ties are used Figure 23. The strength,
                  sealing at articulation joints                           number and spacing of ties should be sufficient to
                                                                           transfer the calculated loads across the joint. As a




                                                      Articulation joint                                        Articulation joint




                  Figure 23 Examples of masonry expansion (sliding/extendable) ties




Page 14 Articulated Walling

Page 35

guide, for brick masonry, ties should be provided            7.1.4 Termite Barriers
every fourth course and for block masonry, every             Articulation joints do not prevent the installation
second course, ie at 400-mm centres. If a filler strip       of effective termite barrier systems within the
is used it should extend around the sliding ties. For        masonry wall or cavity since each barrier system
masonry having hollow cores, adequate embedment              has specific details for this situation. Note that any
of the ties will generally require the grouting of any       termite barriers that cross articulation joints must
cores containing the larger sliding ties.                    be able to accommodate the expected movement.
    For masonry veneer (brick or block) and
reinforced single-leaf (block) masonry walls, sliding        7.2       Windows and External Doors
ties may also be provided, but are generally not             In residential buildings articulation joints should be
required as the masonry on either side of the joint is       combined with window or external door openings
held in place by either a structural frame (typically        wherever possible, as these typically form points
timber) or reinforced and grouted cores which                of weakness within the masonry wall, at which
provide the required support to the masonry.                 the risk of cracking is increased. The continuous
                                                             vertical articulation joint, running from footing (or
                                                             damp-proof course) to roof, can be provided on the
                                                             line of the window or door jamb. These locations
                                                             also assist to reduce the visual impact of the joint
                                                             as it is possible to conceal much of the joint behind
                                                             architraves and cover mouldings, particularly with
                                                             full-height windows and doors.
                                                                  For windows or doors up to 1.8 m wide, and with
                                                             the maximum joint spacings from Section 5, an
                                                             articulation joint is generally required on only one
                                                             side of the window or door. For larger windows and
                                                             doors, articulation joints at both sides of the opening
                                                             should be considered Figure 24. Note that if one
                       Articulation                          side is less than 2 m from a corner, an articulation
≤ 4.5 m                      joints
                                                             joint on the side closest to the corner will be of little
from corner but if
≤ 2.0 m, joint will    More                                  benefit Figure 3.
be of little benefit   than 1800                                  It is essential that a gap is left between the
                                                             window or door frame and masonry to ensure that
Figure 24 Articulation joints should be considered           movement is possible. One method of achieving this
at both sides of wide window/door openings                   in cavity/solid masonry while still providing secure
                                                             fixing of the frame to the walling, is to use column
                                                             expansion ties fixed to the widow or door frame



Note:
Various tie types
available                                            Masonry expansion tie                 Architrave conceals joint on inside
                                                     screwed to window frame
                                                                                                          Window/door frame




                                                                                                Cover moulding conceals
                                                                                                articulation joint on outside


                                                                                     Gap




Figure 25 Fixing of window/door frames at articulation joints


                                                                                                     Articulated Walling Page 15

Page 36

                                                                              Articulation joint
                                                                                                                 Increased risk
                                                                                                   1200 min.     of zig-zag cracking if
                                                                                                   recommended   width between openings
                                                                                                                 is less than 1200 mm




                   (a)




                   (b)


                  Figure 26 Articulation joints should be continuous     Figure 27 Articulation joint between openings
                  (a) Joint should be continuous alongside window sill
                  (b) Joint is continuous alongside window sill but
                      required gap between masonry and window
                      frame has not been provided




Page 16 Articulated Walling

Page 37

and built into the masonry wall Figure 25. The
practice of building masonry (including sills) hard
against window or door frames at the location of an
articulation joint is not recommended Figure 26.
     Full-height windows, or windows with infill
panels below the sill, eliminate the need to form
an articulation joint in the masonry. Instead the
architrave and external cover strip conceals the
full-height gap of the articulation joint between the
window or door and wall Figure 25.
     Masonry is not recommended above window
or door heads when building on reactive soil sites.       Eaves lining above external
                                                          wall and window/door heads
For this reason the openings shown in Figure 24
and Figure 27 extend to the top wall plate or eaves       External masonry wall
lining. If the window or door itself cannot be taken to   stops under eaves lining
this height, then an infill panel should be provided.
Beams over windows or doors supporting a top              Figure 28 Boxed or (horizontal) soffit-lined eaves
plate and spanning between articulated wall panels
should be free to move on the masonry walls on
both sides. Where masonry can not be avoided
above openings, and for two-storey walls, refer           External wall supports roof structure
to Section 6 for joint and lintel details that allow
movement at joint locations.                              Eaves support framing, fixed to roof
                                                          framing and not masonry wall
     Articulation joints should not be located in
narrow masonry panels between two window                  Alternative raked
                                                          eaves lining
or door openings as zig-zag cracking at the
sill level may develop. A sufficiently wide
panel of masonry should be provided between
openings to reduce the risk of cracking
Figure 27 (1200 mm minimum is recommended
by the Brick Industry Association, USA8).

