    MCU25/0053 & OPW25/0074 21
         NOVEMBER 2025



                                                                                              ADG Consulting Pty Ltd          All Correspondence
                                                                                              ACN: 630 555 225                PO Box 6405
                                                                                              ABN: 98 630 555 225             Yatala DC QLD 4207


                                                                                              P 07 3801 1564
                                                                                              E [email protected]
                                                                                              W adgconsulting.com.au




                              Dewatering Management Plan
                              Proposed Residential Development:
                              Lot 0 on BUP10936, 7 Noosa Parade, Noosa Heads, Queensland.




                              May 2025




                              Prepared for:
                              Seymour Group




                          Acid Sulfate Soil Assessment      On‐site Wastewater Management      Contaminated Land Assessment & Remediation
                          Dewatering Management          Environmental Management Plans     Surface & Groundwater Investigation & Monitoring

Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025
Full text of the other 45 pages

Page 2

                                                                                                                          ADG Consulting Pty Ltd



                                                                             Report details



                              Project ref:                   ADG1777.25
                              ADG Project Manager:            Michael Campbell

                              Report title:                  Dewatering Management Plan
                                                             Proposed Residential Development:
                                                             Lot 0 on BUP10936, 7 Noosa Parade, Noosa Heads, Queensland


                              Version:                       Rev0
                              Author:                        Lilli O’Sullivan
                              Reviewer:                       Michael Campbell


                              Client:                        Seymour Group
                              Client contact:                Belinda Amble


                              Distribution date:             1 May 2025

                              Distributed to:                Seymour Leisure Trust
                              Copies:                        1 PDF


                              ADG Consulting Pty Ltd




                              Lilli O’Sullivan                                       Michael Campbell BEnvSc, BSc[Hons],
                              BEnvSc,                                                DipProjMgt, DipOHS, DipBusMgt, DipBus(Quality Auditing)
                              Environmental Scientist                                MEIANZ, MALGA, MASSI
                                                                                     Director & Principal Environmental Scientist

                              Date: 1 May 2025


                              This document and all its content is copyright. Apart from fair dealing for the purposes of study, research, criticism
                              and/or review as permitted under the Copyright Act 1968, no part of the content may be reproduced, reused or
                              redistributed without the prior written permission of ADG Consulting Pty Ltd.




                        ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                                    Page ii




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 3

                                                                                                    ADG Consulting Pty Ltd



                                                                             Table of Contents

                      1        INTRODUCTION                                                                           1
                      1.1      PROPOSED DEVELOPMENT                                                                   1
                      1.2      RELEVANT GUIDELINES                                                                    1
                      1.3      GENERAL ENVIRONMENTAL DUTY                                                             2
                      1.4      DMP OBJECTIVES                                                                         2
                      1.5      SCOPE OF WORK                                                                          2
                      2        SITE CHARACTERISTICS                                                                   3
                      2.1      PROPERTY DESCRIPTION                                                                   3
                      2.2      SURROUNDING ENVIRONMENT                                                                3
                      2.3      TOPOGRAPHY                                                                             3
                      2.4      GEOLOGY & SOILS                                                                        3
                      2.5      HYDROGEOLOGY                                                                           3
                      3        PREVIOUS INVESTIGATIONS                                                                4
                      3.1      PTG CONSULTING 2025                                                                    4
                      3.1.1    SOILS                                                                                  4
                      3.1.2    GROUNDWATER                                                                            4
                      3.2      GROUNDWATER QUALITY                                                                    5
                      4        WATER QUALITY OBJECTIVES                                                               6
                      4.1      RECEIVING ENVIRONMENT                                                                  6
                      4.2      DEVELOPMENT OF WATER QUALITY OBJECTIVES                                                6
                      4.3      PROPOSED WATER QUALITY OBJECTIVES                                                      7
                      5        DEWATERING METHODOLOGY                                                               10
                      5.1      BASEMENT EXCAVATION AND SHORING                                                      10
                      5.2      GROUNDWATER EXTRACTION                                                               10
                      5.3      EXTRACTION/DISCHARGE RATES AND VOLUME                                                10
                      5.3.1    DEWATERING EXTRACTION CALCULATION BASED ON SUBSURFACE SOIL PROFILE                   10
                      5.4      DEWATERING DURATION                                                                  11
                      5.5      GROUNDWATER DRAWDOWN                                                                 11
                      5.6      GROUNDWATER TREATMENT                                                                12
                      5.7      NOMINATED HOLD POINTS                                                                12
                      6        WATER QUALITY MANAGEMENT                                                             13
                      6.1      RESPONSIBILITY                                                                       13
                      6.2      OPERATIONAL POLICY                                                                   13
                      6.3      PERFORMANCE CRITERIA                                                                 13
                      6.4      IMPLEMENTATION STRATEGY                                                              13
                      6.4.1    GROUNDWATER TREATMENT SYSTEMS                                                        13
                      6.4.2    DEWATERING STRATEGY                                                                  14
                      6.4.3    INITIAL PUMP‐OUT                                                                     14
                      6.5      MONITORING                                                                           14
                      6.5.1    VISUAL MONITORING                                                                    14
                      6.5.2    WATER QUALITY MONITORING                                                             14
                      6.5.3    MONITORING RESPONSIBILITIES                                                          15
                      6.6      MAINTENANCE                                                                          16
                      6.7      REPORTING                                                                            16
                      6.8      CONTINGENCIES                                                                        17
                      7        NOISE & ODOUR MANAGEMENT                                                             18



                          ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                       Page iii




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 4

                                                                                      ADG Consulting Pty Ltd



                      7.1      RESPONSIBILITY                                                         18
                      7.2      OPERATIONAL POLICY                                                     18
                      7.3      PERFORMANCE CRITERIA                                                   18
                      7.4      IMPLEMENTATION STRATEGY                                                18
                      7.4.1    NOISE                                                                  18
                      7.4.2    ODOUR                                                                  18
                      7.5      MONITORING                                                             18
                      7.6      REPORTING                                                              19
                      7.7      CONTINGENCIES                                                          19
                      8        LIMITATIONS                                                            20
                      9        REFERENCES                                                             21
                      APPENDIX A:          FIGURES
                      APPENDIX B:          LICENCED GROUNDWATER BORE SEARCH RESULTS
                      APPENDIX C:          DRAWINGS
                      APPENDIX D:          CONE OF DEPRESSION CALCULATIONS




                          ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                         Page iv




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 5

                                                                                                                 ADG Consulting Pty Ltd


                      1        Introduction
                               ADG Consulting Pty Ltd (ADG) was engaged by Seymour Group to prepare a Dewatering Management
                               Plan (DMP) for the proposed residential apartment development within property described as Lot 0 on
                               BUP10936, 7 Noosa Parade, Noosa Heads, Queensland.
                      1.1      Proposed development
                               It is understood the proposed development will comprise a two‐storey building over a single‐level in‐
                               ground basement, extending across the 1,120 m2 site.

                               Based on information provided by Seymour Group, existing ground levels across the proposed basement
                               footprint are approximately RL 2.1 m Australian Height Datum (AHD). Excavations to facilitate the
                               basement construction are proposed to extend to an approximate depth of 2.8 m below existing ground
                               level (bgl), corresponding to an approximate elevation of RL ‐1.1 mAHD (i.e. finished basement floor level
                               of RL ‐0.7 mAHD; allowing for 400 mm raft slab and blinding layer). Localised deeper excavations may be
                               required to facilitate other structural elements (i.e. lift overrun pit, pile caps and footings), where
                               required.

                               During a geotechnical and acid sulfate soil investigation on the site in January 2025, no groundwater was
                               recorded in the drilling of boreholes to the depth of 4.5 mgbl (PTG Consulting, 2025). PTG noted that
                               groundwater levels are expected to fluctuate in response to variations in rainfall and are likely to rise
                               close to the ground surface during periods of heavy or prolonged rainfall. No further recent data has been
                               supplied for review in preparing this DMP, however based on ADG’s experience on nearby sites in the
                               locality in recent years, it is anticipated that groundwater should be expected at or around 0.5 m AHD +/‐
                               0.5 m, depending on tidal and seasonal rainfall conditions. Dewatering will therefore be necessary to
                               allow the basement and other structural elements to be constructed in dry conditions.
                      1.2      Relevant guidelines
                               The DMP was prepared with reference to the following documents:

                                    Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2018. Australian and
                                     New Zealand Governments and Australian state and territory governments, Canberra ACT, Australia
                                     (ANZG, 2018), which supersedes Australian and New Zealand Guidelines for Fresh and Marine Water
                                     Quality, Australian and New Zealand Environment and Conservation Council and Agriculture and
                                     Resource Management Council of Australia and New Zealand (ANZECC/ARMCANZ). 2000.

                                    Environmental Protection (Water & Wetland Biodiversity) Policy 2019. Queensland Government.
                                     2019.

                                    Guidelines for Managing Risks in Recreational Water. Australian Government, National Health and
                                     Medical Research Council (NHMRC). 2008.

                                    Monitoring and Sampling Manual 2018, Version 2 June 2018. Department of Environment and
                                     Science (DES). 2018.

                                    Noosa River environmental values and water quality objectives. Department of Environment and
                                     Science (DES). 2022.

                                    National Environment Protection (Assessment of Site Contamination) Measure 1999, (as amended
                                     May 2013). National Environment Protection Council (NEPC). 2013.

                                    Queensland Water Quality Guidelines 2009, Version 3. The Department of Environment and
                                     Heritage Protection (DEHP). 2013.




                          ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                      Page 1




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 6

                                                                                                                    ADG Consulting Pty Ltd

                      1.3     General environmental duty
                              The Environmental Protection Act 1994 describes that all persons in Queensland have a “General
                              Environmental Duty” and that “a person must not carry out an activity that causes, or is likely to cause
                              environmental harm unless the person takes all reasonable and practicable measures to prevent or
                              minimise the harm”.

