SEDIMENT RELEASE GUIDELINES
1.   ALL RELEASES OF STORMWATER CAPTURED ONSITE, UNLESS OTHERWISE
                                                                          FIELD INLET
                                                                          15. FOR FIELD INLET STANDARD DETAIL AND SPECIFICATION REFER TO
                                                                                                                                                                       OP WORKS
     NOTED IN THIS STANDARD, MUST NOT EXCEED THE FOLLOWING LIMITS:
                                                                              INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST                                 ISSUE
                                                                              PRACTICES STANDARD DRAWING ESC-02 GRATED STORMWATER (FIELD)
  1.1.   50mg/L OF TOTAL SUSPENDED SOLIDS (TSS) AS A MAXIMUM
                                                                              INLET SEDIMENT TRAP.
         CONCENTRATION;
  1.2.   TURBIDITY (NTU) VALUE LESS THAN 10% ABOVE BACKGROUND;
                                                                          OPERATION AND MAINTENANCE
  1.3.   pH VALUE MUST BE IN THE RANGE 6.5 TO 8.5 EXCEPT WHERE, AND TO
         THE EXTENT THAT, THE NATURAL RECEIVING WATERS LIE OUTSIDE THIS
                                                                          16. IN ACCORDANCE WITH NC ESC GUIDELINES, ALL ESC MEASURES SHALL BE                             LEGEND
                                                                              INSPECTED:
         RANGE.
                                                                              · AT LEAST DAILY (WHEN WORK IS OCCURRING ON SITE) OR WEEKLY (WHEN
2. THE CONCENTRATION OF TSS RELEASED BY DEWATERING MAY ONLY                                                                                                                       CONSTRUCTION ENTRY/EXIT
                                                                                 WORK IS NOT OCCURRING ON SITE)
     EXCEED 50mg/L WHERE IT CAN BE DEMONSTRATED AND SUPPORTED                                                                                                                     SHAKEDOWN AREA
                                                                              · WITHIN 24 HOURS OF EXPECTED RAIN; AND
     THROUGH DOCUMENTATION THAT:
                                                                              · WITHIN 18 HOURS OF A RAINFALL EVENT (I.E. AN EVENT OF SUFFICIENT
  2.1.   FURTHER SIGNIFICANT RAINFALL IS FORECAST TO OCCUR BEFORE THE                                                                                                             SEDIMENT FENCE
                                                                                 INTENSITY AND DURATION TO MOBILISE SEDIMENT ON SITE).
         TSS CONCENTRATION IS LIKELY TO BE REDUCED TO 50mg/L;                                                                                                                     (INDICATIVE LOCATION)
                                                                          17. IN ACCORDANCE WITH NC ESC GUIDELINES, MAINTENANCE OF ESC
  2.2.   RELEASING A HIGHER CONCENTRATION OF TOTAL SUSPENDED SOLIDS
                                                                              MEASURES SHALL OCCUR IN ACCORDANCE WITH THE FOLLOWING TABLE:
         WILL RESULT IN A BETTER ENVIRONMENTAL OUTCOME BY PROVIDING
         STORAGE FOR THE CAPTURE AND TREATMENT OF RUN-OFF FROM THE
         IMMINENT RAINFALL AND RUN-OFF.                                                           MAINTENANCE SCHEDULE
  2.3.   ALL REASONABLE AND PRACTICABLE STEPS HAVE BEEN TAKEN TO               ESC MEASURES           MAINTENANCE TRIGGER
                                                                                                                              TIMEFRAME FOR COMPLETION
                                                                                                                                   OF MAINTENANCE
