Attachment 4 - Site Investigation and Slab Report

of 47

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 

NOTES

1. CONCRETE CLASS

CONCRETE TO BE CLASS N25 FOR SLABS & CLASS N20
FOR FOOTINGS & PIERS. 80 SLUMP. 20 NOM. AGGREGATE

2. CONCRETE COMPACTION

ALL CONCRETE TO BE MECHANICALLY VIBRATED FOR
COMPACTION IN TRENCHES OR FORMWORK.

3. SITE SOIL CONDITIONS

IF SOIL OR SITE CONDITIONS VARY FROM THOSE
INDICATED IN THE SITE INVESTIGATION REPORT THEN
THE FOOTING AND SLAB DESIGN SHOULD BE VERIFIED
WITH E.B.LS.

4, SCALED DIMENSIONS

DO NOT SCALE THIS DRAWING FOR SET OUT. REFER TO
DIMENSIONED WORKING DRAWINGS.

5. TERMITE MANAGEMENT.

PROVIDE TERMITE MANAGEMENT SYSTEM TO REDUCE
LIKELIHOOD OF TERMITE INFESTATION & TO DETER
CONCEALED ENTRY.

|

j | TIMBER
IN HIGH MOISTURE SITES, | | FRAME
COAT EDGE WITH XYPEX

.. CONCENTRATE WHERE |.
CONCRETE IN CONTACT | |
LAP VAPOUR BARRIER

WITH SOIL OR EXTEND
VAPOUR BARRIER 10 {| 200mm MIN. & FULLY TAPE
FIGURE 5.2 OF AS2870 |

6. FILL COMPACTION

COMPACT FILL UNDER SLAB TO 65% SAND DENSITY
INDEX OR 98% STANDARD COMPACTION. USE ONLY CLEAN
SOIL - FREE OF ORGANIC OR COMPRESSIBLE MATTER.

7. ARTICULATION JOINTS

ARTICULATION JOINTS TO BE CONSTRUCTED IN ACCORDANCE
WITH “CONCRETE INFORMATION" FROM THE CEMENT AND
CONCRETE ASSOCIATION OF AUSTRALIA - TECHNICAL NOTE 61.

8. LOAD BEARING

LOAD BEARING WALLS SHOULD BE SUPPORTED BY SLAB
THICKENINGS. WHERE THIS DOES NOT OCCUR, VERIFY THE
DESIGN WITH E.B).S.

9. SITE INSPECTIONS

THE FOOTING & SLAB PREPARATIONS SHOULD BE VERIFIED

BY INSPECTIONS DURING CONSTRUCTION. WHERE PREPARATION
VARIES FROM THE DESIGN THEN ADEQUACY SHOULD BE
VERIFIED WITH E.B.1.S

10, HOT WEATHER CONDITIONS

DURING HOT OR WINDY CONDITIONS
ADDITIONAL PRECAUTIONS SHOULD BE TAKEN

TO CONTROL EVAPORATION, TO REDUCE THE RISK
OF PREHARDENING CRACKING IN CONCRETE,
THIS MAY TAKE THE FORM OF A SPRAY ON ANTI -
EVAPORATIVE AGENT AND ESTABLISHING A
TEMPORARY WIND BREAK

11, BLOCK WORK REINFORCING

VERTICAL STARTER BARS ARE TO BE PROVIDED TO COINCIDE
WITH THE LOCATIONS SPECIFIED BY THE DESIGNER. THESE ARE
GENERALLY AT ALL CORNERS, EITHER SIDE OF OPENINGS
AND AT 1200 MAX CENTERS AND ARE TO BE CAST INTO

THE FOOTING AND/OR SLAB

12, PLUMBING (STORMWATER & SEWER)