                              The Act requires that appropriate action be taken to report that environmental harm is occurring or has
                              the potential to occur, unless the harm is authorised under an environmental protection policy, an
                              environmental management program, a development approval, or an environmental protection order.
                              This is known as the “Duty to Notify”. Failure to fulfil this duty is an offence and may result in prosecution.
                      1.4     DMP objectives
                              The objectives of the DMP are to:

                              1.   Describe the dewatering methodology, groundwater treatment, monitoring and reporting
                                   procedures to be employed at the site during dewatering activities.

                              2.   Provide effective management procedures to prevent environmental harm resulting from the
                                   discharge of extracted groundwater from the site.
                      1.5     Scope of work
                              To achieve the investigation objectives, the following scope of work was undertaken:

                                  A desktop study including:

                                   1. Review of the development proposal and proposed shoring/dewatering designs.
                                   2. Review of geology and soil maps for the area.
                                   3. Search of groundwater bores licensed by the Queensland Government within a 200 m radius of
                                      the site.
                                   4. Review of relevant existing reports and groundwater data from the local area.
                                   5. Review of current aerial photographs of the site and surrounds.

                                  The preparation of this Dewatering Management Plan suitable for submission to Noosa Shire
                                   Council (NSC), if required.




                        ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                            Page 2




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 7

                                                                                                                          ADG Consulting Pty Ltd


                      2        Site characteristics
                      2.1      Property description
                               The site comprises a single parcel of land described as Lot 0 on BUP10936, situated at 7 Noosa Parade,
                               Noosa Heads, Queensland. The site is rectangular in shape with an area of 1,120m2 and is shown in Figure
                               1, Appendix A.
                      2.2      Surrounding environment
                               The surrounding environment and land use is described briefly in Table 1.

                               Table 1 Surrounding land use and environment

                                       Direction                                                Environment

                                         North            Noosa Parade, then residential properties, then Noosa River

                                                          Noosa Park, then Noosa River, then Noosa Parade, then high‐density properties
                                          East
                                                          (hotels).

                                         South            Noosa River, then residential properties, then Witta Circuit.


                                         West             Residential property, then Witta Circle, then residential/holiday properties.

                      2.3      Topography
                               The site is considered to be relatively level based on its existing use as a residential property.
                      2.4      Geology & soils
                               The surface geology at the site is mapped as being Anthropocene aged man‐made deposits (‘Qhh‐QLD’)
                               comprising gravel, sand and silt; man‐made deposits generally associated with land‐fill or mining (tailings,
                               dumps and rehabilitated areas. The dominant rock type is identified as stratified volcanic and
                               metamorphic as referenced through detailed surface geology (accessed via Queensland Globe online, 17
                               April 2025).

                               The site is mapped within the Atlas of Australian Soils (‘Ca10’, accessed via Queensland Globe online, 17
                               April 2025) as Podzols soils described as well‐drained, bleached A2 horizon and brown or reddish brown
                               B horizon. These soils are generally described as undulating to rolling roughly parallel old dune system.

                               The Acid Sulfate Soils (ASS) 1:100,000 Tweed Heads to Teewah Overlay map categorises the site as ‘SDL’
                               or ‘Acid Sulfate on Disturbed Land’, indicating that the site is likely to contain acid sulfate soils (and
                               potential exists that partial or full treatment may have been undertaken), however the type and depth
                               to ASS is not defined (accessed via Queensland Globe online, 17 April 2025).
                      2.5      Hydrogeology
                               A search of groundwater bores licensed by the Queensland Government was conducted on 17 April 2025
                               via the Queensland Globe online database. The search identified no (0) licensed bores within a 200 m
                               radius of the site and is shown in Appendix B.

                               Based on the local geology and topography, and the site’s proximity to the Noosa River, the inferred
                               groundwater flow is to the south toward the Noosa River. Groundwater beneath the site is expected to
                               be hydraulically connected to the Noosa River, therefore saline groundwater conditions are anticipated,
                               and additional saltwater intrusion is likely to occur during dewatering. Any changes to the salinity levels
                               in the groundwater are anticipated to rapidly return to existing conditions following the completion of
                               dewatering and subsequent rainfall/alluvial percolation.




                          ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                             Page 3




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 8

                                                                                                                    ADG Consulting Pty Ltd


                      3        Previous investigations
                               This DMP is based on site specific information sourced from the following documentation provided to
                               ADG by Seymour Group:

                                    PTG Consulting. February 2025. Geotechnical Investigation Report – Proposed Residential
                                     Development 7 Noosa Parade, Noosa Heads. PTG/01608 – 001 – Rev 0.
                                    PTG Consulting. April 2025. Acid Sulfate Soil Investigation Management Plan – Proposed Residential
                                     Development 7 Noosa Parade, Noosa Heads. PTG/01608 – 002 – Rev 0.
                                    SCG Consulting. May 2025. Operational Works for Residential Development Lot CP on BUP 10936
                                     No. 7 Noosa Pde, Noosa Heads. Rev issued 1 May 2025. (see Appendix C).
                                    Bureau Proberts. April 2025. Drawing. Proposed Residence 7 Noosa Parade. 24048 – AR 00.01 –
                                     Rev 4.

                               A brief discussion of relevant soil and groundwater conditions is provided below.
                      3.1      PTG Consulting 2025
                               A Geotechnical and Acid Sulfate Soil (ASS) Investigation was undertaken on the site by PTG Consulting in
                               January 2025 (report dated February 2025). The following sections summarise the relevant information
                               from the report provided.
                      3.1.1 Soils
                               During the Geotechnical and ASS investigation four (4) boreholes (BH1 to BH4) were drilled to depths of
                               4.5 m below ground level (bgl) using solid flight auger with a specialised 4WD truck‐mounted drill rig. The
                               sub‐surface soil profile comprised a silty sand/ sand to the termination depth of 4.5 mbgl. The sands
                               were described as generally medium dense to dense, with some loose material encountered near the
                               surface.

                               A total of seventy‐two (72) soil samples were recovered from boreholes (BH1 to BH4) at 0.25 m intervals
                               from between 0.0 m and 4.5 m in depth. Based on field screening results, a total of eighteen (18) samples
                               were selected for laboratory analysis by the Chromium Reducible Sulfur suite (CRS). The analysed samples
                               reported the presence of low to high levels of potential acid sulfate soils (PASS) throughout the soil profile
                               with titratable actual acidity (TAA) concentrations ranging from <10 to 128 moles H+/tonne (9 of 18
                               samples reporting above the action criteria of 18 moles H+/tonne). Nine (9) samples reported oxidisable
                               sulfur concentrations ranging from 0.066 to 0.194 %S which were at or above the relevant action criterion
                               of 0.03 %S, indicating the presence of potential acid sulfate soils (PASS) within the soil profile to
                               approximately 4.5 m (extent of investigation by PTG Consulting).

                               PTG Consulting estimated, approximately 800 tonnes of soil will be disturbed below RL 5 m AHD. With
                               the highest recorded net acidity value of 128 mol H+/t, a ‘Very High Level of Treatment’ is required. The
                               results indicate soils contain high levels of existing and potential acidity and will therefore require
                               management of actual acid sulfate soils. A maximum liming rate of 10 kg CaCO3/m3 was calculated for
                               the site.

                               It is noted that the ASS investigation did not provide assessment of deeper soils (>4.5 mbgl) or cone of
                               depression that will be created during dewatering. Given ADG’s previous experience with ASS and
                               dewatering operations in the local area, ASS conditions are likely to become more significant with
                               increasing depth and rewetting of the soil structure in the cone of depression following commencement
                               of dewatering.
                      3.1.2 Groundwater
                               During the geotechnical and acid sulfate soil investigation, no groundwater was reported as being
                               encountered during the drilling of the boreholes (PTG Consulting, 2025). PTG Consulting notes, that
                               groundwater levels can be perched and fluctuate seasonally and during heavy rainfall events. Due to the
                               site sites close proximity to the tidal Noosa River and the permeable natural of the soils encountered,
                               increases the likelihood of groundwater fluctuations. In addition, ADGs recent previous experience in the
                               locality has generally identified standing groundwater at or around RL 0.5 to 1.0 mAHD, and given the

                          ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                          Page 4




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 9

                                                                                                               ADG Consulting Pty Ltd

                              sandy subsurface profile and proximity to the tidal canal network associated with Noosa Inlet these
                              relative groundwater levels should be expected, with higher levels during or following periods of intense
                              or extended rainfall.
                      3.2     Groundwater quality
                              No site specific groundwater investigation was undertaken as part of the Geotechnical and ASS
                              Investigations undertaken by PTG Consulting. However, ADG is of the opinion that localised monitoring
                              well data can often be misleading and does not always accurately represent the properties of the
                              groundwater that will be extracted and treated from the entire site and local surrounds during
                              dewatering. Therefore, based on numerous groundwater investigations and dewatering monitoring
                              projects that have been undertaken by ADG throughout the Noosa Coast and nearby sites in recent years.
                              Our understanding of the groundwater quality in the region is provided below:
                                  Groundwater is generally mildly acidic to neutral, with pH levels ranging from approximately 5.5 to
                                   6.5 and electrical conductivity ranging from brackish to saline between 2,000 µS/cm to
                                   48,000 µS/cm. Groundwater pH has the potential to reduce (become more acidic) following
                                   oxidisation of PASS as dewatering progresses, particularly if re‐wetting of the soils occurs.

                                  Dissolved oxygen levels in static groundwater typically range from approximately 35 – 40 %
                                   saturation.

                                  The groundwater associated with indurated sand strata is moderately to highly turbid as a result of
                                   staining and organic content.

                                  Concentrations of dissolved metals are typically below the available marine water trigger values
                                   (MWTV’s) in ANZG (2018) which supersedes ANZECC/ARMCANZ (2000) for the receiving waters,
                                   however elevated levels of aluminium and particularly iron are expected in the untreated
                                   groundwater and have the potential to increase following oxidisation of PASS as dewatering
                                   progresses or as a result of existing acidic groundwater conditions.

                                  Given the location and previous use of the site, groundwater impacts resulting from site
                                   contamination are not anticipated.

