Council archive · source document
MCU21.0117 OPW21.0199-Att 5 Stormwater · MCU21/0117
TABLE OF CONTENTS
PROJECT INFORMATION .................................................................................................................................... I
TABLE OF CONTENTS ........................................................................................................................................ II
1. INTRODUCTION ............................................................................................................................................ 1
2. SITE DETAILS ................................................................................................................................................. 1
2. 1. E X I S T I N G S I T E D E S C R I P T I O N ................................................................................ 1
2. 2. E X I S T I N G D R A I N A G E P A T T E R N S ............................................................................. 3
2.2.1 Existing Stormwater Infrastructure .................................................................................................... 3
2.2.1.1. Roof Drainage ......................................................................................................................... 3
2.2.1.1. Upstream Catchments............................................................................................................. 4
2.2.1 Stormwater Catchments .................................................................................................................... 5
2. 3. P R O P O S E D D E V E L O P M E N T D R A I N A G E P A T T E R N .......................................................... 5
2.3.1 Stormwater Concept .......................................................................................................................... 5
2.3.2 Stormwater Catchments .................................................................................................................... 6
2. 4. F L O O D C O N S I D E R A T I O N S .................................................................................... 7
3. STORMWATER QUANTITY ............................................................................................................................ 8
3. 1. D I S C H A R G E T O P E A R L S T R E E T ............................................................................... 8
4. STORMWATER QUALITY ............................................................................................................................. 11
4. 1. C O N S T R U C T I O N P H A S E ...................................................................................... 11
4.1.1 Erosion and Sediment Control Measures ......................................................................................... 11
4.1.2 Erosion and Sediment Control Monitoring ....................................................................................... 12
4. 2. O P E R A T I O N A L ................................................................................................ 12
4.2.1 MUSIC Modelling ............................................................................................................................. 13
4.2.1.1. Rainwater Tanks ................................................................................................................... 14
4.2.1.1. Pit Inserts .............................................................................................................................. 16
4.2.1.1. Bioretention Areas ................................................................................................................ 17
4.2.1.2. MUSIC modelling results ....................................................................................................... 18
4.2.2 Operational Maintenance ................................................................................................................ 19
5. CONCLUSION .............................................................................................................................................. 20
PROPOSED DEVELOPMENT PLANS ........................................................................................ 22
STORMWATER HGL ANALYSIS ............................................................................................... 23
EXAMPLE ESC DEFECT DOCUMENTATION TEMPLATE ............................................................ 29
ECOSOL LITTER BASKET TECHNICAL SPECIFICATION .............................................................. 31
BIORETENTION INSPECTION CHECKLIST ................................................................................ 32
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU21.0117 OPW21.0199-Att 5 Stormwater.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.