Council archive · source document
Decision Notice - 010.2008.00001491.001 [As Published] · 132008.1491
2008/1491
0729 WD 2.02 C Ground Floor Plan – Middap Ditchfield 21 October 2008
Pty Ltd
0729 WD 2.03 C First Floor Plan – Middap Ditchfield Pty 21 October 2008
Ltd
0729 WD 2.10 C Ground Floor Dimension Plan – Middap 21 October 2008
Ditchfield Pty Ltd
0729 WD 3.01 C Elevations – North & South – Middap 21 October 2008
Ditchfield Pty Ltd
0729 WD 3.02 C Elevations – East & West – Middap 21 October 2008
Ditchfield Pty Ltd
0729 WD 4.01 C Sections A-A & B-B & H-H – Middap 21 October 2008
Ditchfield Pty Ltd
0729 WD 4.02 C Sections C-C & D-D – Middap Ditchfield 21 October 2008
Pty Ltd
0729 WD 4.03 C Sections E-E & F-F & G-G – Middap 21 October 2008
Ditchfield Pty Ltd
0729 WD 6.01 C Construction Details 1, 2, 3, 4, 5 – 21 October 2008
Middap Ditchfield Pty Ltd
0729 WD 6.02 C Construction Details 6, 7, 10, 12 – 21 October 2008
Middap Ditchfield Pty Ltd
0729 WD 6.03 C Construction Details 8, 9, 11 – Middap 21 October 2008
Ditchfield Pty Ltd
and may be amended by these conditions and annotations on the plans.
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. Earthworks required on site shall be carried out in accordance with Council’s Planning Scheme
Policy PSP5 – Engineering Design Standards, so as not to cause the additional ponding of
water on any adjoining lands or concentrate or direct overland flow on to an adjoining property.
4. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
5. The building height shall not exceed 8.0 metres above natural and finished ground level.
6. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of work confirming compliance with the
maximum allowable building height as required by either the conditions of approval or the
Planning Scheme.
7. A minimum of 20% of the site shall be retained as soft landscaping.
8. The existing stand of trees located in the South West corner of the site shall be retained.
9. Security in the form of a cash bond or trading bank guarantee to the sum of $6,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
Page 2 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00001491.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 66 KB (small file)
- File type
No other editions are linked here.