Minor_Change-Req
Approved Plans
As a result of the changes, it is requested the table of approved plans is to be updated to reflect the following:
Approved Plans
Plan No. Issue Plan Name Date
BA000 P-3 Cover Sheet & Drawing List by E Studio Architecture 2026-03
BA100 P-3 Ground Floor Plan – Demolition by E Studio Architecture 2026-03
BA103 P-3 First Floor Plan – Demolition by E Studio Architecture 2026-03
BA104 P-3 Ground floor Plan – Proposed by E Studio Architecture 2026-03
BA105 P-3 First Floor Plan – Proposed by E Studio Architecture 2026-03
BA106 P-3 Roof Plan – Proposed by E Studio Architecture 2026-03
BA201 P-3 Elevations – Proposed by E Studio Architecture 2026-03
BA202 P-3 Sections – Proposed by E Studio Architecture 2026-03
BA300 P-3 Window and Door Schedule by E Studio Architecture 2026-03
Change to conditions
No changes to the existing conditions of approval are required as a result of the proposed amendments.
Change Application – Planning Act 2016
The proposed changes to the Development Permit’s approved plans are considered a Minor Change under s78
of the Planning Act 2016.
Under the Planning Act 2016 and the Development Assessment Rules, a change may be considered a minor
change where it does not result in a substantially different development to that which was originally approved,
in particular:
• The proposed changes will not result in a substantially different development to that which was
approved. The building footprint and scale of the built form remains consistent with the approved
development with slight variation on the upper level;
• The proposed changes do not involve any additional parcels of land;
• The proposed changes do not change the existing building height:
• The proposed changes do not introduce additional impacts on surrounding infrastructure or services;
• The development continues to provide appropriate built form and landscaping consistent with the local
character;
• The proposed changes do not alter the level of assessment of the development under the planning
scheme and do not result in prohibited development or trigger referral to any referral agencies; and,
• The proposed changes do not alter the ability for the development to operate as approved.
Accordingly, the proposed amendments are considered to remain within the scope of the approved
development and do not result in a substantially different development.
Page 5 of 6
Our ref: 260312