Attachment 4 - Site Investigation and Slab Report
Articulation joint Articulation joint
The reinforcement should be lapped by a
minimum of 400 mm. One way of achieving this is
to butt the ends of standards lengths together and
provide an 800-mm length of the 3-mm-diameter
wire(s) or other bed joint reinforcement as a lapping
length. Ideally, laps should be staggered such that
they are not in line. If reinforcement is provided
only above and below window/door openings (to
minimise/control cracking at these vulnerable
locations) the reinforcement should extend about Extend
600 mm past the openings. Bed-joint reinforcement 600 mm
reinforcement minimum past openings
The majority of buildings may be designed,
detailed and articulated to minimise the risk of Figure 34 Typical location of bed-joint reinforcement
cracking in the walls. However, some wall panels
containing openings (especially arches) may
benefit from the addition of reinforcement to limit
the number of articulation joints and/or minimise Dowel bars, with cap at one end, threaded through compressible
the risk of cracking at vulnerable points between filler and placed in bond beam at articulation joint.
Bars must be horizontal and parallel
articulation joints.
9.1 Bond Beams Bars in reinforced concrete
In general terms, bond beams refer to the horizontal bond beam stopped
at articulation joint
reinforced and grouted beams that are found in
reinforced masonry block walls. They are formed
by using either special lintel or ‘U’ shaped blocks or
knock-out bond beam blocks and they are typically
used to provide beams along the tops of walls to
distribute wind loads or as lintels over window and
door openings.
Both AS 3700 and AS 4773.2 do not allow control
joints (including articulation joints) to continue
through bond beams which rely on continuity for
their structural performance, ie those described in
the Standards. Whether joints may be continuous
through bond beams will depend on the loads
being carried, the design of the bond beam and
the location and detailing of the joint. Two separate
cases need to be considered, bond beams at the
tops of walls and those forming lintels over window
and door openings.
Articulation joint with
At tops of walls. Bond beams around the tops gunned-in elastomeric
of masonry block walls are required in high-wind sealant
areas, particularly in the north of Australia. They are
provided mainly to distribute wind uplift loads from Figure 35 Articulation joints through masonry block
the roof members to regularly spaced vertically bond beam at top of wall
reinforced cores which resist the uplift forces. For
this reason it is essential that they be continuous
around the perimeter walls of the building. They
may also transfer some horizontal wind loads back
to walls providing lateral support.
An articulation joint through a bond beam is
formed by stopping the reinforcing bars within the
bond beam 50 mm from each side of the joint. The
articulation joint is then bridged with short, plain
round steel bars (dowels), equal in diameter and
number to the reinforcing bars in the bond beam.
Page 22 Articulated Walling
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.