Council archive · source document
Attach C - Landscape Notes - Sheet 02 · MCU15/0038
Attached to the e-mail MCU15/0038 & OPW15/0072 Response to Information request - Email 2 of 2.
LANDSCAPE GENERAL NOTES: THE CONTRACTORS SHALL: ¢ Remove all un-wanted debris/material from site. ¢ Confirm all dimensions in site prior to construction. ¢ Seek instruction from superintendent where level discrepancies and poor soil structure occurs. SERVICES: ¢ The contractor shall confirm the location of all services with relevant authorities prior to planting and excavating. ¢ All trees must be planted a min. of 1000mm from underground services. ¢ All trees must be planted 4 m from overhead street lights. DRAINAGE: ¢ Install sub-soil drains as required and where garden abuts building and connect into stormwater. ¢ Sub-soil drains to be 100mm slotted ag pipe covered with filter fabric and shall be surrounded with a minimum 100mm or 25mm diameter drainage gravel. ¢ Ensure drainage works correlate with adjacent land and specified finished levels. GENERAL PLANTING: ¢ Plant stock is to be approved by landscape contractor and qualified aborist prior to acceptance of delivery. ¢ Mulch bed areas should not exceed a 1:3 grade; where slopes are more than 1:3, install biodegradable jute matt. Where slopes are greater than 1:2 install jute mesh product to manufacturers specification. ¢ Install specified topsoil and crown bed at centre with 1 inch Hoop Mulch as specified. ¢ All plantings shall incorporate the inclusion of a slow release native plant fertiliser (as per manufacturers specification) and the use of soil moisture retention additive (as per manufactures specification), placed adjacent to the plant root ball at the time of planting. ¢ Trees are to be certified by a qualified aborist as natspec compliant prior to delivery to site. * Qualified aborist to select natspec compliant trees at nursery and check delivery to site. TOPSOIL: ¢ Allimported topsoil to comply with AS 4419. ¢« Where site soil is to be Used as topsoil, ameliorate site soil as specified by the soil testing laboratory. All soil stockpiles are to be maintained to control weeds routinely and guard against dispersion by wind or water. Stockpiles shall be limited to a maximum height of 2m and may require covering or retaining. Stockpiles are not permitted within close proximity to residential properties. ¢ Generally soil to be used shall comply with AS 4419 and the contractor should ensure it complies with the following specification: 1. Friable and free drainage. 2. Good texture and structure for selected use. 3. Acceptable conductivity and ph. levels for intended plant species to be planted. MULCH: ¢ All mulch proposed to be used on site shall be free of foreign matter including anthropogenic waste, rock, soil, sediment, contamination, weeds and sticks. ¢ Planted areas should be mulched to a minimum 100mm deep to ensure site water conversation requirements are achieved as specified. a: 4rene street, noosaville, outside qld 4566 re arooreeson Sree Client: . " init t itsich nm I. . landscape architects 07 5474 4781, ae Si al ot be Dowling and Neylan cap +e €[email protected] g) conkactos are to contm Cllent address: + horticultural specialists Wi WWW. measurements on site. prior 10 168 Noosa Parade, Noosaville, 4566 construction or planting. the identification of existing services should also take place before commencement of works. outsidenoosa.com.au John: 0409 960 538 Abi: 0411 138 269 NOOSA GENERAL: ¢ For more detail regarding architecture or engineers refer to the projects Architect and Engineers drawings. ¢ Planting shown reflects the design intent, exact numbers and locations will require confirmation on site by the superintendent. ¢ Any changes to be made to the landscape plan must be approved by the landscape architect and superintendent. ¢ All planting layouts are to be approved by the landscape architect on site prior to planting. ¢ Allstructures are to be approved by the appropriate government departments prior to any construction taking place. ¢ Alllandscape plans presented assume that all base and survey information is accurate and to scale. The contractor shall check landscape plans presented for any discrepancies with the existing site conditions or other dwelling presented prior to any construction work taking place. If discrepancies do occur these shall be highlighted at once to the superintendent prior to any construction work taking place. IRRIGATION: * These landscape plans assume all landscapes areas will be irrigated automatically to appropriate standards and installed by a suitably qualified person and have a minimum 12 month warranty. MAINTENANCE: ¢ Maintain whole landscaping works for establishment period of 13 weeks. ¢ Irrigation and watering: ¢ 2. Every 2-3 days during the establishment period ¢ 1. Once a week thereafter Weed removal and wick wiping, as required to reduce competition and seeding. ¢ Re- mulching, as required to maintain a consistent depth until plants are established. date: 19/06/2015 designed by: JS + AL Landscape General Notes job no: drawn by: AL scale N/A @A3 issue: A sheet no 2 of 4 purpose: Operational Works
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attach C - Landscape Notes - Sheet 02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.