7.3      Wall/Eaves Junctions
                                                          Horizontal eaves lining
The amount of movement, which must be
accommodated in articulation joints under doming          Optional cover moulding fixed
                                                          to supporting timber for
action, increases from zero at the bottom of the
                                                          horizontal eaves or rafter/
joint to a maximum at the top. It is therefore            top plate for raked eaves
advantageous to keep wall heights as low as
possible. For this reason, the use of boxed or            Figure 29 Eaves detail – roof supported on external
soffit‑lined eaves is recommended for buildings           leaf of masonry wall
having articulation joints. Eaves may be finished
by resting the eaves lining on top of the external
masonry walls. At window and door openings a
simple framing of timbers hung from the roof
structure supports the eaves lining Figure 28.
    Where the external leaf of a masonry wall is
used to support the roof structure, or where a
single-leaf masonry wall is used, then raked or
flush eaves provide a good detail for an articulated
building. There are two methods of detailing raked
eaves – with exposed rafters, or by lining under the
rafters. Either way, the cover moulding between
eaves and the wall should be attached to the top
plate or rafters, thereby allowing the masonry
to move independently and articulation joints to
function properly Figure 29.


                                                                                                  Articulated Walling Page 17

Page 38

                                                                         Infill panel




                                                                                                   7.4      Gable Ends
                                                                      Articulation joint located
                                                                                                   When gable roofs are used it is recommended that
                                                                      away from mid-point of       the masonry in the gable end wall be terminated
                         Maximum spacing from Table 2                 gable, where maximum         just above the eaves height, and framed construction
                                                                      movement occurs
                   (a)
                                                                                                   used above that level to limit the height of masonry.
                                                                                                       If the masonry does extend full height, it is
                                                                                                   preferable to avoid locating an articulation joint at
                                                                                                   the mid-point where there is maximum joint length
                                                                                                   and consequently maximum movement in the joint
                                                                                                   at the top. It is always preferable to locate the joint
                                                                                                   elsewhere in order to minimise its length Figure 30.
                                                                                                       Because of potential differential movement
                                                                                                   between the wall panels and the roof structure, the
                                                                                                   roof tiles should not be bedded onto the top of the
                                                                                                   gable-end wall. When articulated walls are used,
                                                                                                   the joint between the roof and walls should also
                                                                                                   allow the masonry walls to move independently.
                                                                                                   This may be done by finishing a tiled roof-edge with
                                                                                                   a timber or metal barge.

                                                                                                   7.5     Internal Partition Walls
                                                                                                   The majority of foundation movement generally
                                                                                                   occurs around the perimeter of a building where
                                                                                                   the soil is subject to seasonal moisture variations.
                                                                                                   Problems with cracking of brittle internal wall types
                                                                                                   (ie masonry walls) therefore typically occur at or
                                                                                                   near the junctions with external walls.
                                                                                                        With careful planning, internal walls need not
                                                                                                   require articulation joints other than at openings
                                                                                                   such as doorways or in corners of rooms. Where an
                   (b)
                                                                                                   articulation joint is unavoidable in long, unbroken
                                                                                                   runs of wall, it should be the same width and
                  Figure 30 Articulated masonry gable-end wall                                     formed in the same way as an external-wall joint.
                  (a) Location of articulation joint                                               Where possible, articulation joints should be located
                  (b) Use of infill panels above openings                                          in the corners of rooms or at doorways where they
                                                                                                   will be less obvious. Note that joints at corners
                                                                                                   should be located to maintain stability Figure 17.
                   Articulation joint        Articulation joint          Articulation joint            The abutting wall panels should be connected
                                                                         (If arch bar used, see
                                                  Infill                 Figures 10 and 12         across the articulation joint with masonry expansion
                                                  panel                  for details)              (sliding/extendable) ties of sufficient strength,
                                                                                                   number and spacing to transfer the calculated loads
                                                                                                   across the joint. As a guide, a minimum of three
                                                                                                   sliding ties should be installed.
                                                                                                        When internal masonry walls are to be rendered,
                                                                                                   a neat joint should be formed in the render over the
                                                                                                   articulation joint. It is advisable to fill this joint with
                                                                                                   an elastomeric sealant, which may be coloured or
                                                                                                   painted to match the wall finish.
                                                                                                        Sealants for internal articulation joints should
                                                                                                   be paintable such as polyurethane compounds.
                         Full-height              Standard-height           Standard-height        They may be applied to masonry, timber, metals
                         door and                 door and                  door and
                         full-height frame        full-height frame         standard metal frame   or plasterboard. They are available in a range of
                                                                                                   colours or may be painted to match surrounding
                  Figure 31 Options for installing door openings (and                              colours to reduce the visual impact of the joint.
                  articulation joints) in internal walls                                           The manufacturer’s recommendations regarding
                                                                                                   suitable paints should be followed.


