Minor Change Existing Approval 132003.220660.5 (As Published)
Earthworks
20. A Registered Professional Engineer Queensland shall certify all retaining wall and deep
footing designs and certify that he or she has supervised all engineering works an that all
works have been completed in accordance with the relevant Australian Standards and the
Morrison Geotechnic report dated 7th April 2003 and best engineering practice.
21. The site will require the design of a soil retaining system by a Structural Engineer. Clearance
shall be obtained from Council’s Manager of Building as part of the process of obtaining a
Development Permit for Building works.
22. A Geotechnical engineer must be on site to supervise and direct all excavations works and
foundation constructions (i.e. Level 1 supervision in accordance with AS 3798-1996). Such
work shall only be carried out during dry weather conditions. Should any risk of sand
movement occur - all work shall be suspended until steps (approved by the Geotechnical
Engineer in conjunction with Council’s Manager Building Services) have been taken to
ensure that no further slippage will result.
23. Filling works required on site shall be carried out in accordance with Section 3.8 of Council’s
Engineering Design Standards Manual and so as not to cause the ponding of water on any
adjoining lands or the blockage of, or interference with, any natural watercourses.
This will require the design and construction of drainage pipes within the development site
that cater for drainage within the adjoining sites and in this regard a Development Permit for
Operational Works shall be obtained.
Erosion and Sediment Control
24. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required
to be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Please note that prior to the commencement of any work on site all site control measures
shall be installed and the approved plan adhered to.
General
25. Any damage caused to any public utility during the course of construction shall be repaired
to Council’s standards and at no cost to Council.
26. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
27. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to
or from the site shall be covered to prevent materials including dust being windblown from
the vehicle.
5. REFERRAL AGENCIES
Not applicable.
Page 4 of 7
Document Set ID: 23791691
Version: 0, Version Date: 01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval 132003.220660.5 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 157 KB (small file)
- File type
No other editions are linked here.