Original source · versioned page text
Attachment 4 - Site Investigation and Slab Report
gos annow? San FT GROUND SLOPE GROUND OUTSIDE BUILDING SURFACE TO DRAIN AWAY FROM HOUSE. TYPICALLY: 1 IN 20 TO FIRST METER FROM BUILDING EDGE AND 1 IN 50 THEREAFTER GROUND SLOPE 1000 1 IN 20 1 IN 50 ee oe SPOON DRAIN 1 IN 100 MIN. FALL NOTES: 1. IT IS EXTREMELY IMPORTANT TO MAINTAIN GOOD DRAINAGE THROUGHOUT CONSTRUCTION OF ANY BUILDING. 2. FALL AWAY FROM THE BUILDING SHALL BE 1 IN 20 TO FIRST METER FROM BUILDING EDGE AND 1 IN 50 THEREAFTER, AS SHOWN SO THAT WATER DOES NOT POND AGAINST OR NEAR THE BUILDING. 3. ALL WATER RUN-OFF SHALL BE DIRECTED AWAY FROM THE BUILDING AT ALL TIMES PRE AND POST CONSTRUCTION. 4. FOR FLAT SITES, AN ENGINEER SHOULD BE CONSULTED TO ENSURE THAT THE FINISHED HEIGHT OF THE BUILDING ALLOWS PROPER DRAINAGE AWAY FROM THE BUILDING. 5. DRAINAGE MUST NOT DIRECT WATER TO ADJACENT BLOCKS IN A CONCENTRATED STREAM. Engineering & Building Investigation Services — Unit 2/4 Textile Ave, Warana SITE DRAINAGE DIAGRAMS PO Box 973 Buddina 4575 : Phone 07 54369199 Fax 07 54369198 EBIS Drawing No.: DD1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.