Skip to the record
The only place to find full transcripts.

Original source · versioned page text

SUPERSEDED - Approved Plans OPW26/0033

of 29

Original PDF page 15, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                    NOTES
                                                                                                                                                                                    •   Topsoil - is to be ameliorated site soil
                                                                                                                   NO CLEARING ZONES
                                                                                                                                                                                        or imported AS 4419 soils.

                                                                                                                                                                                    •   Street Tree Setout - The final street
                                                                                                                                                                                        tree planting locations may vary due to
                                                                                                                                                                                        the final driveway access points and
                                                                                                                                                                                        underground services.

                                                                                                                                                                                    •   Street Trees - Plant stock must meet
                                                                                                                                                                                        AS 2303:2018 Tree Stock for
                                                                                                                                                                                        Landscape Use. Planting to be carried
                          VEGETATION COVENANT AREA 7,675m2                                                                                                                              out as per Planting Schedule on LD-03.
                                    (Refer to LD-05)
                                                                                                                                                                                    •   Bioretention Basin Batters - To have
                                                                                                                                                                                        100mm topsoil installed over
                                                                                                                                                                                        cultivated subgrade. 100mm of forest
                                                                                                                                                                                        mulch to all areas and pinned with
                                                                                                                                                                                        400GSM coir netting up to height of
                                                                                                                                                                                        water discharge points or and/or on
                                                                                                                                                                                        slopes greater than 1:4. Planting to be
                                                                                                                                                                                        carried out as per Planting Schedule on
                                                                                                                                                                                        LD-03.

                                                                                                                                                                                    •   Bio Bioretention Basin Floor -
                                                                                                                                                                                        Sacrificial turf on is to be removed and
                                                                                                                                                                                        disposed of after 80% of residential
                                                                                                                                                                                        lots have built on. Filtration media to be
                                                                                                                                                                                        re-profiled and topped up to correct
                                                                                                                                                                                        levels if required.
                                            NO CLEARING ZONE
                                                                                                                                                                                    •   Bio Bioretention Basin Floor - Is to
                                                                                                                                                                                        have 75mm thick layer of sugar cane
                                                                                                                                                                                        mulch applied, secured with 400GSM
                                                                                                                          BIORETENTION BASIN                                            coir netting and pinned with 300mm
                                                                                                                                                                                        pins. Planting to be carried out as per
                                                                                                                            (Refer to LD-03 for
                                                                                                                                                                                        Planting Schedule on LD-03.
                                                                                                                           Planting Schedule)




                                                                                                                                                                                               -
                                                                                                                                                                                                     NOOSA COUNCIL
                                                                                                                                                                                                   APPROVED DOCUMENT
                                                                                                                                                                                                   OPW26/0033 7 AUG 2026




                                                                               PROJECT     30 POTTERY ST, POMONA                                  ISSUE      DATE    DESCRIPTION

                                                         294 COLES CREEK RD,
                                                           COORAN QLD 4569
                                                                               CLIENT      BRIAN NAISMITH DEVELOPMENT CONSULTANT                   A      03/07/26   For Approval

                                                         PHONE: 0417 619 457
                                                                                                                                                                                        SHEET LD-02
                                                      [email protected]
                                                                               DOC TITLE   LD-RMP POTTERY ST
                                                       WWW.FLORAFIED.COM.AU
                                                                               DATE        03/07/2026                  DRAWN    JF   ISSUE   A

Document Set ID: 24932808
Version: 1, Version Date: 08/07/2026

Log in to download the original (SUPERSEDED - Approved Plans OPW26_0033.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.