                                  Form 6 - Decision Notice
                                  INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION


 File No:    2007/2031                         Date of Decision:        12 December 2007

1.     APPLICANT DETAILS

 Name:               Henjo Investments Pty Ltd & Karen McDonagh Investments Pty Ltd

 Postal address:     CARE Tod Noosa Pty Ltd
                     PO Box 233
                     NOOSA HEADS QLD 4567


 Phone no:           5449 9600             Fax no:        5449 9494

2.     PROPERTY DESCRIPTION

 Street address:     28 Headland Drive NOOSAVILLE, 26 Headland Drive NOOSAVILLE

 Real property       LOT: 1 RP: 137140, LOT: 2 RP: 137140
 description:

3.     OWNER DETAILS

 Name:               Henjo Investments Pty Ltd & Karen McDonagh Investments Pty Ltd

 Postal address:     PO Box 1665
                     BONDI JUNCTION NSW 1355

4.     REFERRAL AGENCIES

 Referral Agency            Address                                                  Basis
 NIL

5.     APPLICATION TYPE

 Development                     Development Details                        Preliminary      Development
                                                                             Approval           Permit
 Operational Works               In accordance     with   Engineering           No               Yes
                                 drawings Nos.

                                 07562-1A dated September 2007 by
                                 TOD Noosa

                                 07562-2A dated September 2007 by
                                 TOD Noosa

                                 07562-4A dated September 2007 by
                                 TOD Noosa

                                 or as modified herein.

6.     DECISION DETAILS

Council decided to approve this application on 12 December 2007, subject to conditions.
Full text of the other 8 pages

Page 2

NOOSA COUNCIL IDAS Development Application Decision Notice                                             2 of 9

7.     APPLICABLE CODES

The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
N/A.

8.     CONDITIONS

The approval is subject to conditions. Noosa Council’s conditions are attached.

9.     FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required                 Subject of the required Development Permit
 N/A

10.    RIGHTS OF APPEAL

Rights of appeal in relation to this application are attached.

11.    ASSESSMENT MANAGER

 Name:      Noosa Council                 Signature:                                Date:




NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@e40c7ff4\@[email protected]

Page 3

NOOSA COUNCIL IDAS Development Application Decision Notice                                                     3 of 9




                                     Noosa Council Conditions
                                     INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


1.     The development shall be carried out in accordance with Engineering drawings Nos.

       07562-1A      dated September 2007                 by TOD Noosa

       07562-2A      dated September 2007                 by TOD Noosa

       07562-4A      dated September 2007                 by TOD Noosa

       or as modified herein.

2.     The Traffic Management Plan described in condition 20 of the Decision Notice File No: 2006/2241 dated
       19 March 2007 shall be submitted to and approved by Council prior to the pre start meeting.

3.     Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily installed into the
       first existing external downstream stormwater structure. In this regard the “filter tube” indicated on drawing
       No: 07562-4A dated September 2007 by TOD Noosa shall be deleted and replaced with “in pit” devices.
       These devices are to be checked and cleaned on a regular basis and specifically after each rain event.
       These devices are to remain in place during the civil works and construction phases of the development.
       The location and type of device to be installed shall be established at the “pre start” meeting with
       Council’s Construction Technical Officer and shall be installed prior to the commencement of any works.
4.     Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’ notice of
       intention to commence works to arrange a “pre start” meeting regarding the civil works.

5.     The principal contractor must have all the appropriate insurance and public liability documentation to carry
       out the works. The principal contractor is also responsible to ensure that any sub contractors also have
       the appropriate insurance and public liability documentation.

6.     Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council’s
       signed approved drawings and conditions by the applicant.

7.     The Consulting Engineers for the project shall be currently Registered Professional Engineers of
       Queensland (RPEQ). The consulting engineers are responsible for arranging all inspections, with
       Council’s Construction Technical Officer or nominated staff.

8.     Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project.
       (This person will be the contact for the project).

9.     Council standards shall apply to these works unless otherwise modified herein.

10.    The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
       during the construction of the engineering works to ensure that Council property, road pavements or
       facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
       furniture etc.) are protected against any damage or interference whatsoever.

       If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
       Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
       engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager Land
       Development and shall forthwith rectify the damage to that property or facility at its cost and to the
       satisfaction of the Manager Land Development.