Page 18 Articulated Walling

Page 39

                  Cornice fixed to roof framing only
                  Cornice
                  allowingfixed to roofofframing
                           movement              only
                                           masonry wall
                  allowing movement of masonry wall




                                                                                     7.6      Internal Doors
                                                                                     It is convenient to make most internal-wall
                                                                                     articulation joints coincide with door openings. An
                                                                                     effective joint can be made by making openings full
                                                                                     height from floor to ceiling. Normally, an articulation
                                                                                     joint will be provided on only one side of a door.
                                                                                          There are three ways of installing a door in a wall
                                                                                     Figure 31:
                                                                                     ■ Full-height door and frame with or without a
                                                                                          head
   (a) PERIMETER WALL WITH FRAMED OR TRUSSED ROOF                                    ■ Full-height door frame with an infill panel fixed
   (a) (Internal
        PERIMETERwall WALL   WITH roof
                      with framed FRAMED    ORdetail)
                                       similar  TRUSSED ROOF
       (Internal wall with framed roof similar detail)                                    above a standard-height door
                                                                                     ■ A standard-height door with masonry above
                                                                                          separated from adjacent walling by articulation
   Bottom chord of roof truss
   Bottom chord of roof truss                                                             joints either offset (Figure 10), or more
                                                                                          commonly, in line with the jambs (Figure 12).
                                                                                          To accommodate the movement at the
   Gap sufficient                                                                    articulation joint, the architrave on a timber door
   Gap
   to    sufficient
      allow  for                                                                     frame should be fixed only to the frame and be large
   to allow for
   expected   movement                               Cornice fixed to roof
   expected movement                                 Cornice
                                                     truss onlyfixed  to roof
                                                                  allowing           enough to cover the articulation joint. Metal door
                                                     truss only allowing
                                                     movement     of                 frames should have allowance for a gap where the
                                                     movement
                                                     masonry wall of
                                                     masonry wall
                                                                                     brickwork is built into the edge of the frame. When
                                                                                     internal masonry walls incorporating metal door
                                                                                     frames are to be rendered, a neat joint should be
   (b) INTERNAL WALL WITH TRUSSED ROOF                                               formed between the render and metal door frame
   (b) INTERNAL WALL WITH TRUSSED ROOF                                               which can be sealed and painted over.
Figure 32 Fixing of cornice at articulated
masonry walls


                                           Keep distance between articulation joints to a minimum (5 m maximum)


                                                                      Provide bed-joint
                                         Articulation joint           reinforcement over arch             Articulation joint

Arch depth
(300 mm
minimum)
                                                                                                                                              Arch
Arch rise                                                                               Potential                                             height
(0.25 x span                                                                            crack at
minimum)                                                                                crown of arch
                                                                                        (weakest point)


                                                                                                  Spring
                                                                                                  line




* Buttress width designed to resist
  horizontal force from arch and
  overturning                          Buttress width*                          Arch span


Figure 33 Detailing of arches (semicircular arch shown)


                                                                                                                               Articulated Walling Page 19

Page 40

                      The use of full-height door frames provides an           unreinforced masonry arch with the addition
                  opportunity to run electrical cable for light switches       of bed-joint reinforcement intended only to
                  or power points down from the ceiling between the            hold closed any crack(s) that may occur (see
                  wall and frame by increasing the gap between the             Section 9).
                  two. Note that any services installed in the gap must    ■   Locate articulation joints as close as possible
                  not inhibit closing of the joint.                            to the arch (ie at the sides of the buttresses)
                                                                               to limit the differential movement that could
                  7.7      Wall/Ceiling Junctions                              occur across the arch. The minimum width of
                  Masonry interior walls of a building with a framed           each buttress should be sufficient to resist the
                  roof require top plates to support ceiling joists.           horizontal force from the arch and overturning.
                  The ceiling lining is then fixed under the joists and        If detailed calculations are not carried out, the
                  butted to the top plate. The cornice may be timber or        width of the buttress should be no less than the
                  quarter-round plaster and should be fixed through            height of the arch.
                  the ceiling lining to the ceiling joists and/or to the   ■   Provide a steel lintel to support the arch. The
                  top plate, not to the walling. As there may be some          lintel can be curved to suit the shape of the
                  movement between the wall and the ceiling, the               arch with flat sections welded to each end for
                  cornice must be large enough to conceal the top              building into the buttresses. In this case the
                  plate and be free to move independently of the wall          lintel will be designed to carry the entire weight
                  Figure 32.                                                   above the arch and articulation joints may be
                      If a trussed roof is used, there is no need for a        located adjacent to the arch in a similar manner
                  top plate on internal masonry non-load-bearing               to other openings. Although not recommended
                  walls since the ceiling joists (bottom chords of the         aesthetically, articulation joints may be located
                  trusses) should not rest on internal walls.                  at the arch crown.
                      A gap of at least 10 mm (AS 16849) should be left    ■   Ensure that the footings supporting arches are
                  between the bottom chord of the trusses (or ceiling          continuous so as to avoid having the two sides of
                  battens when used) and the top of the wall where a           the arch supported on separate footings.
                  trussed roof is used – after the roofing and ceiling     ■   Provide a stiffer footing system under masonry
                  are fixed. This gap, plus an allowance for movement          walls containing arches. If the differential
                  must be covered with a timber or plaster cornice             movement of footings due to ground movement
                  fixed only to the ceiling, allowing the wall/truss to        is limited to the point where articulated walling
                  move up and down and the wall to move in its own             is not required, the risk of cracking in arches
                  plane without causing cracking Figure 32 (b).                will be significantly reduced. For slab-on-
                                                                               ground footings, only those edge/internal beams
                  8        Masonry Walls with Arches                           supporting masonry with arches will need to be
                  Many different types of arches can be built into             stiffened.
                  masonry walls. Unlike other openings in walls, all       ■   Maintain the area around footings to ensure
                  arched openings require a minimum arch depth                 consistent moisture conditions in the soil
                  (300 mm) or narrow band of masonry above the                 and thus reduce the potential for differential
                  crown. Arches are particularly susceptible to                movements (shrinkage and swelling) of reactive
                  cracking from footing movement. Such cracking                soils. For more information refer to Section 2.
                  occurs because any footing movement will cause
                  a concentration of stresses at the crown or highest      9       REINFORCED MASONRY
                  point in the arched section of masonry. Cracking         While the use of articulation is normally confined
                  could be severe enough to destroy the structural         to unreinforced cavity and veneer construction, it is
                  effectiveness of the arch. Unlike normal openings,       also relevant for reinforced brick masonry.
                  articulation joints can not generally be located             More-flexible footings may be used where
                  adjacent to the arched opening because sufficient        articulated masonry containing correctly detailed
                  masonry must be provided at each side of the             and positioned reinforcement is used. The footings
                  opening to support (ie buttress) the arch. For           should be designed in accordance with engineering
                  these reasons arched openings are generally not          principles, with the additional crack-control
                  recommended for buildings on reactive-soil sites.        provided by the reinforcement in the wall permitting
                      If arches are required, some options which may       a more generous maximum deflection to be adopted
                  be considered include:                                   for the footing design Table 3.
                  ■ Reinforce the arch depth (Figure 33) to ensure             According to AS 4773 articulation joints are
                      structural performance in the event of a             not required for reinforced masonry designed in
                      crack. The arch may still be designed as an          accordance with Part 1 Section 12. For information


