OP WORKS THE BELVEDERE ON PEARL ISSUE 5 PEARL STREET, COOROY QLD 4562 CIVIL WORKS NOTE: 6. THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS ON THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING SERVICES BEFORE CLASHES PRIOR TO COMMENCEMENT OF CIVIL WORKS. CONTRACTOR TO ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO PROVIDE IMMEDIATELY REPORT ANY DISCREPANCIES TO RECOR AND AWAIT FORMAL A DIRECTION PRIOR TO COMMENCING CIVIL WORKS. MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED INSPECTIONS. SHOULD 7. ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL THE BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS, CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD CONTRACTOR FAIL TO REQUEST AN INSPECTION, THE CONTRACTOR WILL BE PAVEMENTS. RESPONSIBLE FOR ALL COSTS TO ALLOW FOR THE WORKS TO BE INSPECTED TO 8. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO THE AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR SATISFACTION OF RECOR. ANY INSPECTIONS THAT FAIL ARE TO BE REINSTATEMENT TO BE CARRIED OUT IMMEDIATELY TO THE SATISFACTION RE-INSPECTED WITH OF INFRASTRUCTURE OWNER/MANAGER / AUTHORITY/COUNCIL. ALL REINSPECTION COSTS TO BE PAID BY THE CONTRACTOR. 9. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL WORKPLACE HEALTH AND SAFETY REQUIREMENTS. a. PRESTART 10. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE SITE BOUNDARY b. EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE, AND EROSION CONTROL MEASURES UNSUITABLE GROUND CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL MEASURES c. SIDE AND CUT OFF DRAINS NECESSARY TO ENSURE THE INTEGRITY OF EXISTING BOUNDARIES AND INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW VIBRATION d. STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL EQUIPMENT, TRENCH SHORING ETC AS REQUIRED. e. STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT 11. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON f. STORMWATER STRUCTURE BASE SLABS THESE DRAWINGS, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE. g. SEWER RETICULATION 12. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL h. WATER RETICULATION CONSTRUCTED WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT i. PAVEMENT SUBGRADE REQUIREMENTS. UNLESS OTHERWISE ADVISED BY RECOR CONTRACTOR TO NOTE COUNCILS ADAC REQUIREMENTS. j. PAVEMENT REINFORCING 13. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT k. PAVEMENT PRIOR TO SEALING (PRESEAL) APPROVALS. l. RETAINING WALL FOOTING REINFORCING 14. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL, m. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL LANDSCAPE AND OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL CONSTRUCTION. n. STEEL REINFORCEMENT OF CONCRETE STRUCTURES 15. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION o. PRACTICAL COMPLETION WORKS COMMENCING ON SITE. p. ON MAINTENANCE 16. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS q. OFF MAINTENANCE AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O. r. ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER 17. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING DEVELOPMENT APPROVAL) PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT OF ANY WORKS ON SITE. s. ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE 18. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED RELEVANT TO THEIR CERTIFICATION SCHEME IN THE APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO LOCALITY PLAN ENSURE ALL TREE ROOTS AND STUMPS ARE COMPLETELY REMOVED AND NOT TO SCALE GENERAL NOTES BACKFILLED TO LEVEL 1 SUPERVISION. CONTRACTOR TO ALLOW TO MULCH ALL CLEARED VEGETATION AND STOCKPILE ON SITE OR REMOVE FROM SITE 1. ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN. AS DIRECTED. 2. ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 19. DRAWINGS TO BE READ IN CONJUNCTION WITH THE FOLLOWING CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY CONSULTANTS/CONTRACTORS DRAWINGS: 02/07/21 ISSUED FOR OPW - MVP SETOUT THE WORKS. DATE REVISION MARK CHK SURVEYOR: SKYLINE SURVEYORS 3. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT PROJECT ENGINEER ARCHITECT: ZEST BUILDING GROUP SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT HYDRAULICS: TBC GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED STANDARD DRAWINGS AND SPECIFICATIONS U.N.O. STRUCTURAL: RECOR 4. SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF LANDSCAPE: ZEST BUILDING DESIGN THE TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND 20. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY: LOCAL AUTHORITY REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS THEIR COST INCLUSIVE OF ANY ADDITIONAL COSTS INCURRED BY RECOR. WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS E [email protected] ASSOCIATED WITH IMPLEMENTATION OF THE TMP. 5. EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS A 37 MARY ST NOOSAVILLE, QLD SUCH THEIR ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS 21. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH THE FOLLOWING P +61 7 5211 1003 TAKEN BY RECOR OR THE PRINCIPAL FOR THE ACCURACY AND LOCAL AUTHORITY APPROVALS: T.B.A COMPLETENESS OF THIS INFORMATION. IT IS THE RESPONSIBILITY OF THE CLIENT CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND LEVEL OF 22. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH OPW ALL EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY APPROVALS BY COUNCIL. VIVIDO DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT. 23. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE PROJECT CONTRACTOR TO LOCATE AND PROTECT SERVICES AS REQUIRED DURING BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF PROPOSED WORKS. THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY, ROAD THE BELVEDERE ON PEARL RESERVE, PARKS/OPENSPACE, EASEMENTS. 5 PEARL STREET, COOROY 24. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION DRAWINGS AND APPROVALS ON SITE AT ALL TIMES. TITLE 25. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND COVER SHEET AND CONSTRUCTION CODE (2013). LOCALITY PLAN PROJECT NO. DRAWING NO. STATUS 21011 C01 OPW DRAWN DESIGNED SCALE ISSUE MVP BRP 1:200 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU21.0117 OPW21.0199-Att 5 Stormwater.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.