2019-05-13 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 13 MAY 2019
21.1. In regard to the Kauri Street frontage, the new kerb and channel must be
aligned so that it is offset 8 metres from the existing kerb and channel on
the western side of Kauri Street measured from the nominal face of the
kerb. The new works must be extended to the north of the subject site and
be generally in accordance with drawing number 2018068 – Dwg 04 of 24
titled External Works Layout Plan dated March 2019 prepared by 360 Civil
Consulting and join smoothly with the existing formation.
21.2. In regard to the Olivine Street frontage the new kerb and channel must be
aligned at about 12m offset from and parallel to the property boundary and
must extend for the full frontage of the subject site. The works shall include
suitable tapers extending beyond the frontage of the subject site to
smoothly join to the existing pavement.
21.3. The works (Kauri Street, Olivine Street and the intersection) must include
suitable drainage structures and stormwater collection to ensure that runoff
from the road formation is collected, controlled and directed to ensure that
the roadway is safely trafficable and must be in compliance with the
relevant sections of the Queensland Urban Drainage Manual (QUDM).
21.4. As part of the application for operational works, the developer’s civil
engineering consultant shall investigate and report on the possible
deficiencies in the existing stormwater system, to the western end of Agate
Street and including inspection by closed circuit television (CCTV) of the
existing stormwater system. The developer is required to rectify any
deficient stormwater pipes or structures extending from the development
frontage down to and including the manhole downstream of the 600x1200
box culvert which crosses Kauri Street.
21.5. The design and construction of all works shall be carried out in accordance
with Council’s Planning Scheme Policy PSP05 – Engineering Design
Standards – Roads, Drainage and Earthworks and the applicable
engineering standards current at the time of construction. The above
condition is imposed pursuant to s145 of the Planning Act 2016 being non-
trunk infrastructure.
29. A CCTV inspection must be carried out by a Council approved CCTV contractor
upon satisfactory completion of construction works that are to become a Council
asset. The developer will be responsible for the full cost of CCTV inspection,
including any additional inspection necessary following defect identification and
rectification.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act
2016.
Carried.
Page 7 of 8