Skip to the record
Beware of cheap imitations.

Council archive · source document

08/0587 - MCU - Commercial Business Type 2 - Medical [As Published] · 132008.587

of 50

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 19

35.

36.

37.

38.

All stormwater drainage (including roof water overflow from the rainwater storage system) shall be
collected and discharged so there is no net increase in stormwater runoff from the site. The runoff from
the site shall be controlled via a combination of retention, detention, on site infiltration and gravity
drainage lines. Stormwater drainage permitted to drain from the site shall be discharged to Council's
existing drainage structures located in the adjoining property to the north (Lot 95 SP137431).

The design of the stormwater drainage system for the site shall be prepared by a suitably qualified
Registered Professional Engineer. The design shall include but not be limited to:

36.1, The design of any required on site infiltration system to be of sufficient size to cater for a Q100
rainfall event for the catchment area draining to the on site infiltration system.

36.2. A report prepared by a suitably qualified geotechnical engineer to determine if the existing site
conditions can cater for the expected infiltration should it be proposed;

36.3. The determination of the capacity of the existing Council stormwater system to ensure that the
subject site does not overload the system;

36.4. The design of the drainage system for the site to include backflow protection features;

To ensure that polluted run-off does not enter Council's stormwater drainage system, stormwater run-off
from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose-
down) coltected in a grease/oil arrestor provided on site prior to being permitted to discharge into
Council's drainage system.

All other clean stormwater, such as roof water, can be collected on site and discharged through a single
underground drain line directly into the existing drainage system, bypassing the grease/oil arrestor.

To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil arrestors, which
shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational
Works.

The approved maintenance plan shall be incorporated in the Community Management Scheme for the
development and a copy of this shall be provided for Council's records prior to commencement of the
approved Use.

A Development Permit for Building Works shall not be granted until a Development Permit for Operational
Works has been issued in regard to the drainage scheme.

All site stormwater drainage shall be by means of a gravity system. No mechanical features are to be
used to dispose of stormwater.

Sewer Mains

39.

40.

41.

42.

The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
accordance with Council's standards and requirements at no cost to Council.

The existing sewer main that is located in south-western and north-western corners of the site and the
‘zone of influence’ (taken as the area within a 45-degree angle measured from the invert of the sewer
main to the finished surface level) shall be accurately located and determined by a licensed Surveyor and
shown on all plans submitted for Operational Works approval.

To ensure Council's sewer main is accessible for maintenance purposes and is protected from risk of
damage no structures requiring a building permit (eg. buildings, retaining walls exceeding 1m in height,
raised terraces, etc) shall be constructed within this ‘zone of influence’ or within 1.5m of the centreline of
the sewer main, whichever is the greater. As such the applicant shall amend Operational Works plans
including Building plans to ensure compliance.

The existing sewer located in the northwest corner of existing lot 1RP903222 (No. 249) and along and
within the western boundary of existing lot 26P9315 (No. 253) shall be removed and a new 150mm dia.
sewer house connection branch constructed out of the existing manhole MP20/14/01 (located outside and
adjacent to northern boundary of lot 26) to serve the proposed development.

All works to be carried out to the standards and requirements of Council at the applicant's cost.

The applicant's shall demonstrate that the new sewer house connection branch referred to in the above
condition fully serves the proposed development in accordance with Council's Planning Scheme Policy
PSPO6 and the Plumbing Code.

AOP2 c:\docume~f\aop2Vocals~1 \temp\bcl technologies\easypaf 5\@bcl@40076eb\@[email protected]

Used in these records

About this file

File size
3.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0587 - MCU - Commercial Business Type 2 - Medical [As Published].pdf · 3.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.