                              A groundwater investigation will be undertaken at the commencement of dewatering as described in
                              Section 6.5.2 of this report. This assessment will be representative of the groundwater being extracted
                              and treated from the entire site, as opposed to localised monitoring well data which is often misleading.
                              Based on previous experience with dewatering in the area, ADG expects the groundwater to require
                              treatment to increase pH and dissolved oxygen levels, as well as reduce turbidity, suspended sediments
                              and dissolved metal concentrations prior to being discharged to the stormwater system.




                        ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                      Page 5




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 10

                                                                                                                ADG Consulting Pty Ltd


                      4        Water quality objectives
                      4.1      Receiving environment
                               It is proposed to discharge extracted groundwater directly over the revetment wall into the adjacent
                               canal network (Noosa River) immediately south of the site (to be confirmed upon commissioning to site).
                               The waterway in this location is mapped as a tidal canal, harbour or marina (DES, 2022). The receiving
                               environment is connected to the Noosa River which ultimately connects to the Pacific Ocean. The
                               following section establishes water quality objectives (WQOs) to ensure that the environmental values
                               of the receiving waters are protected and maintained.
                      4.2      Development of water quality objectives
                               WQOs have been developed to support and protect the designated environmental values (EVs) for the
                               receiving environment. The WQOs are based on a moderately disturbed level of protection for estuarine
                               (marine) waters in tidal canals, constructed estuaries, marinas and boat harbours. The WQOs have been
                               developed with reference to the following guideline documents:

                                    Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2018 (ANZG, 2018).
                                     Australian and New Zealand Governments and Australian state and territory governments, Canberra
                                     ACT, Australia, which supersedes Australian and New Zealand Guidelines for Fresh and Marine
                                     Water Quality, Australian and New Zealand Environment and Conservation Council and Agriculture
                                     and Resource Management Council of Australia and New Zealand (ANZECC/ARMCANZ). 2000.

                                    Environmental Protection (Water & Wetland Biodiversity) Policy 2019. Queensland Government.
                                     2019.

                                    Guidelines for Managing Risks in Recreational Water. Australian Government, National Health and
                                     Medical Research Council (NHMRC). 2008.

                                    Noosa River environmental values and water quality objectives. Department of Environment and
                                     Science (DES). 2022.

                                    Queensland Water Quality Guidelines, Version 3, September 2009. 2013. DEHP.

                               The Australian and New Zealand Guidelines for Fresh and Marine Water Quality by the Australian and
                               New Zealand Environment and Conservation Council and Agriculture and Resource Management Council
                               of Australia and New Zealand (ANZECC/ARMCANZ, 2000), has undergone review, with the publication of
                               the 2018 version. The revised Australian and New Zealand Guidelines for Fresh and Marine Water Quality
                               2018 is a joint initiative between the Australian and New Zealand Governments and Australian state and
                               territory governments (ANZG, 2018) and supersedes the ANZECC/ARMCANZ 2000 publication. Where
                               ANZECC/ARMCANZ (2000) is referenced, the relevant sections are still relevant and consistent with the
                               updated ANZG 2018 publication, as referenced in the ANZG 2018 publication.

                               The Queensland Water Quality Guidelines 2009 (DEHP, 2013) was made pursuant to the provisions of the
                               Environmental Protection (Water) Policy 1999 (the EPP(Water)), which is a subordinate legislation under
                               the Environmental Protection Act 1994 and was developed as the State response to the
                               ANZECC/ARMCANZ (2000) Guidelines. This has been further superseded by EPP (Water and Wetland
                               Biodiversity) 2019 which provides a framework for:
                                   Identifying environmental values for Queensland waters, and deciding the water quality objectives
                                    to protect or enhance those environmental values; and

                                   Including the identified environmental values and water quality objectives under Schedule 1 of the
                                    EPP (Water).
                               WQOs are long term goals for surface water quality management. They are indicators established for
                               receiving waters to support and protect the designated Environmental Values (EVs) for those waters. DES
                               (2022) describes that for slightly to moderately disturbed waters, the guideline values should be
                               compared with the median of values at a test site, whilst ANZG (2018) stresses that the aquatic ecosystem

                          ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                     Page 6




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 11

                                                                                                                                    ADG Consulting Pty Ltd

                              guideline values are triggers to further action, are inherently conservative, and that the response to non‐
                              compliance should match the magnitude and impacts (if any) of the exceedance.

                              Section 5 (Guidelines for recreational water quality and aesthetics) of the previous ANZECC/ARMCANZ
                              (2000) Guidelines (per section 5.2 thereof) was superseded by the Guidelines for Managing Risks in
                              Recreational Water in 2008 (NHMRC, 2008). Therefore, a reference to the ANZECC/ARMCANZ
                              (2000)/ANZG (2018) Guidelines is by association and extension a reference to the current 2008 NHMRC
                              Guidelines. The 2008 NHMRC Guidelines contain no criteria for aluminium, and only includes an aesthetic
                              criterion for iron – noting this is an aesthetic criterion derived from the Australian Drinking Water
                              Guidelines on the basis of ingesting 2L of the recreational water solution per day. ANZECC/ARMCANZ
                              (2000) Section 5.2.3.3, notes that as a general guideline, under Toxic Chemicals, ‘Higher concentrations
                              of toxicants may be tolerated occasionally if it assumed that no person will ingest more than a maximum
                              of 100 mL water during a normal swimming session (NHMRC 1990) compared with 2L/d for potable
                              water’, and Section 3.1.1.3, under Risk based approach of the guidelines, ‘The guideline trigger values are
                              based on bioavailable concentrations, and hence are relatively conservative when compared with total
                              concentrations in the field, so the use of the decision frameworks will increase guideline concentrations
                              in most cases’. Therefore, any chemical toxicant trigger values would require reassessment and likely
                              increase upwards of any ANZECC/ARMCANZ (2000)/ANZG (2018) Guideline trigger values due to the
                              slightly to moderately disturbed nature (and thereby reduced sensitivity) of the receiving waters.

                              Regardless of the WQOs adopted in this DMP, the General Environmental Duty set out in the EP Act is
                              paramount, which requires that “a person must not carry out an activity that causes or is likely to cause
                              environmental harm unless the person takes all reasonable and practicable measures to prevent or
                              minimise the harm”.
                      4.3     Proposed water quality objectives
                              The proposed water quality objectives that have been developed for the discharge of extracted
                              groundwater from the site are provided in the Tables below. All water discharged from the site must
                              comply with the discharge criteria provided in Table 2. Additionally, the receiving water quality within a
                              20m radius of the discharge point (the receiving waters mixing zone) shall comply with the receiving
                              water criteria provided in Table 3. Receiving waters data will be assessed against background monitoring
                              data if non‐compliant results are obtained at the receiving waters monitoring location.

                              Table 2 Discharge criteria

                                                         Parameter                                                            Criteria

                               Physico‐chemical

                               pH (pH units)                                                                                6.5 – 8.51,2

                               Dissolved oxygen (% saturation)                                                                 >802

                               Suspended solids (mg/L)                                                                         <501,2

                               Turbidity (NTU)                                                                                 <502

                               Litter/visible plumes                                                  None visible at the point of discharge or in a waterway

                               Total metals (µg/L)

                               Aluminium                                                                                       2003

                               Iron                                                                                            3003

                              Table notes:

                              1. QWQG 2009 (2013) Refer to Table 8.2.1. Summary of design objectives for management of stormwater quality and flow – construction
                                 phase of development in Queensland.
                              2. Typical discharge criteria recognised throughout QLD.
                              3. SCC (2008). Water release criteria as specified in the SCC Manual for Erosion and Sediment Control, Chapter 6.




                        ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                                               Page 7




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 12

                                                                                                                                           ADG Consulting Pty Ltd

                              Table 3 Receiving waters criteria

                                                           Parameter                                                              Criteria

                               Physico‐chemical

                               pH (pH units)                                                                                     7.8 – 8.31

                               Dissolved oxygen (% saturation)                                                                   85 – 1051

                               Suspended solids (mg/L)                                                                              ≤141

                               Turbidity (NTU)                                                                                      ≤61

                               Dissolved metals (µg/L)

                               Aluminium                                                                           No relevant ANZG criterion available

                               Arsenic                                                                            No relevant ANZG criterion available*

                               Cadmium                                                                                              5.52

                               Chromium                                                                                             4.42

                               Copper                                                                                               1.32

                               Iron                                                                                No relevant ANZG criterion available

                               Lead                                                                                                 4.42

                               Nickel                                                                                               702

                               Zinc                                                                                                  82

                               Mercury                                                                                              0.42

                               Total metals (µg/L)

                               Aluminium                                                                                   No ANZG criteria / 2003

                               Iron                                                                                        No ANZG criteria / 3003

                              Table notes:

                              1. DES (2022). Noosa River environmental values and water quality objectives (moderately disturbed – Noosa River – canals and marinas).
                              2. ANZG (2018) – Marine water trigger values for 95% species protection (Supersedes ANZECC/ARMCANZ (2000)).
                              3. Criteria subject to expected condition in Development Application (DA) notice by Noosa Shire Council.

                              Although ADG has not been provided a copy of any DA notice or conditions for the proposed development
                              (not yet available at the time of writing), based on previous dewatering projects in the Noosa Coast
                              Region it is expected that total iron and aluminium concentrations as listed in Error! Reference source
                              not found. (above) are likely to be conditioned by Noosa Shire Council for compliance. It should be noted
                              that these concentrations are considered to be onerous with respect to the risk‐based (worst‐case)
                              bioavailable trigger value criteria contained in ANZG 2018 & ANZECC/ARMCANZ (2000) for marine water
                              (moderately disturbed) 95% species protection, and are likely to be difficult to achieve given the
                              groundwater conditions encountered in the locality on previous dewatering projects on the Noosa Coast.

