Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Attachment 2 - 1856-Stormwater Rev. F

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (11.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 2, section 1. The text section number identifies this passage in the reader.

     GENERAL NOTES                                                                                         SEDIMENT & EROSION CONTROL                                                                         ROADWORKS NOTES
     GN1.        ALL DIMENSIONS AND SET OUT POINTS ARE TO THE KERB LINE OF THE                             NOTES                                                                                              RD1.    THE CONTRACTOR SHALL ESTABLISH THE LOCATION, LINE & LEVEL OF ALL PUBLIC
                 SPECIFIED KERB TYPE. REFER LOCAL AUTHORITIES STANDARD DRAWINGS FOR                                                                                                                                   & PRIVATE UTILITY SERVICES PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION.
                 KERB TYPE DETAILS.                                                                        SE1.          GENERAL:                                                                                     WHERE UTILITY SERVICES ARE SHOWN ON THE PLANS, THEY ARE SHOWN FOR
                                                                                                                             a. TEMPORARY DRAINAGE CONTROL. FLOW SHOULD BE                                            THE INFORMATION OF THE CONTRACTOR ONLY. THE PRINCIPAL SHALL NOT BE
     GN2.        FINAL LOCATIONS OF CONDUITS SHALL BE PROVIDED WHEN AVAILABLE FROM                                                DIVERTED AROUND THE WORK SITE WHERE POSSIBLE.                                       LIABLE FOR ANY OMISSION OF SERVICES FROM THE PLANS OR THE ACCURACY OF
                 SERVICE AUTHORITIES. (IF REQUIRED).                                                                         b.   ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE                                   ANY SERVICES SHOWN ON THE PLANS.
                                                                                                                                  INSTALLED AND BE OPERATIONAL BEFORE COMMENCING
     GN3.        ALL CONSTRUCTION SHALL JOIN SMOOTHLY TO EXISTING.                                                                UP-SLOPE EARTHWORKS.                                                        RD2.    SURFACE LEVELS OVER THE SITE HAVE BEEN INTERPOLATED THROUGH
                                                                                                                             c.   ALL SEDIMENT & EROSION CONTROL DEVICES MUST BE                                      COMPUTER MODELING OF FIELD SURVEY DATA. THESE CALCULATED LEVELS MAY
     GN4.        NOTIFY ALL RELEVANT AUTHORITIES PRIOR TO COMMENCEMENT OF WORK                                                    REGULARLY INSPECTED AND MAINTAINED BY THE                                           VARY FROM THE ACTUAL GROUND LEVEL.
                 WITHIN EXISTING ROAD RESERVES.                                                                                   CONTRACTOR. INSPECTIONS SHOULD OCCUR ON A WEEKLY
                                                                                                                                  BASIS (MINIMUM), ALONG WITH BEFORE AND AFTER                                RD3.    ALL CONSTRUCTION LEVELS SHALL BE SET BY THE CONTRACTOR WITH
     GN5.        THE CONTRACTOR SHALL CONTACT ALL RELEVANT SERVICE AUTHORITIES FOR                                                SIGNIFICANT RUNOFF PRODUCING STORMS.                                                REFERENCE TO SURVEYED BENCH MARKS PROVIDED BY THE PRINCIPAL'S
                 DETAILED LOCATION AND LEVEL OF SERVICES PRIOR TO COMMENCEMENT OF                                            d. ALL DISTURBED LAND MUST BE RENDERED EROSION-PROOF                                     APPOINTED SURVEYOR.
                 WORKS AND THE SITE. ANY DAMAGE TO EXISTING SERVICES SHALL BE                                                     BY THE ESTABLISHMENT OF 80% EFFECTIVE GROUND
                 RECTIFIED AT THE CONTRACTORS EXPENSE.                                                                            COVER WITHIN 28 DAYS OF FINAL EARTHWORKS TRIM.                              RD4.    SUBGRADE EVALUATION IS TO BE UNDERTAKEN IN ACCORDANCE WITH THE
                                                                                                                             e. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE                                              PROCEDURES OUTLINED IN ARRB SR41 - A STRUCTURAL DESIGN GUIDE FOR
     GN6.        ALL WORK SHALL CONFORM WITH THE RELEVANT LOCAL AUTHORITY'S                                                       CONTROLLED, EXPOSED SURFACES TO BE EITHER                                           FLEXIBLE RESIDENTIAL STREET PAVEMENTS.
                 SPECIFICATIONS AND REQUIREMENTS.                                                                                 MULCHED, COVERED WITH EROSION CONTROL BLANKETS
                                                                                                                                  OR TURFED IF EARTHWORKS ARE EXPECTED TO BE                                  RD5.    ALL KERBING SHALL CONFORM TO LOCAL AUTHORITY COUNCIL'S RELEVANT
                                                                                                                                  DELAYED FOR MORE THAN 14 DAYS.                                                      STANDARD DRAWINGS.
                                                                                                                             f.   STRAW BALE SEDIMENT TRAPS ARE A SECONDARY OPTION
                                                                                                                                  WHICH GENERALLY SHOULD NOT BE USED IF OTHER                                 RD6.    ALL ROADSIDE VERGE AREAS AND BATTERS SHALL BE TOP S OILED TO A
                                                                                                                                  OPTIONS ARE AVAILABLE.                                                              MINIMUM DEPTH OF 100mm (LIGHTLY COMPACTED) AND TURFED.

