MCU21.0117 OPW21.0199-Att 5 Stormwater · MCU21/0117
2.2.1 Stormwater Catchments
A schematic layout plan of the existing drainage catchments as described in the previous
sections is shown below in Figure 2.5 – Existing Catchments Plan.
Figure 2.5 – Existing Catchments Plan.
2. 3. P R O P O S E D D E V E L O P M E N T D R A I N A G E P A T T E R N
2.3.1 Stormwater Concept
Under existing conditions, the stormwater leaves the property as overland surface flows into
the adjoining properties to the east and north of the proposed development. The proposed
lawful point of discharge for the proposed development will be to the existing table drain
on Pearl Street, which will have the benefit of reducing the impact of overland flow from the
site on the adjoining property owners, and ensuring the runoff is discharged in a controlled
manner into Council’s drainage network.
Page 5 of 33
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU21.0117 OPW21.0199-Att 5 Stormwater.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.