                              Prior to discharge to the stormwater system or any waterway, discharges are to be tested to meet the
                              requirements of the ANZG 2018 & ANZECC/ARMCANZ (2000) Guidelines for Fresh and Marine Water
                              Quality. There is currently no chemical toxicant trigger value criteria available for total or dissolved (i.e.
                              bioavailable) concentrations of aluminium or iron for marine or estuarine waters under the Australian
                              and New Zealand Guidelines for Fresh and Marine Water Quality Guidelines (ANZG 2018 &
                              ANZECC/ARMCANZ 2000 – i.e. ANZECC Guidelines) or the Guidelines for Managing Risks in Recreational
                              Waters (NHMRC 2008), with regards to managing environmental impacts to the waterway.

                              In addition, Section 5 (Guidelines for recreational water quality and aesthetics) of the ANZECC/ARMCANZ
                              (2000) Guidelines (per section 5.2 thereof) was superseded by the Guidelines for Managing Risks in
                              Recreational Water in 2008 (NHMRC, 2008). Therefore, a reference to the ANZECC/ARMCANZ (2000)
                              Guidelines is by association and extension a reference to the current 2008 NHMRC Guidelines. The 2008
                              NHMRC Guidelines contain no criteria for aluminium, and only includes an aesthetic criterion for iron –
                              noting this is an aesthetic criterion derived from the Australian Drinking Water Guidelines on the basis of

                        ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                                                    Page 8




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 13

                                                                                                              ADG Consulting Pty Ltd

                              ingesting 2L of the recreational water solution per day. ANZECC/ARMCANZ (2000) Section 5.2.3.3, notes
                              that as a general guideline, under Toxic Chemicals, ‘Higher concentrations of toxicants may be tolerated
                              occasionally if it assumed that no person will ingest more than a maximum of 100 mL water during a
                              normal swimming session (NHMRC 1990) compared with 2L/d for potable water’, and Section 3.1.1.3,
                              under Risk based approach of the guidelines, ‘The guideline trigger values are based on bioavailable
                              concentrations, and hence are relatively conservative when compared with total concentrations in the
                              field, so the use of the decision frameworks will increase guideline concentrations in most cases’.
                              Therefore, any chemical toxicant trigger values would require reassessment and likely increase upwards
                              of any ANZG 2018 &/or ANZECC/ARMCANZ (2000) Guideline trigger values due to the slightly to
                              moderately disturbed nature (and thereby reduced sensitivity) of the receiving waters.

                              In conditioning more onerous criteria, rather than the available marine chemical toxicant trigger value
                              criteria contained within the ANZG/ANZECC Guidelines, an unachievable constraint may be placed on the
                              development. This DMP has allowed for contingency measures to be incorporated into the treatment
                              and discharge system if required, including silt curtains to be installed within the receiving waterway
                              surrounding the discharge location, or further onsite treatment measures such as filtration, to prevent
                              and/or minimise as far as reasonably practicable the potential for release of suspended solid loads into
                              the broader receiving waterway.




                        ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                     Page 9




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 14

                                                                                                                   ADG Consulting Pty Ltd


                      5        Dewatering methodology
                      5.1      Basement excavation and shoring
                               Based on preliminary information provided by Seymour Group, existing ground levels within the
                               proposed basement footprint are approximately RL 2.4 m Australian Height Datum (AHD). Excavations to
                               facilitate the basement construction are proposed to extend to an approximate depth of 3.5 m below
                               existing ground level (bgl), corresponding to an approximate elevation of ‐1.1 mAHD. Localised deeper
                               excavations may also be required for other structural elements (i.e. lift pit and footings) across the site.
                               It is understood the excavation/basement perimeter will generally be stabilised using a contiguous secant
                               pile wall, except in proximity of the proposed pool on the northern side (facing the vacant parkland to
                               the north of the site) and as such will limit the potential for ground movement and instability of
                               surrounding lands, services and structures (refer to Appendix C).

                               Groundwater seepage was not encountered at the time of drilling to a depth of 4.5 mbgl during the
                               Geotechnical Investigations on the site in 205 (PTG Consulting, 2025). However, ADG notes that, typically,
                               the groundwater levels in the area are encountered at levels of approximately RL 0.5 m to RL 1.0 m.
                               Fluctuations of +/‐ 0.5 m are typically noted in the area. Groundwater levels are also likely to be subject
                               to fluctuations associated with the seasonal and climatic conditions, as well as tidal variations and
                               significant rainfall events.

                               It is expected that the development will include a ‘tanked’ basement to prevent the requirement for a
                               permanent dewatering facility at the site.
                      5.2      Groundwater extraction
                               Dewatering is anticipated to be undertaken using a series of 40 mm diameter PVC spears installed at
                               1.5 m intervals around the internal and external perimeter of the excavation. Alternatively, well point
                               dewatering may be appropriate within the internal face of the shoring wall. The final dewatering method
                               is subject to engagement of a shoring and dewatering contractor, as different contractors may specialise
                               in different methods of achieving the required dewatering drawdown. Preference should be given to
                               dewatering primarily on the internal face of the shoring wall, with preference for minimal dewatering
                               external to the shoring system to assist in minimising the extent of the cone of depression in the water
                               table (unless expressly required to limit hydrostatic force on the shoring system) and thereby limit
                               potential ground movement that may affect surrounding structures and services.

                               The basement excavation must be dewatered to a minimum of approximately 1.0 m below the deepest
                               point of excavation to allow construction to be undertaken in dry conditions. The water table (approx.
                               0.5 mAHD) is therefore expected to be lowered by at least 2.6 m in the locality of the basement
                               excavation footprint to a maximum of approximately ‐2.1 mAHD throughout the basement footprint.
                               Deeper localised dewatering may be required for the installation of a lift overrun pit and/or other
                               structural elements.

                               It is proposed that the development will include a ‘tanked’ basement to prevent the requirement for a
                               permanent dewatering facility at the site. Similarly, no permanent groundwater dewatering is proposed
                               or likely to occur as a result of the development, with all services and pipework proposed to be situated
                               above standing groundwater elevations (that is, at elevations above 0.5 mAHD) and subject to the
                               nominated hold points at Section 5.7. Where any deviation is proposed from this arrangement, all
                               pipework within the saturated zone, that outlets direct to waterways must be fitted with buried
                               headstocks at suitable intervals to prevent ongoing dewatering of groundwater along pipework bedding.
                      5.3      Extraction/discharge rates and volume
                      5.3.1 Dewatering extraction calculation based on subsurface soil profile
                               The dewatering extraction rate, area of influence and cone of depression has been estimated using the
                               Western Australian Department of Water and Environmental Regulation Cone of Depression Calculator.




                          ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                       Page 10




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 15

                                                                                                                   ADG Consulting Pty Ltd

                              The calculation results are based on the following parameters and known site‐specific conditions:
                                  Approximate length of excavation = 36 m
                                  Approximate width of excavation = 17 m
                                  Reduction in depth of groundwater across the excavation = 2.6 m (based on an approximate
                                   groundwater depth of 0.5 m AHD)
                                  Approximate depth of saturated thickness of unconfined aquifer = 10 m (conservative standardised
                                   approximation)

                              A conservative soil profile of fine to medium grained sands, has a hydraulic conductivity of approximately
                              8.2 m/day, or equivalent 0.0000949 m/sec (WA Calculator). The results of the calculation are shown in
                              Table 4 below, and provided in Appendix D.

                             Table 4 Dewatering extraction rate results

                                                           Output                                           Result

                                  Effective radius of pumping well (m)                                        14
                                  Dewatering radius of influence (m)                                          76
                                  Discharge rate (L/sec)                                                       8
                                  Discharge rate (L/hr)                                                     28,600
                                  Establishment of cone of depression (hours)                                102


                              Based on the above inputs, a groundwater flow rate of approximately 480 L/min or 28,600 L/hr has been
                              predicted for the development. Flow rates are predicted to be highest during initial drawdown of the
                              groundwater table within the basement excavation footprint and reducing to approximately 5 – 6 L/sec
                              following establishment of the cone of depression within the excavation. Flow rates may fluctuate due
                              to tidal variations, generally approximately ± 0.5 m, and will also be influenced by rainfall and surface
                              water collection within the basement excavation footprint noting the underlying predominantly sand
                              profile encountered during geotechnical investigations.

                              Regardless of the contractor employed, groundwater treatment systems should be installed with
                              capability for treating flow rates of up to 8 to 10 L/sec, as a contingency against higher than anticipated
                              flow rates exceeding the estimated 7 L/sec as a result of varying ground conditions across the extent of
                              excavation.

                              However, it should be noted that the WA Calculator provides a conservative assessment of inflows to an
                              excavation footprint based on area and depth but does not take account of the shoring wall, which will
                              inhibit lateral inflows to some extent. Also note that the cone of depression radius measure includes
                              water table depressions of 1 mm depth or more, so any significant depression of the water table is limited
                              to much closer to the dewatering spears or wells (generally within 3 to 10 m from the shoring wall in fine‐
                              medium grained sands, depending on density of the strata).
                      5.4     Dewatering duration
                              Dewatering will be necessary throughout the basement construction phase, which is expected to require
                              continual dewatering for approximately eight to twelve weeks. To minimise the potential impacts during
                              construction of short‐term dewatering, periods of active dewatering will be minimised as much as
                              possible. However, ADG notes that once active dewatering has commenced, dewatering will not be able
                              to be ceased until both: a) the basement hydrostatic uplift forces have been compensated to the
                              satisfaction of the consulting RPEQ engineer; and b) potential hydraulic loading on the external face of
                              the shoring system has been compensated to the satisfaction of the consulting RPEQ engineer and
                              shoring contractor.
                      5.5     Groundwater drawdown
                              Groundwater drawdown caused by dewatering has the potential to create settlement in unconsolidated
                              sediments and loose sands. It is noted that dilapidation reports for surrounding structures and services

                        ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                       Page 11




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 16

                                                                                                               ADG Consulting Pty Ltd

                              are proposed to be undertaken which were not supplied to ADG for the purposes of preparing this DMP
                              and are to be provided to Council separately from this DMP.

