Attachment 2 - Construction and Tree Management Plan · OPW25/0206
Plans and drawings: the text below has words only, no drawings.
4 T REE P ROTEC TION F ENCING Due to the nature of the RACV Noosa site, standard Tree Protection Fencing (TPF) will not be achievable throughout the site. The typical steel mesh panels are not suitable to create the Exclusion Zones internally but may be used for site perimeter fencing that can be incorporated into the tree Exclusion Zone setout. Exclusion Zone fencing is to consist of 1m high fabric orange mesh barrier fencing with star pickets with end caps as support, spaced at 4 – 5m and attached with zip ties in a fauna-friendly manner. Flagging is to be used on areas away from the site to demarcate 'no-go zones'. The photographs below show alternative options that are considered suitable. When the access and construction requirements have been established, the exclusion zones can be positioned for the trees to be retained and the alignment of the TPF can be determined. The TPF is required to be installed in the presence and under the guidance of the Project Arborist prior to any construction works commencing on the site and should remain intact until the completion of all works. As the entire site is considered a protected zone the TPF will be erected in a non-standard alignment with additional measures installed. Ground protection is to be installed specific to requirements. Trunk and branch protection, to prevent direct contact with the tree’s branch, trunk and/or buttress roots should be installed. This can comprise Geo fab or 20mm thick hessian and wooden battens strapped/taped to the tree’s trunk with a skirt over the buttress roots. These protection measures will be established between the construction company and the Project Arborist. 4.1 RESTRICTED ACTIVITIES WITHIN THE EXCLUSION ZONES Restricted activities within the Exclusion Zones that would cause harm to the retained trees include, but are not limited to: • Any non-approved construction works. • Any non-approved excavation or cultivation of the ground. • Any non-approved storage. • Preparation of chemicals, including cement products. • Parking of vehicles and plants. • Refuelling. • Dumping of waste. • Wash down and cleaning of equipment. • Placement of Fill. • Lighting fires. • Any non-approved soil level changes. • Temporary or permanent installation of utilities and signs. • Physical damage to the tree. 24_11_22_RACV Noosa_Tree Protection Procedures Page 7 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Construction and Tree Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.