       All rectification works are to be completed prior to the sealing of the survey plan or, alternatively, the
       Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost
       being paid by the Applicant to the Council prior to the sealing of the survey plan.

       In the case of any emergency the Council shall be entitled to rectify such damage at the cost of the
       Applicant, such cost being paid prior to the sealing of the survey plan.




NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@e40c7ff4\@[email protected]

Page 4

NOOSA COUNCIL IDAS Development Application Decision Notice                                                    4 of 9


11.    The development of the site shall be carried out in such a manner as to prevent dust and/or sand
       nuisance to residents and/or tenants in the vicinity of the development.

12.    Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00
       pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
       hours are approved by the Manager-Land Development or his nominee.

13.    All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
       Traffic Control Devices and Traffic Infrastructure (Roads) Act.

14.    Safe pedestrian access on Headland Drive and Eumundi Noosa Road shall be maintained at all times.
       Should footpath / road closures be necessary to carry out construction works, Council’s Construction
       Technical Officer (ph 0410 512 505) must be notified prior to the proposed closure.

15.    Sediment and erosion control measures must be in place prior to works commencing. If such measures
       are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if
       sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
       natural waterways. Although the sediment and erosion control measures have been approved on drawing
       No 07562-4A dated September 2007 by TOD Noosa, Council’s Manager – Land Development may
       request further controls to be installed should approved measures be inefficient.

16.    Certification of the completed works must be provided to Council by the supervising engineer.

17.    These works are also to be in compliance with the relevant conditions of Development Permit No.
       2006/2241.

18.    Pursuant to Section 3.5.21(5) of the Integrated Planning Act 1997, the Relevant Period is two (2) years
       from the day this permit takes effect (until 17 December 2009) during which time all conditions must have
       been complied with and the Plan of Survey lodged with the Council for endorsement.

19.    Notwithstanding that Council has checked the plans with due care, where it is found during construction
       that variations from Council's standards exist, then Council standards shall apply.
       Water and Sewerage

       The water & sewerage plans listed below are satisfactory:

       07562-2A – Sewer Reticulation and Water Supply Plan
       07562-3A – Sewer Longitudinal Section and Notes

This Decision Notice is issued subject to and conditional upon the relevant Approved Development
Permit having been granted to the applicant.

20.    A copy of the job specification is to be provided to Council’s Inspector within seven (7) days of the date of
       this Decision Notice, and prior to commencement of works.

21.    The names of any proposed contractors for works are to be submitted in writing, together with copies of
       current Public Liability and Workers Compensation Insurances together with certificates of currency for
       those policies, for consideration by the Assessment Manager seven (7) days prior to pre-start meetings
       and commencement of works.
       A separate letter will then be issued approving the contractor (or otherwise) for the works. No other
       contractor or subcontractor shall be engaged to carry out the works or any part of the works without the
       written approval of the Assessment Manager.

22.    Council’s Water & Sewerage Inspector shall be given (7) days notice of intention to commence works. A
       pre-start meeting shall be arranged prior to commencement of works by contacting Council’s Water &
       Sewerage Inspector, Mr Trevor Mourilyan, Ph. 0417 780 830. Inspector is only available for pre-start
       meetings, inspections and testing etc. between the hours of 6:30am to 4:00pm, Monday to Friday.
       Inspector will not be available outside these hours unless prior approval is obtained from the Water &
       Sewerage Capital Works Manager with any costs incurred by Council outside the hours nominated above,
       met by the Contractor/Developer. These costs will be in addition to normal inspection fees.

23.    Notwithstanding that Council has checked the plans with due care, where it is found during construction
       that variations exist with Council's standards, Council standards shall apply.




NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@e40c7ff4\@[email protected]

Page 5

NOOSA COUNCIL IDAS Development Application Decision Notice                                                        5 of 9


24.    It is the responsibility of the applicant to ensure that its consultants and contractors take all reasonable
       care during the construction of the engineering works to ensure that Council property or facilities (such as
       underground drainage, water supply and sewerage) are protected against any damage or interference
       whatsoever.