                              Groundwater drawdown may also oxidise potential acid sulfate soils within the cone of depression,
                              subsequently producing acidic groundwater conditions and mobilising heavy metals. Monitoring of the
                              extracted untreated groundwater will be undertaken to detect in‐situ oxidation of soils, as required and
                              at the frequencies stated in Section Error! Reference source not found.. Groundwater monitoring bores
                              for groundwater level gauging external to the excavation footprint are expected to be unable to be
                              established and monitored prior to and during construction on the site, due to limited space (SCG
                              Consulting Engineers).

                              Civil Engineering plans of the proposed development and basement arrangement are provided at
                              Appendix C.
                      5.6     Groundwater treatment
                              All extracted groundwater will be treated on‐site using available technologies prior to discharge to the
                              stormwater network. The following treatment measures (or similar depending on final dewatering
                              contractor selection) will be adopted, and will be installed and operational prior to the commencement
                              of dewatering:

                              1.   A groundwater pH buffering treatment system (primary treatment)
                              2.   A sedimentation tank to provide additional residence time and sedimentation (secondary
                                   treatment)
                              3.   A fine media filtration system designed for effective removal of heavy metals (tertiary treatment),
                                                                                                                          tertiar




                                   if required.

                              Details of the treatment systems and methodologies are provided in Section 6 of this report.

                              Note: Consideration should be taken regarding placement of treatment gear on site to enable easy
                              cleaning and maintenance throughout the dewatering phase for the project. Consider the potential
                              requirement for regular de‐sludging of sedimentation tank/s to suitable area onsite, if available (cost
                              minimisation).
                      5.7     Nominated Hold Points
                              In accordance with anticipated DA Conditions, nominated hold points to be enacted during construction
                              have been proposed to facilitate for certification by the suitably qualified person experienced with Acid
                              Sulfate Soils, as well as Council Development Engineer to ensure all possible avenues for continual
                              dewatering below permanent groundwater level, including around pipework bedding that outlet to
                              waterways, are appropriately sealed. The nominated hold points regarding dewatering for this project
                              are:
                              1. Prior to commencement of dewatering/initial pump out
                              2. At finished excavation level, prior to blinding layer application
                              3. External to basement service installation trench opening/s prior to backfilling.

                              The above nominated hold points are subject to confirmation by the consulting engineer, and liaison with
                              council representatives and the Site Manager.




                        ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                         Page 12




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 17

                                                                                                                   ADG Consulting Pty Ltd


                      6        Water quality management
                      6.1      Responsibility
                               The Site Manager is ultimately responsible for implementing the water quality management procedures
                               described in this DMP.
                      6.2      Operational policy
                               To prevent impacts on the receiving waters by effectively treating all extracted groundwater prior to
                               discharge from the site.
                      6.3      Performance criteria
                               The performance criteria for the discharge of extracted groundwater are the water quality objectives
                               provided in Table 2 and Table 3 in Section 4 of this report. Both the discharge and receiving waters (within
                               a 20 m radius of the stormwater discharge point) will be assessed against the WQOs to ensure that the
                               environmental values of the receiving waterway are maintained. Receiving waters data will also be
                               assessed against background monitoring data if non‐compliant results are obtained at the receiving
                               waters monitoring location.
                      6.4      Implementation strategy
                               All extracted groundwater will be treated on‐site using available technologies prior to discharge to the
                               stormwater network/canal. The treatment system described in Section 6.4.1 (below) will be adopted,
                               installed and operational prior to the commencement of dewatering.
                      6.4.1 Groundwater treatment systems
                               Subject to final appointment of shoring and dewatering contractors (who all generally have different
                               treatment systems), the following treatment systems are generally proposed for dewatered groundwater
                               treatment prior to discharge. Regardless of the contractor employed, groundwater treatment systems
                               should be installed with capability for treating flow rates of up to 8 to 10 L/sec, as a contingency against
                               higher than anticipated flow rates exceeding the estimated 7 L/sec as a result of varying ground conditions
                               across the extent of excavation or construction during wet weather.
                               Primary treatment
                               Groundwater treatment system/s will be installed to provide primary treatment of the extracted
                               groundwater. The system/s will provide the following capabilities:

                               1.    A pH treatment tank with 5 kL minimum capacity.
                               2.    Automated in‐line chemical dosing systems for the addition of buffering solutions and coagulants.
                               3.    A filtration system to reduce fine particulates and heavy metals (in particular iron and aluminium in
                                     both dissolved and total forms).
                               4.    Emergency response alarms for non‐routine situations.

                               Based on the estimated extraction rate, this system will provide approximately ten minutes contact time
                               during the initial chemical dosing, prior to secondary treatment using a sedimentation tank. Primary
                               treatment tank will be vertically stacked on the secondary treatment tank wherever practicable to
                               minimise site area required for groundwater treatment equipment.
                               Secondary treatment
                               A 23 kL sedimentation tank will be utilised to provide the necessary residence time for secondary
                               treatment of the groundwater prior to discharge to the stormwater system. Based on the estimated
                               groundwater extraction rate of approximately 28,600 L/hr (equivalent 480 L/min) from Section 5.3.1 of
                               this report, one sedimentation tank will provide approximately forty‐seven minutes retention time
                               following primary treatment of the extracted groundwater. This is considered to be sufficient secondary
                               settling / retention time based on extensive prior experience on other sites in similar ground conditions.




                          ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                       Page 13




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 18

                                                                                                                  ADG Consulting Pty Ltd

                              Tertiary treatment (if required) – may be required following initial testing of extracted groundwater
                              A specialised fine media filtration system designed for the effective removal of both total and dissolved
                              forms of heavy metals, with particular specific retention of iron and aluminium, will be utilised to remove
                              heavy metals from the secondary treated groundwater prior to discharge to the stormwater system. The
                              system will be capable of backflushing on manual or automated basis with retained concentrated heavy
                              metal suspended solids diverted to a backflush tank for further settling/thickening prior to offsite removal
                              by licenced liquid waste contractor for lawful disposal at a licenced disposal facility. This type of fine
                              media filtration treatment system is a forced‐flow system under pressure, and generally capable of
                              treating flow rates of up to 20 L/sec per filtration unit (therefore residence time is inconsequential to
                              treatment quality achieved).

                              Tertiary treatment will only be required if the required water quality is unable to be achieved following
                              primary and secondary stages of treatment. Subject to the results of field and laboratory testing during
                              the pre‐discharge monitoring event.
                      6.4.2 Dewatering strategy
                              The Site Manager, Dewatering Contractor and ADG Consulting will, if practicable, formulate a dewatering
                              strategy to ensure that the dewatering treatment system is sufficient to meet the requirements of the
                              project and that the necessary equipment can be accommodated within the site prior to the
                              commencement of dewatering.

                              Where the construction of the proposed development requires occupation of the road reserve (verge
                              area and/or road formation) for either short term or long term, a road reserve permit must be obtained
                              from Council prior to any occupation of the road reserve.
                      6.4.3 Initial pump‐out
                              Prior to, or as soon as practicable following the initial, discharge of any extracted groundwater to the
                              canal system, the following pre‐dewatering procedure will be undertaken:

                              1.   The basement area will be excavated down to the standing groundwater level.
                              2.   The initial dewatering discharge will be directed (via the treatment systems) into the excavation and
                                   allowed to infiltrate/recharge the aquifer. This process will provide initial clarification of the
                                   extracted groundwater as disturbed sediment loads are typically reduced following the initial pump‐
                                   out.
                              3.   Samples of the treated groundwater will be recovered and analysed for the parameters detailed in
                                   Table 2 and Table 3. Note: ADG must be provided reasonable notice in order for this step to be
                                   undertaken.
                              4.   The extracted groundwater will be directed, or recommended to continue discharge, into the
                                   stormwater system following confirmation that the water quality complies with the discharge
                                   criteria. Or other recommendations will be provided, as required.
                      6.5     Monitoring
                      6.5.1 Visual monitoring
                              Visual inspections of the site and dewatering equipment shall be undertaken daily by the Site Manager
                              to identify the following:
                                   Quantity of chemical product within the dosing system.
                                   Effective operation of all dewatering treatment equipment.
                                   Short circuiting of water around baffles and filter media in sediment tanks, where required to be
                                    installed.
                                   Visible hydrocarbon sheens and odours.
                                   Green blue or extremely clear water indicating high levels of dissolved aluminium.
                      6.5.2 Water quality monitoring
                              Water quality monitoring will be undertaken for the duration of dewatering activities at the site by a
                              suitably qualified, experienced and independent person. The monitoring will include analysis of the

                        ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                        Page 14




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 19

                                                                                                                ADG Consulting Pty Ltd

                              extracted groundwater, treated discharge water and off‐site monitoring in the receiving waters (in the
                              mixing zone within a 20 m radius of the discharge point). The exact location within the receiving waterway
                              (Noosa River) is to be confirmed. Background water quality monitoring of field parameters will also be
                              conducted during each sampling event, if applicable. Background samples will be recovered from the
                              Noosa River, either upstream or downstream from the receiving water location (tide dependant)
                              approximately 300 m upstream of the discharge point).

                              The proposed monitoring locations are shown in Figure 1, Appendix A and are subject to confirmation
                              following mobilisation of dewatering equipment to site.

                              Monitoring will be undertaken at the following frequencies:
                                 Daily monitoring of field parameters (pH, and turbidity) in the treated discharge water. Daily
                                  monitoring will be undertaken by a suitably trained site employee under the supervision of the Site
                                  Manager.

                                  Weekly monitoring of field parameters (pH, electrical conductivity, dissolved oxygen, temperature
                                   and turbidity) in the treated discharge water, receiving waters and background waters by ADG
                                   Consulting.

                                  Weekly laboratory analysis of treated discharge water and receiving waters for suspended solids,
                                   dissolved 0.45µm filterable metals (aluminium, arsenic, cadmium, chromium, copper, iron, lead,
                                   nickel, zinc and mercury) and total metals (aluminium & iron) by ADG Consulting.

                                  Pre‐discharge/initial monitoring of field parameters (pH, electrical conductivity, dissolved oxygen
                                   and oxidation‐reduction potential) in the extracted groundwater (prior to treatment) to assess
                                   changes in groundwater chemistry associated with PASS oxidation (sampled by ADG Consulting).

