Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Noosa River DMP V1

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

      IMPROVEMENT

            NON-CONFORMITY AND CORRECTIVE ACTION
This Concept Dredge Management Plan has outlined areas of environmental management for the works. If
ongoing monitoring of the works identify areas of non-conformance with the requirements of this Concept Dredge
Management Plan, the Contractor shall (where possible, safe and appropriate):
     a) React to the Non-Conformity.
            1) Take Corrective Action to control and correct it.
            2) Deal with the consequences, including mitigating actual adverse environmental impacts.
            3) Initial Communication of the Non-conformity
     b) Evaluate the need for action to eliminate the causes of the nonconformity.
            1) Review the nonconformity.
            2) Determine the causes of the nonconformity.
            3) Determine if similar nonconformities exist or could potentially occur.
     c) Implement any preventative action needed.
     d) Review the effectiveness of any corrective action undertaken.
     e) Make changes to the environmental system, if necessary.
Communication of the issue to the approval holder (Noosa Shire Council) is required as soon as practicable if the
Non-Conformity included any of the following:
            o   A complaint regarding any environmental impact caused by the works is received.
            o   A departure from approved procedure is observed.
            o   Non-compliance with performance criteria.
            o   Major non-conformance with management plan.
Notification of agencies is to be undertaken where required.


            CONTINUAL IMPROVEMENT
The Contractor shall continually improve the suitability, adequacy and effectiveness of the environmental
management system to enhance environmental performance.




32
Log in to download the original file

Noosa River DMP V1.pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.