25.    If any Council property or facilities should be damaged by the applicant or any of its consultants or
       contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
       engineering works, the applicant and/or its contractors shall forthwith notify the Assessment Manager and
       shall forthwith rectify the damage to that property or facility at its cost to the satisfaction of the Assessment
       Manager prior to the sealing of the survey plan and/or acceptance of the works on-maintenance.
       Alternatively, the applicant may request the Council to carry out the rectification work at the applicant's
       cost, such cost being paid by the applicant to the Council prior to the sealing of the survey plan and/or
       acceptance of the works 'on maintenance' provided that in the case of emergency, the Council shall be
       entitled to rectify such damage at the cost of the applicant such cost being paid prior to the sealing of the
       survey plan and/or acceptance of the work 'on maintenance'.

26.    The Contractor shall make all necessary arrangements for supply of water required for construction works.
       The use of hydrant standpipes on Council mains will NOT be permitted. Contractors should contact
       Council’s Water Section on phone 5449 5254 to obtain an application form for issue of a key to access
       Council’s water tanker filling stations. Conditions of access and location of filling stations are detailed on
       the application form.

27.    All connections to existing live water mains are to be carried out by Noosa Council at completion of
       construction of internal works.

28.    All sewerage reticulation mains are to be inspected by closed circuit television (CCTV) prior to acceptance
       'on maintenance'.
       CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council following
       satisfactory completion of construction works. The developer will be responsible for the full cost of CCTV
       inspection, including any additional inspection necessary following defect identification and rectification.
       This charge is payable prior to commencement of works and will be determined on the unit rate basis
       current at the time of approval.
29.    All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
       Traffic Control Devices and Main Roads Department Roadworks Signing Guide.

30.    As Constructed drawings in both hardcopy and digital format (ADAC) produced in GDA94 Zone 56
       coordinate value to the standards and requirements of the Assessment Manager are required for Council
       records. Such 'as constructed' drawings will be required prior to works being accepted "on maintenance",
       where applicable. Requirements for "as constructed" information are detailed in the current version of
       Council's Engineering Design Standards (Water & Sewerage) Manual.
       Release of plans of survey and/or acceptance of the works on-maintenance will not be considered until
       lodgement of satisfactory 'as constructed' records.

       Please note that bonding of outstanding works will not be considered by Council.
31.    TOD Group, as Consulting Engineers for the project, are responsible for arranging all inspections and
       ensuring that all relevant details required by Council are supplied. The attached Water and Sewerage
       Inspection Report form is to be kept by you and presented to Council's Inspector at each stage of the
       development requiring a meeting or inspection. The Inspector will sign the form at each stage when
       conditions have been satisfied. The works will be accepted 'on maintenance' when this form, signed by
       the Inspector for each stage, is returned with a letter requesting that it go 'on maintenance'.

32.    It is Council policy that a maintenance bond be imposed on construction works during the maintenance
       period. The maintenance bond shall be 5% of the agreed value of the development obligations, or $1,500
       whichever is the greater amount. This bond must be lodged by (and shall only be accepted from) the
       Developer for the works.

33.    Construction work and other associated activities are permitted only during the hours of 7:00am and
       6:00pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
       hours are approved by the Assessment Manager or his nominee.

34.    Cut-ins to existing live sewer are to be performed by Approved Contractor. Noosa Council Works
       Inspector shall be present during any work on live sewer undertaken by contractor. An additional fee of
       $160.00 (included below) is required to cover costs associated with these live sewer works.




NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@e40c7ff4\@[email protected]

Page 6

NOOSA COUNCIL IDAS Development Application Decision Notice                                             6 of 9


35.    Fees applicable to the above project are listed below.
       Plan Examination                    $ 930                        PAID 05/10/07
       Inspection Fee                      $ 810                        RN 342304
       Checking as-constructed data        $ 135.00
       CCTV fee                            $ 114.75
       Live sewer inspection               $ 160.00
       BALANCE OWING                       $ NIL
36.    All water connection fees are to be paid prior to the pre-start meeting. Costs to be advised.




NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@e40c7ff4\@[email protected]

Page 7

NOOSA COUNCIL IDAS Development Application Decision Notice                                               7 of 9



                                     Local Laws, Policies & State
                                     Regulation Requirements
                                     INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


     THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
                             CONDITIONS OF APPROVAL

1.    Should any changes or modifications to the approved plans be required as a result of construction
      constraints, a Change to an Existing Approval Application under the Integrated Planning Act must be made.
      Amended plans clearly indicating the changes must be lodged with this application along with the
      appropriate fees.




NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@e40c7ff4\@[email protected]

Page 8

NOOSA COUNCIL IDAS Development Application Decision Notice                                                           8 of 9



                                                    Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION

   The following is an extract from the Integrated                           (6) If an application involves assessment against
   Planning Act (Chapter 4).                                              a concurrence agency code, appeal rights for
                                                                          submitters for the application are not available
   Division 8 - Appeals to                   court      relating     to   against the part of the approval that represents the
   development applications                                               concurrence agency’s response for the code.
   Appeals by applicants                                                  Appeals by advice agency submitters
   4.1.27.(1) An applicant for a development application                  4.1.29.(1) An advice agency may, within the limits of
   may appeal to the court against any of the following-                  its jurisdiction, appeal to the court about the giving of
   (a) the refusal, or the refusal                 in   part,   of   a    a development approval for a development
       development application;                                           application if-

   (b) a matter stated in a development approval,                         (a) the development application involves impact
       including any condition applying to the                                assessment; and
       development, and the identification of a code                      (b) the advice agency told the applicant and the
                            1
       under section 3.1.6;                                                   assessment manager to treat its response to the
   (c) the decision to give a preliminary approval when a                     application as a submission for an appeal.
       development permit was applied for;                                   (2) The appeal must be started within 20 business
   (d) the length of a currency period;                                   days after the day the decision notice or negotiated
                                                                          decision notice is given to the advice agency as a
   (e) a deemed refusal.                                                  submitter.
      (2) An appeal under subsection (1)(a) to (d) must                   Appeals for matters arising after approval given
   be started within 20 business days (the “applicant’s                   (co-respondents)
   appeal period”) after the day the decision notice or
   negotiated decision notice is given to the applicant.                  4.1.30.(1) For a development approval given for a
                                                                          development application, a person to whom any of
       (3) An appeal under subsection (1)(e) may be                       the following notices have been given may appeal to
   started at any time after the last day a decision on the               the court against the decision in the notice-
   matter should have been made.
                                                                          (a) a notice giving a decision on a request for
   Appeals by submitters                                                      extension of the currency period for an approval;
   4.1.28.(1) A submitter for a development application                   (b) a notice giving a decision on a request to make a
   may appeal to the court about-                                             minor change to an approval.
   (a) the giving of a development approval, including                        (2) The appeal must be started within 20 business
       any conditions (or lack of conditions) or other                    days after the day the notice of the decision is given
       provisions of the approval; or                                     to the person.
   (b) the length of a currency period for the approval.                        (3) Subsection (1)(a) does not apply if the
                                                                          approval resulted from a development application
       (2) The appeal must be started within 20 business                  (superseded planning scheme) that was assessed as
   days (the “submitters appeal period”) after the day                    if it were an application under a superseded planning
   the decision notice or negotiated decision notice is                   scheme.
   given to the submitter.
                                                                             (4) Also, a person who has made a request
      (3) If a person withdraws a submission before the                   mentioned in subsection (1) may appeal to the court
   application is decided, the person may not appeal the                  against a deemed refusal of the request.
   decision.
                                                                              (5) An appeal under subsection (4) may be
      (4) If an application involves both impact                          started at any time after the last day the decision on
   assessment and code assessment, appeal rights for                      the matter should have been made.
   submitters are available only for the part of the
   application involving impact assessment.                               Division 9 - Appeals to court about other matters
       (5) If an application is processed under section                   Appeals for matters arising after approval given
   6.1.28(2), appeal rights for submitters for the                        (no co-respondents)
   application are available only for the aspects of the
   development that would have required public                            4.1.31.(1) A person to whom any of the following
   notification under the repealed Act.                                   notices have been given may appeal to the court
                                                                          against the decision in the notice-
                                                                          (a) a notice giving a decision on a request to change
                                                                              or cancel a condition of a development approval.
   1
        Section 3.1.6 (Preliminary approval may override local planning
       instrument)



NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@e40c7ff4\@[email protected]

Page 9

NOOSA COUNCIL IDAS Development Application Decision Notice                                     9 of 9

                                      2
(b) a notice under section 6.1.44 giving a decision to
    change or cancel a condition of a development
    approval.
    (2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
   (3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
    (4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
    (2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.




2
     Section 6.1.44 (Conditions may be changed or cancelled by
    assessment manager or concurrence agency in certain
    circumstances)




NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@e40c7ff4\@[email protected]

Used in these records

About this file

File size
36 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00002031.002 [As Published].pdf · 36 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.