                                  Pre‐discharge/initial laboratory analysis of extracted groundwater (prior to treatment) for
                                   suspended solids, dissolved 0.45µm filterable metals (aluminium, arsenic, cadmium, chromium,
                                   copper, iron, lead, nickel, zinc and mercury), total metals (aluminium and iron) and for soluble
                                   sulfate and chloride to assess changes in groundwater chemistry associated with potential acid
                                   sulfate soil (PASS) oxidation (sampled by Environmental Consultant).

                                  Laboratory analysis of untreated groundwater would also be performed periodically (monthly) if
                                   changes in untreated groundwater pH levels are detected that may indicate local acidification, and
                                   to determine any changes in local groundwaters that may require further investigation of potential
                                   environmental impacts.

                              All samples will be recovered by a suitably qualified Environmental Scientist and submitted to a National
                              Association of Testing Authorities (NATA) accredited laboratory for analysis.
                      6.5.3 Monitoring responsibilities
                              The persons responsible for undertaking the compliance monitoring described in Section 6.5.2 above are
                              shown in Table 5.




                        ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                      Page 15




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 20

                                                                                                                          ADG Consulting Pty Ltd

                             Table 5 Monitoring responsibilities

                                                          Activity                            Frequency          Responsibility      Person


                                  Monitoring of field parameters in discharge water               Daily          Site Manager     Site Manager


                                  Monitoring of field parameters in discharge water,                             Environmental    Environmental
                                                                                                Weekly             Consultant
                                  receiving waters and background waters                                                            Consultant

                                  Laboratory analysis of samples recovered from discharge                        Environmental    Environmental
                                                                                                Weekly             Consultant
                                  water and receiving waters                                                                        Consultant

                                  Monitoring of field parameters in extracted groundwater   Initially, then as   Environmental    Environmental
                                  (pre‐treated)                                                  required          Consultant       Consultant

                                  Laboratory analysis of samples recovered from extracted   Initially, then as   Environmental    Environmental
                                  groundwater (pre‐treated)                                      required          Consultant       Consultant

                      6.6     Maintenance
                              The groundwater treatment systems must be regularly maintained. Maintenance must include:
                                  Regular cleaning and or replacement of the filter media within the filtration unit, where required to
                                   be installed.

                                     Regular removal of sediment from the sedimentation tank and backflush tank. The sediment must
                                      be either returned to the excavation pit for dewatering and bulking out with excavated material, or
                                      removed from the site by a licensed liquid waste contractor.

                                     Regular/required back flushing of fine media filtration treatment system.

                                     Regular check of the dosing system and top‐up of buffering solutions, oxidants and flocculants.
                      6.7     Reporting
                              Dewatering management procedures and monitoring results will be reviewed by ADG Consulting weekly
                              to ensure that the treatment procedures are effective, and that the receiving waters are not being
                              impacted by the discharge.

                              The following reporting procedures will be adopted:
                                  A summary report will be prepared upon completion of the initial pre‐discharge monitoring. The
                                   report will be submitted to the Site Manager, Dewatering Contractor and NSC (upon request).

                                     Weekly interim reports will be prepared upon receipt of laboratory data for each round of ongoing
                                      compliance monitoring. The interim reports will display all data obtained during the previous
                                      monitoring event, and provide comments and recommendations based on the results.

                                     A dewatering compliance report will be prepared on completion of the project (upon request).

                              The above reports will be prepared by the Environmental Consultant and provided to the Site Manager
                              and Dewatering Contractor as they become available. The reports will include all water quality results
                              and comparison to the WQOs, corrective actions and recommendations made to the Site Manager and
                              Dewatering Contractor during the monitoring period.

                              The Site Manager must keep records of complaints, volumes of chemicals used and treatment methods
                              employed. These records must be available on‐site at all times and submitted to NSC by the Site Manager
                              upon request.




                        ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                               Page 16




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 21

                                                                                                                 ADG Consulting Pty Ltd

                      6.8     Contingencies
                              If water quality monitoring indicates ongoing exceedances of the performance criteria, and the water
                              quality objectives for the receiving waters cannot be met, then corrective actions will be adopted as
                              necessary. Possible contingencies may include one or more of the following:

                                  Installation of additional sedimentation tanks to provide increased residence time and assist with
                                   the retention of precipitated iron hydroxides.

                                  Installation of additional flocculant and/or coagulant dosing systems to assist in precipitation of
                                   suspended sediments and/or heavy metals.

                                  Installation of activated carbon filtration or other additional fine media filtration to retain
                                   suspended sediments and/or other specific target contaminants.

                                  Install a floating sediment curtain/s around the stormwater termination point in the receiving
                                   waterway to prevent unsightly plumes and contain sediment and/or heavy metals for periodic
                                   removal (subject to approval by Council).

                                  Preventive and corrective actions shall be taken in the event that groundwater monitoring
                                   observations indicate that unexpected groundwater contamination has been encountered during
                                   dewatering. The most appropriate action(s) shall be dependent on the stage of construction and
                                   risk of adverse impacts to groundwater users and the receiving environment.

                                  Any modification to the dewatering system and pumping rates shall be in consultation with a
                                   suitably qualified scientist/geotechnical/engineer.

                                  Following heavy rainfall all ponded surfaces waters to meet discharge criteria (Table 3) prior to
                                   offsite discharge. Where discharge criteria not met, Site Manager to obtain approval from
                                   Dewatering Contractor regarding treating surface waters with treatment gear before offsite
                                   discharge.

                                  Pumping systems and shoring works to be maintained in fit for purpose state by Dewatering
                                   Contractor. In the event that dewatering equipment has failed and is likely to cause a significant
                                   impact on the environment, or surrounding properties (E.g. flooding) the Dewatering Contractor is
                                   to be contacted immediately. The Principal Contractor, in consultation with the Dewatering
                                   Contractor shall be responsible in rectifying the failure in a practicable time frame to minimise
                                   potential impacts.

                                  Equipment, spare parts, materials and tools necessary to manage aspects of the system/s which
                                   present a high risk of significant impacts in the event of failure (if any) shall be readily available.

                                  Construction vibrations could potentially cause settlement in the loose upper‐level sands, thereby
                                   damaging nearby structures founded in these strata. Prior to commencement of construction on
                                   site (including staged works), it is recommended that a detailed dilapidation survey be undertaken
                                   to establish the condition of all existing adjacent structures, roads and services.

                                  Accumulated sediments and heavy metals within the treatment system can be emptied to available
                                   area onsite and bulked out during earthworks or alternatively removed from site by a licenced waste
                                   removal contractor (sucker truck).

                                  Acid sulfate soils on site are to be managed in accordance with a site based ASSMP.




                        ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                        Page 17




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 22

                                                                                                                   ADG Consulting Pty Ltd


                      7        Noise & odour management
                      7.1      Responsibility
                               The Site Manager is responsible for ensuring the appropriate management of noise and odour during
                               dewatering operations.
                      7.2      Operational policy
                               To minimise noise and odour emissions generated from the site during dewatering.
                      7.3      Performance criteria
                               The appropriate criteria to measure the performance of dewatering management at the site are provided
                               below.

                               1.    No noise or odour related complaints received from neighbouring residents or the community.
                               2.    No degradation of air quality due to fumes or odours emanating from the dewatering process.
                      7.4      Implementation strategy
                               Noise and odour emissions will be managed as described in the following sections.
                      7.4.1 Noise
                               All dewatering equipment must be operated appropriately and maintained in good working order. All
                               dewatering systems and plant must be fitted with the appropriate noise reduction equipment to comply
                               with the performance criteria. Non‐complying dewatering plant will be replaced or repaired as necessary.

                               It is proposed to employ noise mitigation strategies including use of electric pumps and dewatering
                               systems rather than diesel powered equipment. Noise attenuation blankets and screens may be installed
                               around noise generating dewatering pumps and equipment where practicable, if required. Noise
                               monitoring equipment (unattended) will be installed by the site manager prior to commencement and
                               monitored for the duration of dewatering, if required.
                      7.4.2 Odour
                               All dewatering plant must be fitted with the appropriate emission reduction devices. Where practicable,
                               all dewatering plant will be sealed to prevent the release of odours to the atmosphere. Fine mist odour
                               control sprays will be applied to reduce offensive odours if complaints are received from neighbouring
                               residents.
                      7.5      Monitoring
                               An inspection of the site and dewatering equipment shall be undertaken daily by the Site Manager to
                               identify the following:
                                   Excessive noise being generated by the dewatering systems and plant.
                                   Strong or offensive odours being generated by the dewatering equipment and/or extracted
                                    groundwater.

                               If required by Council, noise monitoring equipment (unattended, continuous logging) may need to be
                               installed by the Site Manager prior to commencement and monitored for the duration of dewatering.
                               The Environmental Protection (Noise) Policy 2019 (EPP(Noise)) identifies specific acoustic quality
                               objectives (noise criteria) to assist in preventing significant impacts on noise sensitive receptors and as a
                               guide to long‐term acoustic quality for sensitive receptors. The primary EPP(Noise) criteria relevant to
                               this investigation is outside a dwelling (i.e. adjacent dwellings), which should not have noise at levels in
                               the daytime or evenings greater than 50dB(A) LAeq, adj,1hr. This means that noise levels in the receiving
                               environment outside of nearby dwellings (i.e. on balconies) should not exceed an equivalent sound
                               energy as would be received from a one hour continuous sound of 50 decibels on the A‐weighted scale
                               (adjusted for tonal character perceptible by the human ear).