Page 20 Articulated Walling

Page 41

Table 3 Suggested deflection ratios for reinforced masonry

                                      Absolute maximum deflection, ∆
                                      as a function of span, L             Absolute maximum deflection, ∆
Wall construction                     (mm)                                 (mm)

Reinforced masonry veneer             L/300                                40

Reinforced full masonry
   Sheet and/or faced finish          L/400                                30
   Rendered or painted finish         L/600                                20




on reinforced block walls refer to the Concrete          as doors and windows. However, small openings
Masonry Handbook10.                                      for air conditioners, toilet windows and the like are
     Reinforced masonry may also include reinforced      permissible provided that they do not interfere with
brick masonry containing bed joint reinforcement         the courses that contain the reinforcement.
and/or reinforced cavities within the brickwork.             Also, if more-flexible footings are used, the
Cavities may either be the cavities between two          recommended maximum spacing of articulation
leaves of brickwork or those within brick piers.         joints in reinforced brick masonry remains
The standard footing design in AS 2870 for a             similar to unreinforced masonry and should not
stiffened slab with deep edge beam is an example         exceed the values given in Table 2. The maximum
of reinforced brick masonry where a minimum              recommended spacing for expansion joints in
75-mm-wide cavity is reinforced with SL82 mesh           straight reinforced brick masonry walls without
or N12 bars at 400-mm centres each way and then          openings is 30 m11 , although they may be required
grout or concrete filled.                                to be as close as 10 m depending on conditions.
     Unlike reinforcing bars and meshes used                 Reinforced brick masonry used for structural
for structural applications, the lighter bed joint       applications (similar to unreinforced masonry) is
reinforcement (for brick or block walls) is usually      generally designed to span horizontally between
incorporated to assist with crack control in wall        vertical or lateral supports such as columns and
panels between articulation joints, and especially       cross/return walls. As such, if articulation joints are
around openings and above arches. In high-wind           required, they should be located at these points and
areas it may also be used to improve the structural      detailed such that loads can be transferred to the
performance of wall panels.                              supporting elements Figure 17. This does not apply
     Bed joint reinforcement typically consists          to masonry veneer construction as lateral support
of two 3-mm (minimum) diameter longitudinal              is provided by the structural framing to which it is
wires (galvanised or stainless steel depending on        attached.
durability requirements) welded into a cage for              The vertical spacing of reinforced bed joints
easier installation and more accurate positioning.       depends on the design requirements and openings
It typically comes in 3-m lengths and a range of         within the wall. If bed joint reinforcement is used for
standard widths to suit various masonry units. The       improved crack control between joints (articulation
maximum wire size should not exceed two thirds of        or other control joints), an appropriate location may
the design bed joint thickness and at least 15 mm of     be in the two courses above and below window/door
cover should be provided between embedded metal          openings and in the second or third course from the
wires and any exposed surface of the mortar joint.       bottom and top of the wall Figure 34. Where there
Light gauge wire products may also be used but           are no openings in the wall panel, reinforcement
will be less effective, may not be appropriate for the   would typically be provided at 600-mm centres. An
exposure conditions and as a consequence, result in      alternative arrangement in 2.4-m-high masonry
corrosion problems.                                      block walls is to reinforce the top and bottom
     Dwellings using bed-joint reinforcement to          3 courses and the middle course of the wall in lieu
reduce footing sizes should be designed such             of distributing reinforcement evenly over the height
that openings do not interfere with the reinforced       of the wall12. Concentrating the reinforcement
courses. In general, this will mean that most            at the extremities of the wall improves the wall’s
sections of reinforced brick masonry (being full-        resistance to in‑plane bending from footing
height infill sections) will not contain openings such   movements.


