Original source · versioned page text
Attachment 4 - Site Investigation and Slab Report
de “OENGINEERING EBIS 7 & BUILDING INVESTIGATION SERVICES ACN: 104 324 969 ABN: 93 104 324 969 Bal =\. J LABORATORY TEST RESULTS Client: DJ Sommer Homes Job No: 210417 Address: 16 Pines Road, Cooroy Lab No: 210417-A Location: BH2 @ 200-300 Date Sampled: 21/01/2022 Description: Silty Clay with gravels (CI-CH) Firm, Moist, Yellow Light Brown with Orange mottling Test Procedure: AS1289.3.4.1/2.1.1 LINEAR SHRINKAGE CALCULATION Length of Mould (mm} 150 Length of Dry Soil (mm) 131 Shrinkage (mm) 19 Linear Shrinkage % 13 Prepared by: Louis McGrath Date: 25/01/2022 PO Box #73 BUDDINA 0 4575 Unit 2 / 4 Textiie Ave, Warana P (07) 54369199 F (07) 5436 9198 E [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.