                               While this report has not been generated for the purpose of assessing compliance with the requirements
                               of workplace health and safety legislation, it is noted that a person conducting a business or undertaking

                          ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                        Page 18




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 23

                                                                                                              ADG Consulting Pty Ltd

                              must ensure that workers are not exposed to noise that exceeds the exposure standard for noise. The
                              exposure standard for noise is defined in the Work Health & Safety Regulation 2011 (QLD) as LAeq,8h of
                              85 dB(A) or an LC,peak of 140 dB(C). As such, it is considered appropriate to adopt these exposure
                              standards to assess average and peak noise generated at the site with the potential to affect exposure
                              levels of nearby sensitive receptors (noting there will be some attenuation between source and receptors
                              and actual noise experienced by receptors would need to be measured at the receptor location).
                      7.6     Reporting
                              The Site Manager must keep records of complaints, monitoring records (including continuous noise
                              monitoring data, where required to be monitored), and corrective and preventive actions/methods
                              employed for noise abatement. These records must be available on‐site at all times and submitted to NSC
                              by the Site Manager upon request.
                      7.7     Contingencies
                              If noise levels consistently exceed the performance criteria, temporary acoustic barriers will be
                              constructed around the offending dewatering systems and plant. Odour control sprays will be applied as
                              necessary to mask odour emissions if complaints are received from neighbouring residents. This may
                              include the direct injection of deodorisers to the groundwater treatment system.




                        ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                    Page 19




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 24

                                                                                                                  ADG Consulting Pty Ltd


                      8        Limitations
                               ADG Consulting Pty Ltd (ADG) has prepared this report for Seymour Group in accordance with the agreed
                               scope of work. The services performed by ADG have been conducted in a manner consistent with the
                               normal level of care and expertise exercised by members of the environmental consulting profession. No
                               other warranty or guarantee, expressed or implied, is made as to the professional advice included in this
                               report.

                               This report is solely for the use of Seymour Group and ADG accepts no responsibility for the use of any
                               part of this report for any other purpose or by third parties, as it may not contain sufficient information
                               for the purposes of other parties or users. This report must only be presented in full, and may not be used
                               for any other objective, except where prior written approval is obtained from ADG. This report does not
                               comment on legal obligations, as legal advice can only be given by qualified legal practitioners.

                               The information contained in this report is provided to minimise potential impacts on the receiving
                               environment, however implementation of the described management procedures does not guarantee
                               that the objectives will be achieved.

                               The information contained in this report is considered to be accurate at the date of issue. Subsurface
                               conditions, including contaminant concentrations can change in space and time, either through natural
                               processes or by the accidental or intentional addition of contaminants to a site. Where conditions
                               encountered subsequently at the site are significantly different from those reported herein, ADG must
                               be notified and be provided the opportunity to review the conclusions and recommendations of this
                               report.




                          ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                      Page 20




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 25

                                                                                                             ADG Consulting Pty Ltd


                      9        References
                               ANZECC/ARMCANZ. 2000. Australian and New Zealand Guidelines for Fresh and Marine Water Quality.
                               Australian and New Zealand Environment and Conservation Council and Agriculture and Resource
                               Management Council of Australia and New Zealand.

                               ANZG. 2018. Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2018. Australian
                               and New Zealand Governments and Australian state and territory governments, Canberra ACT, Australia.

                               Bureau Proberts. April 2025. Drawing. Proposed Residence 7 Noosa Parade. 24048 – AR 00.01 – Rev 3.
                               Bureau Proberts. 2025.

                               DEHP. 2013. Queensland Water Quality Guidelines 2009, Version 3. Department of Environment and
                               Heritage Protection. Brisbane, Queensland, Australia.

                               DES. 2022. Noosa River environmental values and water quality objectives. Department of Environment
                               and Science. Brisbane, Queensland, Australia.

                               DES. 2018. Monitoring and Sampling Manual 2018, Version 2 July 2018. Department of Environment and
                               Heritage Protection. Brisbane, Queensland, Australia.

                               Government of Western Australia. 2025. Cone of Depression calculator. Department of Water and
                               Environmental Regulation. Accessed 29 April 2024, <https://www.wa.gov.au/service/environment/cone‐
                               of‐depression‐calculator>.

                               NHMRC. 2008. Guidelines for Managing Risks in Recreational Water. Australian Government, National
                               Health and Medical Research Council.

                               PTG Consulting. February 2025. Geotechnical Soils Investigation Report, Proposed Residential
                               Development, 7 Noosa Parade, Noosa Heads. PTG/01608 – 001 – Rev 0. PTG Consulting. 2025.

                               PTG Consulting. April 2025. Acid Sulfate Soil Investigation Management Plan, Proposed Residential
                               Development, 7 Noosa Parade, Noosa Heads. PTG/01608 – 002 – Rev 0. PTG Consulting. 2025.

                               QLD Government. 2019. Environmental Protection (Water & Wetland Biodiversity) Policy. Queensland
                               State Government.

                               SCG Consulting. May 2025. Operational Works for Residential Development Lot CP on BUP 10936 No. 7
                               Noosa Pde, Noosa Heads. Rev issued 1 May 2025. (see Appendix C).




                          ADG1777.25 Dewatering Management Plan_Rev0_01.05.25                                                Page 21




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 26

                                                                                                               ADG Consulting Pty Ltd




                              Appendix A:          Figures
                                                   Figure 1. Site location and proposed monitoring locations




                        ADG1777.25 Dewatering Management Plan_Rev0_01.05.25




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 27

Figure 1 - Site Location and Proposed Monitoring Locations (to be confirmed)                                                               A product of

Lot 0 on BUP10936, 7 Noosa Parade, Noosa Heads, Queensland.
26°23'7"S 153°4'60"E                                                            26°23'7"S 153°5'33"E




                                                                                                            Legend located on next page




                                                                                                                                           0              50 metres
                                                                                                                                               Scale: 1:3074

                                                                                                                                              Printed at: A3
                                                                                                                                         Print date: 29/4/2025
                                                                                                                               Not suitable for accurate measurement.
                                                                                                                            Projection: Web Mercator EPSG 102100 (3857)
                                                                                                        For more information, visit https://qldglobe.information.qld.gov.au/help-info/Contact-
                                                                                                                                                 us.html
                                                                                                       Includes material © State of Queensland 2025. You are responsible for ensuring that
                                                                                                       the map is suitable for your purposes. The State of Queensland makes no
                                                                                                       representation or warranties in relation to the map contents and disclaims all liability.
                                                                                                       If imagery is displayed, imagery includes material © CNES reproduced under license
                                                                                                       from Airbus DS, all rights reserved © 21AT © Earth-i, all rights reserved, © Planet Labs
                                                                                                       PBC, 2023




                                                                                                        Department of Natural Resources and Mines, Manufacturing, and Regional
26°23'30"S 153°4'60"E                                                          26°23'30"S 153°5'33"E                            and Rural Development

Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 28

Figure 1 - Site Location and Proposed Monitoring Locations (to be confirmed)
Lot 0 on BUP10936, 7 Noosa Parade, Noosa Heads, Queensland.
      Legend                                                                       Attribution



                                                                               Includes material © State of Queensland (Department of Resources); ©
        Places: My Places(1)              Tunnels                              Commonwealth of Australia (Geoscience Australia); © 21AT, © Earth-i, all rights
                                                                               reserved, 2025.
                My Place 1
                                                                               © State of Queensland (Department of Resources) 2023
                Site Discharge
                                                                               © State of Queensland (Department of Natural Resources and Mines,
                Receiving Water
                                                                               Manufacturing and Regional and Rural Development) 2025
                Background Water (tide
                                                                               © State of Queensland (Department of Resources) 2024
                dependent)
                Background Water (tide                                         © State of Queensland (Department of Natural Resources and Mines,
                                                                               Manufacturing and Regional and Rural Development) 2024
                dependent)

        Railway stations


        Railways


        Roads and tracks
                Motorway

                Highway

                Secondary

                Connector

                Local

                Restricted Access Road

                Mall

                Busway

                Bikeway
                Restricted Access
                Bikeway
                Walkway
                Restricted Access
                Walkway
                Non-vehicular Track

                Track

                Restricted Access Track

                Ferry

                Proposed Thoroughfare

        Green bridges


        Bridges
Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 29

                                                                                              ADG Consulting Pty Ltd




                              Appendix B:          Licenced groundwater bore search results




                        ADG1777.25 Dewatering Management Plan_Rev0_01.05.25




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 30

Licensed DRDMW Bore Search (200 m radius)                                                                                             A product of

Lot 0 on BUP10936, situated at 7 Noosa Parade, Noosa Heads, Queensland.
26°23'1"S 153°4'51"E                                                       26°23'1"S 153°5'36"E




                                                                                                       Legend located on next page




                                                                                                                                  0                      100 metres
                                                                                                                                         Scale: 1:4211

                                                                                                                                        Printed at: A3
                                                                                                                                    Print date: 17/4/2025
                                                                                                                          Not suitable for accurate measurement.
                                                                                                                       Projection: Web Mercator EPSG 102100 (3857)
                                                                                                   For more information, visit https://qldglobe.information.qld.gov.au/help-info/Contact-
                                                                                                                                            us.html
                                                                                                  Includes material © State of Queensland 2025. You are responsible for ensuring that
                                                                                                  the map is suitable for your purposes. The State of Queensland makes no
                                                                                                  representation or warranties in relation to the map contents and disclaims all liability.
                                                                                                  If imagery is displayed, imagery includes material © CNES reproduced under license
                                                                                                  from Airbus DS, all rights reserved © 21AT © Earth-i, all rights reserved, © Planet Labs
                                                                                                  PBC, 2023




                                                                                                   Department of Natural Resources and Mines, Manufacturing, and Regional
26°23'33"S 153°4'51"E                                                     26°23'33"S 153°5'36"E                            and Rural Development

Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 31

      Legend                                                                 Attribution



                                                                         Includes material © State of Queensland (Department of Resources); ©
        Registered water bores             Roads and tracks              Commonwealth of Australia (Geoscience Australia); © 21AT, © Earth-i, all rights
                                                                         reserved, 2025.
        [RDMW and private]                     Motorway
                Artesian bore                                            © State of Queensland (Department of Natural Resources and Mines,
                                               Highway                   Manufacturing and Regional and Rural Development) 2024
                Artesian bore
                                               Secondary
                (abandoned but useable)                                  © State of Queensland (Department of Natural Resources and Mines,
                                               Connector                 Manufacturing and Regional and Rural Development) 2025
                Artesian bore
                (abandoned and                 Local                     © State of Queensland (Department of Resources) 2024
                destroyed)
                                               Restricted Access Road    © State of Queensland (Regional Development, Manufacturing and Water) 2022
                Artesian bore, ceased to
                flow                           Mall