                                                                                            Articulated Walling Page 21

Page 42

                                                                                   Articulation joint                  Articulation joint
                      The reinforcement should be lapped by a
                  minimum of 400 mm. One way of achieving this is
                  to butt the ends of standards lengths together and
                  provide an 800-mm length of the 3-mm-diameter
                  wire(s) or other bed joint reinforcement as a lapping
                  length. Ideally, laps should be staggered such that
                  they are not in line. If reinforcement is provided
                  only above and below window/door openings (to
                  minimise/control cracking at these vulnerable
                  locations) the reinforcement should extend about                                                 Extend
                  600 mm past the openings.                                               Bed-joint                reinforcement 600 mm
                                                                                          reinforcement            minimum past openings
                      The majority of buildings may be designed,
                  detailed and articulated to minimise the risk of          Figure 34 Typical location of bed-joint reinforcement
                  cracking in the walls. However, some wall panels
                  containing openings (especially arches) may
                  benefit from the addition of reinforcement to limit
                  the number of articulation joints and/or minimise         Dowel bars, with cap at one end, threaded through compressible
                  the risk of cracking at vulnerable points between         filler and placed in bond beam at articulation joint.
                                                                            Bars must be horizontal and parallel
                  articulation joints.

                  9.1      Bond Beams                                       Bars in reinforced concrete
                  In general terms, bond beams refer to the horizontal      bond beam stopped
                                                                            at articulation joint
                  reinforced and grouted beams that are found in
                  reinforced masonry block walls. They are formed
                  by using either special lintel or ‘U’ shaped blocks or
                  knock-out bond beam blocks and they are typically
                  used to provide beams along the tops of walls to
                  distribute wind loads or as lintels over window and
                  door openings.
                      Both AS 3700 and AS 4773.2 do not allow control
                  joints (including articulation joints) to continue
                  through bond beams which rely on continuity for
                  their structural performance, ie those described in
                  the Standards. Whether joints may be continuous
                  through bond beams will depend on the loads
                  being carried, the design of the bond beam and
                  the location and detailing of the joint. Two separate
                  cases need to be considered, bond beams at the
                  tops of walls and those forming lintels over window
                  and door openings.
                                                                                                                         Articulation joint with
                      At tops of walls. Bond beams around the tops                                                       gunned-in elastomeric
                  of masonry block walls are required in high-wind                                                       sealant
                  areas, particularly in the north of Australia. They are
                  provided mainly to distribute wind uplift loads from      Figure 35 Articulation joints through masonry block
                  the roof members to regularly spaced vertically           bond beam at top of wall
                  reinforced cores which resist the uplift forces. For
                  this reason it is essential that they be continuous
                  around the perimeter walls of the building. They
                  may also transfer some horizontal wind loads back
                  to walls providing lateral support.
                      An articulation joint through a bond beam is
                  formed by stopping the reinforcing bars within the
                  bond beam 50 mm from each side of the joint. The
                  articulation joint is then bridged with short, plain
                  round steel bars (dowels), equal in diameter and
                  number to the reinforcing bars in the bond beam.


Page 22 Articulated Walling

Page 43

Dowel bars are cast into the concrete on one side       10        ARTICULATED WALLING – KEY POINTS
of the joint with the other end allowed to slide/       ■    Reactive soils swell and shrink with moisture
move by wrapping and greasing this half of the               variation causing a doming or dishing of footing
bar, coating it with an approved bond-breaking               systems and possible distortion of both external
compound or providing an appropriate sleeve within           and internal walls of domestic-scale buildings.
which the bar can slide. The sliding ends of dowel      ■    Articulation greatly limits cracking or distortion
bars should have purpose-made plastic caps at the            of walling and jamming of windows and doors
ends or plugs of polystyrene equal to the joint width        caused by foundation movement.
taped at the end to enable the articulation joint to    ■    Articulated walling reduces the size and
close. Articulation joints bridged by dowels should          cost of footings for buildings on reactive-soil
be finished with a filler strip and sealant where            sites. These benefits are most significant for
they are visible Figure 35. Note that the steel bars         masonry‑walled buildings.
crossing the joint should be suitably protected from    ■    Although articulation is most effective
corrosion. Typically, galvanised bars are used. In           for masonry walling, it is also a benefit for
coastal locations the use of stainless steel dowel           frameclad-walls.
bars may be required.                                   ■    Articulation increases the allowable deflection
    As bond beams will typically have either 12-mm           for the footings thus giving the engineer more
or 16-mm-diameter dowel bars (ie bond beams are              latitude to design a more economical footing.
typically reinforced with N12 and N16 bars), a length   ■    Articulation joints should be positioned and
of 600 mm should be sufficient for dowel bars.               detailed with care to allow the building fabric to
    Joints in bond beams must be considered in the           flex in harmony with the footing movement.
design of the structural system. They should be         ■    Wallheight should be minimised in order to
located at returns/intersecting walls such that the          limit the extent of movement that must be
joint in the bond beam does not result in instability        accommodated in an articulation joint.
of the wall or limit the ability of the bond beam       ■    Bond beams should be carefully detailed where
to transfer horizontal loads to lateral supports             crossed by articulation joints.
Figure 17. In order to transfer wind uplift loads, a    ■    Arches in buildings on reactive-soil sites will
vertically reinforced and grouted core should be             require additional precautions as outlined in
provided on both sides of the joint, similar to the          Section 8.
requirement for window and door openings.               ■    The addition of appropriate bed-joint
    Above window and door openings. Bond beams               reinforcement may significantly strengthen
above openings act as lintels to support the loads           a wall, reduces cracking and permits
above.                                                       more‑economical footings to be used.
    Joints should be designed, located and detailed
in such a way that the effectiveness of the bond        11     REFERENCES
beam to support loads is not affected. However,         1 AS 2870 Residential slabs and footings –
articulation joints should be moved away from the          Construction Standards Australia, 1996.
sides of openings to allow continuity of the bond       2 Building Code of Australia, Volume 2, Housing
beams and comply with AS 3700 requirements. The            Provisions Australian Building Codes Board,
reinforced bond beams will mean that there is less         2007.
risk of cracking at openings than would otherwise       3 Foundation Maintenance and Footing
be the case.                                               Performance: A Homeowner’s Guide, CSIRO
    Alternatively, if joints away from window and          Publishing Building technology File 18, 2003.
door openings are not acceptable, then more rigid          Available for purchase at www.publish.csiro.au.
footings should be provided.                            4 Government Guide to Standards and Tolerances
                                                           Victorian Building Commission, Office of Fair
                                                           Trading NSW, Tasmanian Government and ACT,
                                                           2007
                                                        5 Special Provisions for the Design of Residential
                                                           Slabs and Footings for South Australian
                                                           Conditions The Footings Group, The Institution of
                                                           Engineers Australia, Adelaide, 1 March 1994.
                                                        6 AS 4773 Masonry in small buildings, Part 1 –
                                                           Design, and Part 2 – Construction, (to be
                                                           published).




