      Hydraulic Review (MRP Hydraulic and Fire services Consultants)

          This section outlines methods for achieving sanitary drainage and firefighting water supply services to the
          proposed 15 Eco Cabins whilst mitigating the impact on tree roots and ground level flora and fauna. Options
          presented are based on high level review and assessment of existing and proposed conditions. Finite detailing
          will evolve through the typical Building and Plumbing Permit approval design development process in
          consultation with relevant parties including, but not limited to, the Building Certifier and Queensland Fire
          Department (QFD).

                 General: Fifteen - Class 3 - Eco Cabins for visitor accommodation are proposed within the precinct. All
                  class three buildings are less than 500m2 and therefore do not trigger the need for Special Fire Services
                  in accordance with NCC2022 E1D1 – Fire Hydrants. The extent to which each building is fire separated
                  in accordance with the NCC provisions will need to be reviewed and confirmed in consultation with the
                  building certifier during the detailed design / BA phase.
                 Brigade Access to Water Supply: The private 100mm water reticulation main within the site supplies
                  domestic drinking water and brigade access to the water supply. An existing Dual Pillar (feed) hydrant is
                  provided in connection with the private reticulation main near the proposed Eco Cabin development. A
                  new dual pillar hydrant will be extended to the northern corner of the carpark from the existing private
                  water main for the purpose of providing brigade access to water supply in accordance with the ‘QFES
                  Fire Hydrant and Vehicle Access Guidelines for Residential, Commercial and Industrial Lots’. The
                  attached drawing H-101 (refer to ATTACHEMNET E) provides indicative concept planning for Brigade
                  Access to Water Supply. This drawing shows the brigade appliance parked on a hardstand within 90m of
                  the entry door to the most remote cabins. As a minimum, the new dual pillar hydrant will be capable of
                  delivering 10 l/s flow at 200 kPa residual pressure.
                 Sanitary Drainage: Survey plans indicate an existing sanitary inspection chamber exists near the Eco
                  Cabin development. Survey levels demonstrate a chamber depth of 2240mm. Proposed Eco Cabins and
                  walkways are elevated at high level above natural ground. There is ample opportunity to suspend
                  elevated sanitary drainage, on grade , from the floor framing and supporting structures below the cabins
                  and boardwalks. Subject to any final built form constraints, the alternative would be to install a compact
                  proprietary macerator pump, in duplicate, for every two cabins also considered in the preliminary design.

                  The attached drawings H-102 (refer to ATTACHEMNET E) provides indicative concept planning for
                  sanitary drainage and includes a mix of in-ground and elevated sanitary drainage, plus compact packaged
                  pump stations and rising mains.

                  MRP Consultants have confirmed the existing provisioned 150mm sanitary drain is suitably sized to
                  accommodate the fixture unit loading from the additional 15 cabins.

                 Conclusion: Based on the above, it is confirmed that a compliant firefighting water supply and sanitary
                  drainage can be provided without significant impact to the vegetation and trees identified for protection.

                  The hydraulic drawings for construction are included in ATTACHMENT E.
          6




Construction and Tree Management Plan - REV03                                                                Page 58 of 45

Used in these records

About this file

File size
9.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 2 - Construction and Tree Management Plan.pdf · 9.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.