                                                                                                           SE2.          SEDIMENT CONTROL FENCE:                                                              RD7.    PAVEMENT MARKINGS AND SIGNS SHALL BE PROVIDED IN ACCORDANCE WITH THE
                                                                                                                             g. NOT TO BE LOCATED IN AREAS OF CONCENTRATED FLOW.                                      QUEENSLAND MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES.
                                                                                                                             h. NORMALLY LOCATED ALONG THE CONTOUR WITH A
                                                                                                                                 MAXIMUM CATCHMENT AREA 0.6 HA PER 100M LENGTH OF                             RD8.    PROVIDE TELSTRA AND ENERGEX CONDUITS UNDER CONCRETE DRIVE-WAYS,
                                                                                                                                 FENCE.                                                                               WHERE DIRECTED.
                                                                                                                             i.  WOVEN FABRICS ARE PREFERRED, NON-WOVEN FABRICS
                                                                                                                                 MAY BE USED ON SMALL WORK SITES, I.E. OPERATIONAL
                                                                                                                                 PERIOD LESS THAN 6 MONTHS OR ON SITES WHERE                                  DRAINAGE NOTES
                                                                                                                                 SIGNIFICANT SEDIMENT RUNOFF IS NOT EXPECTED.
                                                                                                                                                                                                              DN1.    1.5m WIDE EASEMENTS SHALL BE CREATED OVER ALL INTER-ALLOTMENT
                                                                                                                             j.  WHERE FENCES NEED TO BE LOCATED ACROSS THE
                                                                                                                                                                                                                      DRAINAGE LINES UNO.
                                                                                                                                 CONTOUR - REFER IPEAW STANDARD DRAWING D-0040 FOR
                                                                                                                                 DETAILS.
                                                                                                                                                                                                              DN2.    PIPE BEDDING AND BACKFILL ARE IN ACCORDANCE WITH LOCAL AUTHORITIES
                                                                                                                             k. FENCES ARE REQUIRED 2m MIN FROM TOE OF CUT OR FILL
                                                                                                                                                                                                                      REFERENCED SPECIFICATION AND/OR STANDARD DRAWINGS.
                                                                                                                                 BATTERS, WHERE NOT PRACTICAL ONE FENCE CAN BE AT
                                                                                                                                 THE TOE WITH A SECOND FENCE 1M MIN AWAY. FENCE
                                                                                                                                                                                                              DN3.    PIPE MATERIALS ARE UPVC SEWER PIPE MINIMUM CLASS SN4; UPVC DRAINAGE
                                                                                                                                 SHOULD NOT BE LOCATED PARALLEL WITH TOE IF
                                                                                                                                                                                                                      PIPE PLASCOR OR EQUIVALENT OF EQUIVALENT CLASS TO UPVC SEWER CLASS
                                                                                                                                 CONCENTRATION OF FLOW WILL OCCUR BEHIND THE FENCE.
                                                                                                                                                                                                                      SN4; R.C.P. CLASS "2" RUBBER RING JOINTED OR F.R.C. PIPE CLASS "X" RUBBER
                                                                                                                                                                                                                      RING JOINTED.
                                                                                                           SE3.          TEMPORARY CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP:
                                                                                                                             l. ADJACENT STORMWATER RUNOFF TO BE DIVERTED AWAY
                                                                                                                                                                                                              DN4.    UPVC PIPES ARE EITHER RUBBER RING JOINTED OR SOLVENT WELD JOINTED.
                                                                                                                                FROM ENTRY/EXIT.
                                                                                                                                                                                                                      STANDARD MANUFACTURER'S FITTINGS ARE USED IN BOTH CASES.