                                                                                            Articulated Walling Page 23

Page 44

61
aug
2008
                   7  AS 3700 Masonry structures, Standards               CCAA OFFICES
                      Australia, 2001                                     SYDNEY OFFICE:
                   8 Accommodating Expansion of Brickwork,                Level 6, 504 Pacific Highway
                                                                          St Leonards NSW Australia 2065
                      Technical Note 18A, Brick Industry Association,     POSTAL ADDRESS:
                      Reston, Virginia, USA 2006 (www.gobrick.com).       Locked Bag 2010
                                                                          St Leonards NSW 1590
                   9 AS 1684, Residential timber-framed
                                                                          TELEPHONE: (61 2) 9437 9711
                      construction, Standards Australia, 2006.            FACSIMILE: (61 2) 9437 9470
                   10 Concrete Masonry Walling, Concrete Masonry          BRISBANE OFFICE:
                      Handbook, MA 45 Concrete Masonry Association        Level 14, IBM Building
                      of Australia, April 2007.                           348 Edward Street
                                                                          Brisbane QLD 4000
                   11 Four Inch Reinforced Brick Masonry (RBM)            TELEPHONE: (61 7) 3831 3288
                      Curtain and Panel Walls, Technical Note 17L,        FACSIMILE: (61 7) 3839 6005

                      Brick Industry Association, Reston, Virginia, USA   MELBOURNE OFFICE:
                      2006 (www.gobrick.com).                             2nd Floor, 1 Hobson Street
                                                                          South Yarra VIC 3141
                   12 Symons MG, Amey DJ and Johnston RK,                 TELEPHONE: (61 3) 9825 0200
                      In‑Plane Bending of Single-Leaf Block Walls,        FACSIMILE: (61 3) 9825 0222

                      Pacific Concrete Conference, New Zealand,           PERTH OFFICE:
                      November 1988.                                      45 Ventnor Avenue
                                                                          West Perth WA 6005
                                                                          TELEPHONE: (61 8) 9389 4452
                   12       Bibliography                                  FACSIMILE: (61 8) 9389 4451

                    ■   The Full Brick Manual, CBPI Manual 3, Clay        ADELAIDE OFFICE:
                        Brick and Paver Institute (now Think Brick        Greenhill Executive Suites
                                                                          213 Greenhill Road
                        Australia), September 1996.                       Eastwood SA 5063
                    ■   Design of Clay Masonry for Serviceability, CBPI   POSTAL ADDRESS:
                                                                          PO Box 229
                        Manual 7, Clay Brick and Paver Institute (now     Fullarton SA 5063
                        Think Brick Australia), October 2001.             TELEPHONE: (61 8) 8274 3758
                                                                          FACSIMILE: (61 8) 8373 7210
                    ■   Detailing of Clay Masonry Walls, CBPI Manual 9,
                                                                          EXTRACTIVE INDUSTRIES OFFICE
                        Clay Brick and Paver Institute (now Think Brick   PO Box 243
                        Australia), May 2000.                             Henley Beach SA 5022
                                                                          TELEPHONE: (61 8) 8243 2505
                                                                          FACSIMILE: (61 8) 8125 5822

