Attachment 2 - Construction and Tree Management Plan · OPW25/0206
Plans and drawings: the text below has words only, no drawings.
Hydraulic Review (MRP Hydraulic and Fire services Consultants)
This section outlines methods for achieving sanitary drainage and firefighting water supply services to the
proposed 15 Eco Cabins whilst mitigating the impact on tree roots and ground level flora and fauna. Options
presented are based on high level review and assessment of existing and proposed conditions. Finite detailing
will evolve through the typical Building and Plumbing Permit approval design development process in
consultation with relevant parties including, but not limited to, the Building Certifier and Queensland Fire
Department (QFD).
General: Fifteen - Class 3 - Eco Cabins for visitor accommodation are proposed within the precinct. All
class three buildings are less than 500m2 and therefore do not trigger the need for Special Fire Services
in accordance with NCC2022 E1D1 – Fire Hydrants. The extent to which each building is fire separated
in accordance with the NCC provisions will need to be reviewed and confirmed in consultation with the
building certifier during the detailed design / BA phase.
Brigade Access to Water Supply: The private 100mm water reticulation main within the site supplies
domestic drinking water and brigade access to the water supply. An existing Dual Pillar (feed) hydrant is
provided in connection with the private reticulation main near the proposed Eco Cabin development. A
new dual pillar hydrant will be extended to the northern corner of the carpark from the existing private
water main for the purpose of providing brigade access to water supply in accordance with the ‘QFES
Fire Hydrant and Vehicle Access Guidelines for Residential, Commercial and Industrial Lots’. The
attached drawing H-101 (refer to ATTACHEMNET E) provides indicative concept planning for Brigade
Access to Water Supply. This drawing shows the brigade appliance parked on a hardstand within 90m of
the entry door to the most remote cabins. As a minimum, the new dual pillar hydrant will be capable of
delivering 10 l/s flow at 200 kPa residual pressure.
Sanitary Drainage: Survey plans indicate an existing sanitary inspection chamber exists near the Eco
Cabin development. Survey levels demonstrate a chamber depth of 2240mm. Proposed Eco Cabins and
walkways are elevated at high level above natural ground. There is ample opportunity to suspend
elevated sanitary drainage, on grade , from the floor framing and supporting structures below the cabins
and boardwalks. Subject to any final built form constraints, the alternative would be to install a compact
proprietary macerator pump, in duplicate, for every two cabins also considered in the preliminary design.
The attached drawings H-102 (refer to ATTACHEMNET E) provides indicative concept planning for
sanitary drainage and includes a mix of in-ground and elevated sanitary drainage, plus compact packaged
pump stations and rising mains.
MRP Consultants have confirmed the existing provisioned 150mm sanitary drain is suitably sized to
accommodate the fixture unit loading from the additional 15 cabins.
Conclusion: Based on the above, it is confirmed that a compliant firefighting water supply and sanitary
drainage can be provided without significant impact to the vegetation and trees identified for protection.
The hydraulic drawings for construction are included in ATTACHMENT E.
6
Construction and Tree Management Plan - REV03 Page 58 of 45
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Construction and Tree Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.