                                                                                                                             m. WHEEL - WASH OR SPRAY UNIT MAY BE REQUIRED DURING
                                                                                                                                WET WEATHER.
                                                                                                                                                                                                              DN5.    FRC AND RCP SYSTEMS ARE CONSTRUCTED BY EMBEDDING THE LOWER PRECAST
                                                                                                                                                                                                                      SECTION INTO A WET CAST-INSITU CONCRETE BASE. CUT OUTS FOR PIPE
                                                                                                           SE4.          SAFETY ISSUES MUST BE CONSIDERED AT ALL TIMES, INCORPORATE
                                                                                                                                                                                                                      PENETRATIONS ARE MADE USING CONCRETE SAWS/DRILLS WHILE MINIMIZING
                                                                                                                         TRAFFIC CONTROL DEVICES .
                                                                                                                                                                                                                      DAMAGE TO THE ADJACENT PIPE MATERIALS.
                                                                                                           SE5.          IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT ALL
                                                                                                                                                                                                              DN6.    LIDS TO CAST-IN-SITU MANHOLES ARE LIGHT DUTY, CLOSE FITTING BOLT DOWN
                                                                                                                         SEDIMENT AND EROSION CONTROL MEASURES HAVE BEEN
                                                                                                                                                                                                                      CAST IRON OR GALVANISED STEEL, CONCRETE INFILL TYPE (GATIC LIGHT DUTY,
                                                                                                                         ADDRESSED AS STIPULATED IN THE ENVIRONMENTAL MANAGEMENT
                                                                                                                                                                                                                      POLYCRETE BROADSTEL OR SIMILAR) OF APPROXIMATELY THE SAME INTERNAL
                                                                                                                         PLAN. ADDITIONAL OR DIFFERENT SEDIMENT & EROSION CONTROL
                                                                                                                                                                                                                      DIMENSIONS AS THE MANHOLE.
                                                                                                                         DEVICES MAY BE REQUIRED DURING CONSTRUCTION PHASE TO
                                                                                                                         COMPLY WITH THE ABOVE.
                                                                                                                                                                                                              DN7.    ALL STEEL GRATES AND FRAMES TO BE HOT DIPPED GALVANIZED AND SHALL BE
                                                                                                                                                                                                                      CYCLE PROOF IN ACCORDANCE WITH AS 3996.
                                                                                                           SE6.          TEMPORARY STOCKPILES TO HAVE 1:6 SIDE BATTERS (MAXIMUM) AND
                                                                                                                         BE SHAPED TO ENSURE RUN-OFF IS TREATED AND MANAGED TO THE
                                                                                                                                                                                                              DN8.    LIDS MATCH FINISHED SURFACE GROUND SLOPE AND SIT PROUD AS SHOWN ON
                                                                                                                         SATISFACTION OF THE SUPERINTENDENT. ALL EXPOSED STOCKPILE
                                                                                                                                                                                                                      THE LOCAL AUTHORITIES STANDARD AND ARE MARKED "STORMWATER"
                                                                                                                         SURFACES TO BE GRASS SEEDED. SEDIMENT FENCES AND CUT-OFF
                                                                                                                                                                                                                      IMPRESSED INTO THE CONCRETE INFILL. INFILL CONCRETE IS CLASS N25.
                                                                                                                         DRAINS MAY BE REQUIRED.
                                                                                                                                                                                                              DN09.   UPVC PIPE AND KERB ADAPTORS ARE USED WHERE DISCHARGE IS INTO THE KERB
                                                                                                                                                                                                                      AND CHANNEL.