                                                                          TASMANIAN OFFICE:
                   Acknowledgement
                                                                          PO Box 246
                   The contributions of Emeritus Professor Adrian Page    Sheffield TAS 7306
                   and Messrs Leigh Appleyard, Max Granger,               TELEPHONE: (61 3) 6491 2529
                                                                          FACSIMILE: (61 3) 6491 2529
                   Rod Johnston and Nigel Beal in reviewing this
                                                                          WEBSITE: www.concrete.net.au
                   document are gratefully acknowledged.
                                                                          EMAIL: [email protected]

                                                                          Layout: Helen Rix Design

                                                                          Disclaimer: Cement Concrete & Aggregates
                                                                          Australia is a not for profit organisation sponsored
                                                                          by the cement, concrete and aggregate industries
                                                                          in Australia to provide information on the many
                                                                          uses of cement, concrete and aggregates. This
                                                                          publication is produced by CCAA for that purpose.
                                                                          Since the information provided is intended for
                                                                          general guidance only and in no way replaces the
                                                                          services of professional consultants on particular
                                                                          projects, no legal liability can be accepted by CCAA
                                                                          for its use.

                                                                          CCAA respects your privacy. Your details have
                                                                          been collected to provide you with information on
                                                                          our activities, publications and services. From time
                                                                          to time your details may be made available to third
                                                                          party organisations who comply with the Privacy
                                                                          Act such as affiliated associations, sponsors of
                                                                          events and other reputable organisations whose
                                                                          services we think you may find of interest. If you do
                                                                          not wish to receive information from CCAA or wish
                                                                          to be taken off the database please write to the
                                                                          Privacy Officer, CCAA, Locked Bag 2010,
                                                                          St Leonards, NSW, 1590




 Page 24 Articulated Walling

Page 45

 

 

gos annow?

 

 

 

 

 

San
FT

 

 

 

 

 

 

GROUND SLOPE

 

 

 

 

 

 

GROUND OUTSIDE BUILDING

SURFACE TO DRAIN AWAY FROM HOUSE.
TYPICALLY:

1 IN 20 TO FIRST METER FROM BUILDING EDGE AND
1 IN 50 THEREAFTER

 

GROUND SLOPE

 

 

 

   

 

 

 

1000
1 IN 20 1 IN 50
ee oe

 

 

SPOON DRAIN 1 IN 100 MIN. FALL

NOTES:

1. IT IS EXTREMELY IMPORTANT TO MAINTAIN GOOD DRAINAGE THROUGHOUT CONSTRUCTION OF ANY BUILDING.

2. FALL AWAY FROM THE BUILDING SHALL BE 1 IN 20 TO FIRST METER FROM BUILDING EDGE AND 1 IN 50 THEREAFTER,
AS SHOWN SO THAT WATER DOES NOT POND AGAINST OR NEAR THE BUILDING.

3. ALL WATER RUN-OFF SHALL BE DIRECTED AWAY FROM THE BUILDING AT ALL TIMES PRE AND POST CONSTRUCTION.
4. FOR FLAT SITES, AN ENGINEER SHOULD BE CONSULTED TO ENSURE THAT THE FINISHED HEIGHT OF THE BUILDING
ALLOWS PROPER DRAINAGE AWAY FROM THE BUILDING.

5. DRAINAGE MUST NOT DIRECT WATER TO ADJACENT BLOCKS IN A CONCENTRATED STREAM.

Engineering & Building Investigation Services —
Unit 2/4 Textile Ave, Warana

SITE DRAINAGE DIAGRAMS
PO Box 973 Buddina 4575 :
Phone 07 54369199 Fax 07 54369198 EBIS Drawing No.: DD1

 

 

 

 

 

 

 