         TREAT THE WATER WITHIN BEST-PRACTICE TIME FRAMES;
  2.4.   FLOCCULENT HAS BEEN APPROPRIATELY APPLIED AND THE
         CONCENTRATION OF TSS IN THE CAPTURED WATER HAS ALREADY
         SIGNIFICANTLY DECREASED.
3. FOR ALL OTHER STORMWATER RELEASES, FLOWS AND DISCHARGES FROM
     THE SITE, THE RELEASE LIMIT PRESCRIBED IN (1a) ABOVE MUST NOT BE     REPORTING
     EXCEEDED UNLESS THE DEVELOPMENT IS IN FULL COMPLIANCE WITH THIS      18. CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM OF ESC MAINTENANCE
     STANDARD.                                                                AND CONTROL OF ALL STAGES OF WORK FOR APPROVAL BY THE
                                                                              SUPERINTENDENT.
NOTE:     IT IS RECOMMENDED THAT A SITE-SPECIFIC RELATIONSHIP BETWEEN
TURBIDITY AND SUSPENDED SOLIDS IS DETERMINED FOR EACH SEDIMENT BASIN.
ONCE A CORRELATION BETWEEN SUSPENDED SOLIDS AND TURBIDITY HAS BEEN        NOTES
ESTABLISHED FOR A SEDIMENT BASIN, TESTING STORMWATER FOR COMPLIANCE
WITH RELEASE LIMITS, PRIOR TO RELEASE, CAN BE DONE ON SITE WITH A         1.   CONTRACTOR TO PROVIDE FINAL ESC DESIGN TO SUIT
TURBIDITY TUBE OR CALIBRATED TURBIDITY METER. THIS HAS THE ADVANTAGE           PROPOSED CONSTRUCTION METHODOLOGY
OF PROVIDING IMMEDIATE ASSESSMENT TO JUSTIFY A RELEASE RATHER THAN        2.   ALL DISTURBED SURFACES TO BE LANDSCAPED IN
WAITING FOR LABORATORY RESULTS TO CONFIRM CONCENTRATION LEVELS                 ACCORDANCE WITH LANDSCAPE CONSULTANTS DRAWINGS
AND COMPLIANCE. NOTE THAT     POST-RELEASE TSS VALIDATION IS              3.   CONCRETE WASHOUT TO NOT BE UNDERTAKEN ON SITE, OR
APPROPRIATE TO DEMONSTRATE THAT THE NTU/TSS CORRELATION IS BEING               TO BE UNDERTAKEN ON A DESIGNATED LOCATION.
MAINTAINED.                                                                    CONTRACTOR TO ESTABLISH CONCRETE WASHOUT AS PER
                                                                               IECA GUIDELINES.
SEDIMENT CONTROL
1.   ALL SEDIMENT AND EROSION CONTROL MEASURES TO BE IN ACCORDANCE
     WITH INTERNATIONAL EROSION CONTROL ASSOCIATION (IECA) AUSTRALIA
     GUIDELINES AND THE SPECIFICATIONS.
2.   SEDIMENT AND EROSION CONTROL DETAILS SHOWN ARE MINIMUM
     REQUIREMENTS. IT IS THE CONTRACTORS RESPONSIBILITY TO INSTALL
     ADDITIONAL CONTROL MEASURES AS DEEMED NECESSARY THROUGHOUT
     CONSTRUCTION.
3.   THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT CONTROL
     DEVICES IN A FUNCTIONAL ORDER AND REPLACE ALL BLOCKED SEDIMENT
     DEVICES AS REQUIRED UNTIL SUCCESSFUL OFF MAINTENANCE OF WORKS.
4.   CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE
     SATISFACTION OF THE SUPERINTENDENT. SHALL BE COMPLETED AND
     EFFECTIVE PRIOR TO:
     a. STRIPPING OF TOPSOIL AND GRASS.
     b. BULK EARTHWORKS TO THE SITE.
     c. SERVICES INSTALLATION.
     d. PAVEMENT CONSTRUCTION
5.   ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE UNTIL
     INSTRUCTION IS RECEIVED IN WRITING FROM THE SUPERINTENDENT TO
     REMOVE ALL OR PART OF THE SILT CONTROL APPLICATIONS.
6.   THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN SHALL BE
     READ IN CONJUNCTION WITH THE APPROVED DRAWINGS.
7.   PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE
     OBTAINED FROM THE SUPERINTENDENT FOR THE LOCATION OF THE SITE
     ACCESS POINT AND WASH DOWN AREA WHICH ARE TO BE MAINTAINED
     THROUGHOUT THE CONSTRUCTION PERIOD.
8.   IF SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN FOUND TO BE
     DIFFERENT OR FAILED IN SERVICE, CORRECTIVE ACTION IS TO BE                  SEDIMENT AND EROSION CONTROL:
     UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE AMENDMENTS' ADDITIONS              CONTRACTOR TO ALLOW FOR PROVISION OF ALL
     TO THE ORIGINAL APPROVED EROSION CONTROL PLANS. SUCH                        REQUIRED SEDIMENT AND EROSION CONTROL
     AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT, IF DEEMED                  DEVICES IN ACCORDANCE WITH IECA AND NOOSA
     NECESSARY AND RELEVANT.                                                     COUNCIL POLICIES AND GUIDELINES