                                                                                                                         NOTE:                                                                                DN10.   INTER-ALLOTMENT DRAINAGE LINES ARE LOCATED 0.5 METRES FROM REAR OR
                                                                                                                         EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE DESIGNED                                     SIDE BOUNDARIES WITHIN THE PROPERTIES SERVED.
                                                                                                                         AND PROVIDED IN ACCORDANCE WITH THE INTERNATIONAL EROSION
                                                                                                                         CONTROL ASSOCIATION (AUSTRALASIA) 2018's "BEST PRACTICE                              DN11.   MATERIALS AND CONSTRUCTION ARE IN ACCORDANCE WITH COUNCIL'S
                                                                                                                         EROSION AND SEDIMENT CONTROL FOR BUILDING AND                                                STANDARD SPECIFICATION FOR STORMWATER DRAINAGE.
                                                                                                                         CONSTRUCTION SITE.
                                                                                                                                                                                                              DN12.   THE CONTRACTOR SHALL CONFIRM ALL LEVELS BEFORE COMMENCING WORK.

                                                                                                                                                                                                              DN13.   THE CONTRACTOR SHALL CONTACT ALL RELEVANT AUTHORITIES AND LOCATE
                                                                                                                                                                                                                      ALL SERVICES BEFORE COMMENCING WORK.THE CONTRACTOR SHALL BE
                                                                                                                                                                                                                      RESPONSIBLE FOR ANY DAMAGE CAUSED TO SERVICES BY THE WORKS
                                                                                                                                                                                                                      IRRESPECTIVE OF WHETHER THE SERVICES ARE SHOWN ON THE DRAWINGS OR
                                                                                                                                                                                                                      NOT.




                                                                                                                                                                                                                                                                          PROJECT:                               JOB NUMBER
REV DATE DESCRIPTION                                          BY   CHKD DRAWN
                                                                            I GDETAL
                                                                                   IS                                            SCALE                                                APPROVED                                                                            PROPOSED SUBDIVISION                        1856
 A    19-02-20   FOR APPROVAL                                 MM    CL                                                                                                                                                                                                    AT NOOSA CIVIC, WALTER HAY DRIVE
 B    24-08-20   REVISED STORMWATER ALIGNMENT                 MM    CL   DATUM           AHD                                                                                                                                                                                                                 SHEET:    2   OF   30
                                                                                                                                                                                                                                                                          FOR STOCKWELL PTY LTD
 C
 D
      21-09-20
      16/10/20
                 REVISED FOR NOOSA COUNCIL DRAFT CONDITIONS
                 REVISED AS PER COUNCIL RFI [29/09/20]
                                                              MM
                                                              MM
                                                                    CL
                                                                    CL
                                                                         DESIGN         MM                                                                                           .................                                                                                                       DRAWING NUMBER      REV
                                                                                                                                                                                                                                                                          DRAWING TITLE:
                                                                         DRAWN          MM                                                                                       Director: CAMERON LANDRETH
 E    26-11-20   REVISED AS PER COUNCIL RFI [5-11-20]         MM    CL                                                                                                                                         p 07 5443 8285                 ABN 89 215 591 077
                                                                         DESIGN CHECK                                                                                                  (RPEQ 19358)            e [email protected] w www.barlowshelley.com.au
                                                                                                                                                                                                                                                                          STORMWATER NOTES                    SW02                   E
                                                                                         CL
                                                                                                   This drawing is not to be copied or amended without written permission from                                 a PO Box 899, Maroochydore,4558
                                                                         DATE           13-09-19   Barlow Shelley Consulting Engineers
Log in to download the original file

Attachment 2 - 1856-Stormwater Rev. F.pdf · 11.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.