FOR “M, H1, H2 & E" CLASS SITES, PROVIDE ROTATION BENDS &
TELESCOPIC JOINS TO ACCOMODATE MOVEMENT OF SOIL
WITHOUT SEPARATION OF PIPEWORK. PIPEWORK FITTINGS SIMILAR
TO “STORMPLASTICS" (WITH RECOMMENDED PRACTICE) IS
RECOMMENDED. WHERE LARGE RUNS OF PIPE, SOFT SOILS OR
UNCOMPACTED FILL LOCATED UNDER SLAB, PROVIDE SUPPORT
FIXING TO SUSPEND FROM MAIN SLAB

13, REFERENCED DOCUMENTS

THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH
REPORT No. 210417-SI/FD BY EBIS

COMPLIANCE WITH DESIGN

FOR COMPLIANCE WITH OUR DESIGN, THE FOLLOWING
MINIMUM STANDARD FOR PIER/PAD FOOTING CONSTRUCTION
IS REQUIRED:

BASE OF PIERS ARE TO BE OF AT LEAST THE SPECIFIED DIAMETER

LOOSE SOIL IS TO BE FULLY REMOVED TO EXPOSE THE SPECIFIED
FOUNDING SOILS;

WHERE COMPLETE REMOVAL OF SOILS IS UNACHIEVABLE, THEN
DEPTH OF THE FILL SHOULD BE LIMITED TO NO MORE THAN 50mm
AND COMPACTED TO ACHIEVE AN ALLOWABLE BEARING CAPACITY
OF 200kPa

AS A GUIDELINE ONLY

FOR SAND:

A70 x 35 STUD SHALL NOT PENETRATE MORE
THAN 20mm USING GREAT EFFORT

FOR CLAY:

A N12 ROD SHALL NOT PENETRATE MORE
THAN 50mm USING GREAT EFFORT

THICKEN SLAB LOCALLY & PLACE
EXTRA SQUARE SL82 SLABMESH
(1200 x 1200) OVER EACH SLAB
PIER. 30 TOP COVER

 

 

 

 

 

 

 

I" N12 STARTER BARS
| At 1000 CTS OR

| RIO STARTER BARS
|

j

 

AT 600 CTS

 

 

 

 

AS PER CLAUSE 5.3.3.4

3-L11TM TOP & BTM TIED AS2870

WITH R6 LIGS AT 900 CTS
OR EQUIVALENT CAGE
[ FOUND P2 PIERS

350

FOOTING & SLAB DETAIL

TERMINATE VAPOUR BARRIER
MIN. 400mm INTO FOOTING

oo oo
3-L1 Tw200 § a ===

 

 

 

ee ee ee >

350

THICKENING BEAM DETAIL

_ a — FOUND P3 PIERS
(a) OF ~ : | | AS SPECIFIED : Te

"TO NCC/AS2870 Te

. 1000 ~~" 1 TONCC/AS2870

  

SL82 SLABMESH. 30 TOP/40 BTM COVER | \ SL82 SLABMESH. 30 TOP/40 BTM COVER | | , 5t82 SLABMESH. 40 BTM COVER \ {|
E = 100 > = 100 | ; ==. = 100 125
pa a Tee ee ——— =
be VAPOUR BARRIER | t r __ -_ Lo VAPOUR BARRIER | a ~ eee ieee eae — VAPOUR BARRIER. |
a TO NCC/AS2870 —L

FOUND P4 PIERS.

: ASSPECIFIED”
350 TO

 

SLAB THICKENING DETAIL

FOR TENDER/APPROVAL 02.03.2022

 

 

Engineering & Building Investigation Services —

Unit 1/4 Textile Ave, Warana

PO Box 973 Buddina 4575

Proposed New Residence

EBIS

 

T: (07) 5436 9199 F: (07) 5436 9198 E: [email protected]

 

Client: C & H Fraser

at Lot 21 (No. 16) Pines Road, Cooroy

FOOTING & SLAB DETAILS

Drawing No. A3-210417-FD2

 

Scale: 1:20

 

February 2022

Checked tod

Drawn: SLS

 

 

 
Log in to download the original file

Attachment 4 - Site Investigation and Slab Report.pdf · 5.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.