Page 46

                                     BOREHOLE LOG EXPLANATORY NOTES

INTRODUCTION                                                Boreholes are terminated for two reasons.
EBIS Engineering has provided these notes to aid in
the understanding of this geotechnical report and to        1. UTP – Unable to Penetrate. When there is refusal
define the terms and symbols used in our borehole           for the hand auger and it cannot penetrate any
logs.                                                       further due to rock, rock fragments, gravel or hard
Some of these notes may not be relevant to all              clay.
reports.
                                                            2. The soil type is consistent and able to support
SOILS                                                       building foundations. Industry standards generally
Soils exhibit a variety of characteristics which can        recognise two (2) metres as ‘typical’ depth to
change across a site and alter over time.                   termination of boreholes without a limiting layer
Geotechnical      engineering      involves    collecting   (eg rock) for ‘typical’ dwellings.
constrained facts about these soil characteristics in
order to recognize and predict the behaviour of the         FIELD TESTING
soil on a particular site under certain conditions.         There are two main tests which we perform on the
                                                            site.
Description and classification methods for soils and
rocks used in this report are based on the Australian       1. DCP – Dynamic Cone Penetrometer. A rod is
Standard AS1726-1993 and include properties such            driven into the ground using a falling weight
as major soil or rock type, minor soil or rock type,        hammer and the number of drops that it takes the
inclusions, colour, structure, strength, density and        hammer to drive the rod in 100mm increments into
plasticity.                                                 the ground is recorded. Higher numbers indicate
                                                            more stable soils.
SAMPLES TAKEN
Two types of samples can be taken.                          2. PP – Pocket Penetrometer. This is a hand-held
                                                            instrument which is used to measure shear strength
1. D – Disturbed Sample. These samples are taken            and indicates unconfined compressive strength. A
during drilling and provide information on grain size,      number over 100 is acceptable but higher numbers
plasticity,   colour,  moisture    content,    minor        indicate more stable soils.
constituents and sometimes strength and structure.          CLASSIFICATION
2. U50 – Undisturbed Sample. These samples are              Soils are generally divided into two main categories
usually only taken from cohesive soils and are              according to their cohesiveness. After cohesiveness,
performed by pressing a tube with a thin wall and           they are separated by the dominant size of the
50mm diameter into the soil and pulling it out with a       particles in the soil. This is shown on the table on the
section of the soil in a fairly intact state. Strength,     following page.
structure,    volume     change       potential    and      FILL
compressibility are some of the tests which can be          Fill relates to any soil or other material which has
performed using this sample.                                been placed on top of the natural soil. It is sometimes
BOREHOLES                                                   recognised by the inclusion of foreign materials, such
There are several methods for digging through the           as organic matter, metal or bricks, or through
soil to find the constituents that make up the soil type    unusual colour, texture or compaction which varies
in that location. Generally most soil testing by EBIS is    considerably from the natural soil profile.
done by hand auger as this process has the least            The variation in material type, degree of compaction
impact on the location of the testing. Occasionally         and strength of fill materials can differ from the
when necessary, other methods such as drilling with         natural soil and, in some instances where it is
a powered auger, truck mounted drill rig or                 uncontrolled, this leads to a greater possibility of
excavation using a backhoe or excavator may be              unfavourable engineering properties and deficiencies
used.                                                       in performance and possible complications for
                                                            building on the site. The performance of the fill as a
It must be recognised that boreholes represent the          foundation material is dependent upon the depth of
soil conditions in a very small sample of the overall       the fill and the degree of compaction.
subsurface situation and as such the soil profile may
vary across the site. If the soil conditions do appear      Fill can be:
different from those indicated in this report, EBIS         UC – Uncompacted
should be contacted to confirm the requirements.            VC –Variably Compacted
                                                            WC – Well Compacted

Page 47

 PLASTICITY

 Plasticity is defined by the Liquid Limit of the sample.      Code        Term                Liquid Limit Range (%)
 As such, this term relates only to cohesive soils. Liquid      CL         Low Plasticity      <35
 Limit (LL) is the water content where a soil changes            CI        Medium Plasticity   ≥35 ≤50
 from plastic to liquid in behaviour.                           CH         High Plasticity     >50

 Liquid Limit is measured as a percentage.

 MOISTURE
 This refers to the moisture content of the soil at the time of testing.

 Code      Term            Cohesive Soils                                                  Non-Cohesive Soils
   DR      Dry             Hard, Powdery, Friable                                          Free-flowing, Very Loose
  MO       Moist           Smooth
   DA      Damp            Can be moulded,                                                 Cool, dark, Tends to cohere
  VDA      Very Damp       Sticky
  WE       Wet             Weakened. Free water forms on hands when holding                Cool, dark, Tends to cohere


 CONSISTENCY / DENSITY
 Cohesive soils have consistency.
 Non-Cohesive Soils have relative density.
 Consistency – Cohesive Soils                                                       Density – Non-Cohesive Soils
 Code      Term        Description                                                  Code     Term               Index
    H      Hard        Thumb nail indents with difficulty                            VD      Very Dense         >85
   VSt     Very Stiff  Thumb nail can indent                                          D      Dense              ≥65 ≤85
    St     Stiff       Indented by thumb. Cannot be moulded by hand                  MD      Moderately Dense ≥35 ≤65
    F      Firm        Moulded by strong finger pressure                               L     Loose              ≥15 ≤35
    S      Soft        Moulded by light finger pressure                               LL     Very Loose         <15
   VS      Very Soft   Easily squeezed, sloppy


 ROCK MATERIAL
 Rock Material has Strength and can be Weathered.

 STRENGTH                                                       WEATHERING
Code    Term          Description                             Code Term                        Description
        Extremely     May break after many blows when              Fresh Rock                  No          staining        or
EX                                                             FR
        High          hit with pick. Ringing sound.                                            decomposition
        Very High     Breaks after more than one blow                  Slightly   Weathered    Slightly    discoloured    but
VH                    when hit with pick.         Ringing       SW     Rock                    little/no change in strength
                      sound.
        High          Breaks after one blow when hit                   Distinctly              Highly discoloured usually
 H                                                             DW
                      with pick. Ringing sound.                        Weathered Rock          by iron. Change in strength
        Medium        Readily scored with a knife. Broken              Extremely               ‘Soil’      properties      ie
 M                    in hand with difficulty.                 XW      Weathered Rock          disintegrates or can be
                                                                                               remoulded in water
        Low           Easily scored with a knife.                      Residual Soil           Soil developed from rock –
 L                    Indentations up to 3mm appear             RS                             structure and substance of
                      with firm pick blows. Dull sound                                         rock is no longer evident
        Very Low      Pealed with a knife. Crumbles with
VL                    firm blows. Broken by finger
                      pressure.
        Extremely     Shows soil properties. Easily
 EL
        Low           remoulded by hand

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.