9.   OVERALL
     a. TEMPORARY DRAINAGE CONTROL FLOWS SHOULD BE DIVERTED
        AROUND THE WORK SITE WHERE POSSIBLE.
     b. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED
        AND BE OPERATIONAL BEFORE COMMENCING UP-SLOPE EARTHWORKS.
     c. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED
        SURFACES TO BE EITHER MULCHED, COVERED WITH EROSION CONTROL
        BLANKETS OR TURFED IF EARTHWORKS ARE EXPECTED TO BE DELAYED
        FOR MORE THAN 14 DAYS.

SEDIMENT FENCE                                                                                                                                           02/07/21   ISSUED FOR OPW                        -    MVP
10. FOR SEDIMENT FENCE STANDARD DETAIL AND SPECIFICATION REFER TO
                                                                                                                                                          DATE              REVISION                MARK CHK
    INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST
    PRACTICES STANDARD DRAWINGS SF-01 AND SF-02 SEDIMENT FENCE.                                                                                          PROJECT ENGINEER

TEMPORARY CONSTRUCTION ENTRY/EXIT
11. FOR CONSTRUCTION ENTRY / EXIT STANDARD DETAIL AND SPECIFICATION
    REFER TO INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA
    (IECA) BEST PRACTICES STANDARD DRAWINGS EXIT-01 AND EXIT-02
    CONSTRUCTION EXIT - ROCK PAD (CONSTRUCTION SITES ONLY), EXIT-03 -
    ROCK PADS FOR BUILDING SITES AND EXIT-04 AND EXIT-05 CONSTRUCTION
    EXIT - VIBRATION GRID.

KERB INLET
12. FOR KERB INLET STANDARD DETAIL AND SPECIFICATION REFER TO
                                                                                                                                                          E [email protected]
    INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST                                                                                     A 37 MARY ST NOOSAVILLE, QLD
    PRACTICES STANDARD DRAWING ESC-03 KERB INLET SEDIMENT TRAPS
                                                                                                                                                          P +61 7 5211 1003
CHECK DAMS
13. FOR CHECK DAM STANDARD DETAIL AND SPECIFICATION REFER TO                                                                                             CLIENT
    INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST
    PRACTICES STANDARD DRAWING RCD-01 CHECK DAMS.                                                                                                          VIVIDO
REVEGETATION                                                                                                                                             PROJECT
14. FOR REVEGETATION STANDARD SPECIFICATION REFER TO INTERNATIONAL
    EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES                                                                                           THE BELVEDERE ON PEARL
    STANDARD DRAWING R-01 REVEGETATION GENERAL.
                                                                                                                                                            5 PEARL STREET, COOROY
                                                                                                                                                         TITLE

                                                                                                                                                           EROSION AND SEDIMENT
                                                                                                                                                           CONTROL PLAN

                                                                                                                                                         PROJECT NO.      DRAWING NO.      STATUS

                                                                                                                                                            21011         C10               OPW
                                                                                                                                                         DRAWN            DESIGNED          SCALE             ISSUE

                                                                                                                                                             MVP            BRP                1:200           A

Used in these records

About this file

File size
5.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU21.0117 OPW21.0199-Att 5 Stormwater.pdf · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.