Skip to the record
The only place to find full transcripts.

Council archive · source document

Decision Notice - 010.2008.00001491.001 [As Published] · 132008.1491

of 9

Text shows just the words. Original shows the document exactly as it was published.

                                                                                         2008/1491



General
23.    Any construction works undertaken in the vicinity of Councils existing water supply or
       sewerage infrastructure will not adversely affect the integrity of the infrastructure.
24.    Any damage caused to any public utility during the course of construction must be repaired to
       Council’s standards and at no cost to Council.
25.    Any alteration of any public utility or other facilities necessitated by the development of the
       land or associated construction works external to the site must be at no cost to Council.
26.    The transportation of all materials to and from the site must be undertaken in a manner such
       that no particle matter escapes onto a public road. All vehicles carrying materials either to or
       from the site must be covered to prevent materials including dust being windblown from the
       vehicle.

5      REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger              Referral Status   Referral Agency            Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.       Rev.     Plan / Document Name                         Date
 0729 WD 1.03              C        Site Plan – Middap Ditchfield Pty Ltd        21 October 2008
 0729 WD 2.01              C        Sub-Floor Plan – Middap Ditchfield Pty       21 October 2008
                                    Ltd
 0729 WD 2.02              C        Ground Floor Plan – Middap Ditchfield        21 October 2008
                                    Pty Ltd
 0729 WD 2.03              C        First Floor Plan – Middap Ditchfield Pty     21 October 2008
                                    Ltd
 0729 WD 2.10              C        Ground Floor Dimension Plan – Middap         21 October 2008
                                    Ditchfield Pty Ltd
 0729 WD 3.01              C        Elevations – North & South – Middap          21 October 2008
                                    Ditchfield Pty Ltd
 0729 WD 3.02              C        Elevations – East & West – Middap            21 October 2008
                                    Ditchfield Pty Ltd
 0729 WD 4.01              C        Sections A-A & B-B & H-H – Middap            21 October 2008
                                    Ditchfield Pty Ltd
 0729 WD 4.02              C        Sections C-C & D-D – Middap Ditchfield       21 October 2008
                                    Pty Ltd
 0729 WD 4.03              C        Sections E-E & F-F & G-G – Middap            21 October 2008
                                    Ditchfield Pty Ltd
 0729 WD 6.01              C        Construction Details 1, 2, 3, 4, 5 –         21 October 2008
                                    Middap Ditchfield Pty Ltd


                                                                                        Page 5 of 9

Used in these records

About this file

File size
66 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00001491.001 [As Published].pdf · 66 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.