                Artesian bore, ceased to       Busway
                flow (abandoned but
                                               Bikeway
                useable
                                               Restricted Access
                Artesian bore, ceased to
                                               Bikeway
                flow (abandoned and
                destroyed)                     Walkway

                Sub-artesian facility          Restricted Access
                                               Walkway
                Sub-artesian facility
                (abandoned but useable)        Non-vehicular Track

                Sub-artesian facility          Track
                (abandoned and
                                               Restricted Access Track
                destroyed)
                                               Ferry
                Surface water facility
                                               Proposed Thoroughfare
                Surface water facility
                (abandoned but useable)
                                           Railways
                Surface water facility
                (abandoned and
                destroyed)

        Places: My Places(1)
                My Place 1

                My Place 2

        Green bridges


        Bridges


        Tunnels


        Railway stations




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 32

                                                                              ADG Consulting Pty Ltd




                              Appendix C:          Drawings




                        ADG1777.25 Dewatering Management Plan_Rev0_01.05.25




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 33

                                       THE SITE




                                                                    Issue:




                                                                    SCG HOLDINGS PTY LTD T/A
                                                                                                         Unit 1/11 Project Ave,
                                                                                                         Noosa Heads
                                                                                                         Ph (07) 5455 5604
                                                                                                         email:[email protected]
                                                                                                         web:www.scg-engineers.com
                                                                                                         ABN 68 669 675 790




                                                                              Title:




                                                                           Project




                                                                           Date:               Drawn                Design

                                                                             Checked:          Drg No.                        Rev.




                                                  Rev. - 10.06.16
Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 34

                                                         Issue:




                                                                                  Unit 1/11 Project Ave,
                                                                                  Noosa Heads
                                                                                  Ph (07) 5455 5604




                                                         DEBUILD T/A
                                                                                  email:[email protected]
                                                                                  web:www.scg-engineers.com
                                                                                  ABN 40 098 481 899




                                                             Title:




                                                            Project




                                                            Date:       Drawn                Design

                                                             Checked:   Drg No.                        Rev.




                                       Rev. - 10.06.16
Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 35

                                                         Issue:




                                                         SCG HOLDINGS PTY LTD T/A
                                                                                              Unit 1/11 Project Ave,
                                                                                              Noosa Heads
                                                                                              Ph (07) 5455 5604
                                                                                              email:[email protected]
                                                                                              web:www.scg-engineers.com
                                                                                              ABN 68 669 675 790




                                                                   Title:




                                                                Project




                                                                Date:               Drawn                Design

                                                                  Checked:          Drg No.                        Rev.




                                       Rev. - 10.06.16
Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 36

                                                         Issue:




                                                         SCG HOLDINGS PTY LTD T/A
                                                                                              Unit 1/11 Project Ave,
                                                                                              Noosa Heads
                                                                                              Ph (07) 5455 5604
                                                                                              email:[email protected]
                                                                                              web:www.scg-engineers.com
                                                                                              ABN 68 669 675 790




                                                                   Title:




                                                                Project




                                                                Date:               Drawn                Design

                                                                  Checked:          Drg No.                        Rev.




                                       Rev. - 10.06.16
Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 37

                                                                                                    Cut/Fill Summary
                                                                                                    Name     Cut Factor Fill Factor2d Area   Cut            Fill                                                  Net
                                                                                                    VOLUME 1.000       1.000      867.32sq.m 2111.08 Cu. M. 43.22 Cu. M. 2067.85 Cu. M.<Cut>
                                                                                                    Totals                        867.32sq.m 2111.08 Cu. M. 43.22 Cu. M. 2067.85 Cu. M.<Cut>




                                                                                                                                                                                                                    1.73
                                                                                                                                                                                                                       1.




                                                                                                                                                                                       Issue:




                                                                                                                                                                                       SCG HOLDINGS PTY LTD T/A
                                       SITE PREPARATION, EARTHWORKS & COMPACTION                                                                                                                                                      Unit 1/11 Project Ave,
                                                                             DILAPIDATION REPORT:                                                                                                                                     Noosa Heads
                                                                                                                                                                                                                                      Ph (07) 5455 5604
                                                                                                                                                                                                                                      email:[email protected]
                                                                                                                                                                                                                                      web:www.scg-engineers.com
                                                                                                                                                                                                                                      ABN 68 669 675 790




                                                                                                                                                                                                 Title:




                                                                                                                                                                                              Project




                                                                                                                                                                                              Date:                         Drawn                Design

                                                                                                                                                                                                Checked:                    Drg No.                        Rev.




                                                                                                                                                                     Rev. - 10.06.16
Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 38

                                                         Issue:




                                                         SCG HOLDINGS PTY LTD T/A
                                                                                              Unit 1/11 Project Ave,
                                                                                              Noosa Heads
                                                                                              Ph (07) 5455 5604
                                                                                              email:[email protected]
                                                                                              web:www.scg-engineers.com
                                                                                              ABN 68 669 675 790




                                                                   Title:




                                                                Project




                                                                Date:               Drawn                Design

                                                                  Checked:          Drg No.                        Rev.




                                       Rev. - 10.06.16
Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 39

                                                         Issue:




                                                         SCG HOLDINGS PTY LTD T/A
                                                                                              Unit 1/11 Project Ave,
                                                                                              Noosa Heads
                                                                                              Ph (07) 5455 5604
                                                                                              email:[email protected]
                                                                                              web:www.scg-engineers.com
                                                                                              ABN 68 669 675 790




                                                                   Title:




                                                                Project




                                                                Date:               Drawn                Design

                                                                  Checked:          Drg No.                        Rev.




                                       Rev. - 10.06.16
Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 40

                                        RESIDENTIAL
                                       DEVELOPMENT




                                                                        Issue:




                                                                        SCG HOLDINGS PTY LTD T/A
                                                                                                             Unit 1/11 Project Ave,
                                                                                                             Noosa Heads
                                                                                                             Ph (07) 5455 5604
                                                                                                             email:[email protected]
                                                                                                             web:www.scg-engineers.com
                                                                                                             ABN 68 669 675 790




                                                                                  Title:




                                                                               Project




                                                                               Date:               Drawn                Design

                                                                                 Checked:          Drg No.                        Rev.




                                                      Rev. - 10.06.16
Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 41

                                                         Issue:




                                                         SCG HOLDINGS PTY LTD T/A
                                                                                              Unit 1/11 Project Ave,
                                                                                              Noosa Heads
                                                                                              Ph (07) 5455 5604
                                                                                              email:[email protected]
                                                                                              web:www.scg-engineers.com
                                                                                              ABN 68 669 675 790




                                                                   Title:




                                                                Project




                                                                Date:               Drawn                Design

                                                                  Checked:          Drg No.                        Rev.




                                       Rev. - 10.06.16
Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 42

                                        RESIDENTIAL    RESIDENTIAL
                                       DEVELOPMENT    DEVELOPMENT




                                        RESIDENTIAL
                                       DEVELOPMENT




                                                                                       Issue:




                                                                                       SCG HOLDINGS PTY LTD T/A
                                                                                                                            Unit 1/11 Project Ave,
                                                                                                                            Noosa Heads
                                                                                                                            Ph (07) 5455 5604
                                                                                                                            email:[email protected]
                                                                                                                            web:www.scg-engineers.com
                                                                                                                            ABN 68 669 675 790




                                                                                                 Title:




                                                                                              Project




                                                                                              Date:               Drawn                Design

                                                                                                Checked:          Drg No.                        Rev.




                                                                     Rev. - 10.06.16
Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 43

                                                                 RESIDENTIAL
                                                                DEVELOPMENT




                                                                                                 Issue:




                                                                                                 SCG HOLDINGS PTY LTD T/A
                                                                                                                                      Unit 1/11 Project Ave,
                                                                                                                                      Noosa Heads
                                                                                                                                      Ph (07) 5455 5604
                                                                                                                                      email:[email protected]
                                       PLUMBING ARTICULATION:                                                                         web:www.scg-engineers.com
                                                                                                                                      ABN 68 669 675 790




                                                                                                           Title:




                                                                                                        Project




                                                                                                        Date:               Drawn                Design

                                                                                                          Checked:          Drg No.                        Rev.




                                                                               Rev. - 10.06.16
Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 44

                                                                                  Issue:




                                                                                  SCG HOLDINGS PTY LTD T/A
                                                                                                                       Unit 1/11 Project Ave,
                                                                                                                       Noosa Heads
                                                                                                                       Ph (07) 5455 5604
                                                                                                                       email:[email protected]
                                                                                                                       web:www.scg-engineers.com
                                                                                                                       ABN 68 669 675 790




                                                                                            Title:




                                       PLUMBING ARTICULATION:
                                                                                         Project




                                                                                         Date:               Drawn                Design

                                                                                           Checked:          Drg No.                        Rev.




                                                                Rev. - 10.06.16
Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 45

                                                                                     ADG Consulting Pty Ltd




                              Appendix D:          Cone of Depression Calculations




                        ADG1777.25 Dewatering Management Plan_Rev0_01.05.25




Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

Page 46

Calculator

Input

Length of excavation: |36 |

Width of excavation: l17 |

Drawdown required: |2.6 |

Aquifer thickness"): | 10 |

Hydraulic conductivity: |0.0000949

Results

Effective pumping radius, Re : 14
Cone of depression radius, Rg : 76
Total pumping rate: 8
Pumping time required: 102

Document Set ID: 23735664
Version: 1, Version Date: 12/05/2025

metres

metres

metres

metres

metres/second

metres
metres
litres/second

hours

Used in these records

About this file

File size
10.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Reference Document - Dewatering Management Plan (For Stamping) MCU25_0053 & OPW25_0074.pdf · 10.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.