Original source · versioned page text
2019-05-22 Special Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
AGENDA
Special Meeting
Wednesday, 22 May 2019
commencing at 1pm
Council Chambers, 9 Pelican Street, Tewantin
Crs Tony Wellington (Chair), Jess Glasgow, Ingrid Jackson, Joe Jurisevic,
Frank Pardon, Brian Stockwell, Frank Wilkie
“Noosa Shire – different by nature”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 13 sections
Section 2
SPECIAL MEETING AGENDA 22 MAY 2019
TABLE OF CONTENTS
ITEM PAGE
ATTENDANCE & APOLOGIES -
REPORTS 3
1 1819T062 - NOOSA AQUATIC CENTRE ROOF AND DECK REPLACEMENT 3
2 1819T120 - NOOSA AQUATIC CENTRE POOLS REFURBISHMENT 9
MEETING CLOSURE -
Page 2 of 14
Section 3
SPECIAL MEETING AGENDA 22 MAY 2019
REPORTS
1 1819T062 - NOOSA AQUATIC CENTRE ROOF AND DECK REPLACEMENT
DOCUMENT INFORM AT ION
Author Building & Facilities Coordinator, Chris Steel
Infrastructure Services Department
Index ECM / Subject / 72.02 Noosa Aquatic Centre NAC
Attachments 1. 1819T062 – Evaluation Workbook
EXECUTIVE SUMMARY
This report provides a recommendation for the contract award of the preferred contractor for the
Noosa Aquatic Centre (NAC) roof and deck replacement.
RECOMMENDATION
That Council note the report by the Building Facilities Coordinator to the Special Meeting dated
22 May 2019 and award contract 1819T062 to Ri-Con Contractors Pty Ltd for a lump sum price
of $364,644.00 (excl. GST).
REPORT
The proposed contract is to replace the existing roof and deck at the NAC. The roof and deck are
part of the original 1999 construction and have come to the end of their useful life.
The contract works are proposed to commence on site on the 24 June 2019 with construction
anticipated to be completed by the 14 August 2019. In order to allow for a small timeline overrun
contingency, the NAC is aiming for a public reopening on Monday 20 August 2019 (an 8-week
closure in total).
1. Design
The Noosa Aquatic Centre roof design will remain almost identical to the original with only a
slight change in roof sheeting profile. The specified product solution has also taken into
consideration the harsh environment present at the NAC. The decking design has been slightly
modified to provide for better DDA compliance and greater deck space for the public to utilise.
2. Tender Process
Due to the value of the works being greater than $200,000 and the complex nature of the project,
Council went out to tender in accordance with the Local Government Act 2009 to obtain
submissions from experienced and capable contractors.
The invitation to tender 1819T062 was released via VendorPanel on 15 March 2019 and
advertised in local publications, the Sunshine Coast Daily on 16 March 2019 and the Noosa
News on 19 March 2019.
Page 3 of 14
Section 4
SPECIAL MEETING AGENDA 22 MAY 2019
The tender closed at 2.00pm, Tuesday 9 April 2019 with seven submissions received as follows:
Constructions Solutions Group
ICM Construction (QLD) Pty Ltd
M51A Contracting Pty Ltd
Metalla Pty Ltd
Midson Construction (Qld) Pty Ltd.
Ri-Con Contractors Pty Ltd
Travis Drenth Constructions
3. Tender Assessment
The tender evaluation panel (outlined below) comprised both internal staff and one external
expert who all undertook an assessment of the five conforming tender submissions.
Council Members
- Building and Facilities Coordinator (Evaluation Chair)
- Community Facilities Manager
- Aquatic Facilities Coordinator
- Project Manager, Infrastructure Services
- Work Health and Safety Advisor
External Experts
- Contour (Roof and Deck)
The tenders were evaluated against the following criteria:
Capability and Resourcing
Contract Experience and Capacity
Methodology
Quality
Health and Safety
Contribution to Local Economy
Price
The evaluation team met on several occasions to discuss the tenders with specific focus on the
timeline, project Gantt charts and the products being proposed. Additionally, clarifications of
tender submission responses, including the timeline and program duration, were sought from all
respondents and considered accordingly.
As a result of the evaluation Ri-Con Contractors Pty Ltd achieved the highest overall score and
were shortlisted as the preferred supplier.
The evaluation panel considers Ri-Con Contractors Pty Ltd to be the most advantageous to
Council and presents the best value for money. Ri-Con Contractors Pty Ltd’s tender submission
is favourable on the following basis:
Demonstrated experience with similar large value commercial projects of this nature;
Demonstrated good track record working for Noosa Council and on other similar projects;
Ri-Con Contractors Pty Ltd have the necessary resources and processes in place to deliver
the project;
Proposed methodology minimises impact on customers and staff;
Competitive pricing.
Page 4 of 14
Section 5
SPECIAL MEETING AGENDA 22 MAY 2019
4. Program
As part of the tender clarification process, Ri-Con Contractors Pty Ltd clarified that completion of
the project could be accomplished in line with Council’s anticipated timeline, weather permitting.
The NAC will be closed to the public throughout the works which will also coincide with other
major works at the NAC within the 50m pool and plant room. Regular NAC attendees have
already been notified of the anticipated facility closure and will receive a more detailed update
following the award of the tender.
5. Public Access to Sunshine Beach Skate Park
The Sunshine Beach Skate Park will remain operational during the construction project.
Adequate public car parking will generally be available, however, there will be times where the
car park is closed for safety reasons. During such times the skate park may still be accessed by
utilising the linking pathway from Girraween Court.
Previous Council Consideration
Nil.
Finance
Council’s draft 2019/20 Capital Works Program includes $350,000 funding for this capital project,
comprising $232,500 (excl. GST) for roof replacement and $117,500 for deck replacement (excl.
GST) as part of the asset management plan renewal program. All tender submissions came in
over budget to varying levels. It is proposed that the additional costs required to complete the
project be incorporated into the budget as part of the 2019/20 BR1 budget review in August
2019.
Item Cost (excl. GST)
Costs to date (May 2019) $12,228.50
Tendered Contract Value $364,644.00
Superintendent Costs $4586.50
Total Project Cost $381,459.00
Risks & Opportunities
Finance Risks Mitigation
Council requests for scope increases This is to be mitigated through the Project Control Group
(PCG) and Capital Works Executive (CWE) management
and limitation of client requested scope variations
Contractor claims for variations for Mitigation through PCG and CWE with allowances made
unforeseen issues. within the contingency.
Program Risks Mitigation
There is a potential that the project is Construction through the typically dry season aims to
delayed due to bad weather. mitigate this.
Materials supply. Continued communication and frequent meetings with the
contractor to ensure industry suppliers are providing
updates on project timing.
Page 5 of 14
Section 6
SPECIAL MEETING AGENDA 22 MAY 2019
Program Risks Mitigation
Resource risk Ri-Con Contractors Pty Ltd has nominated a capable
team undertaking construction. The appointment of an
external superintendent mitigates the resource risk for
Council.
Construction takes longer than allowed for. The contractor has demonstrated to be well resourced
with an ability to increase crews to reduce risk of delays.
Liquidated damages will apply if the nominated timeline is
not achieved by the contractor.
Safety Risks Mitigation
Workplace health and safety issues Ri-Con Contractors Pty Ltd have demonstrated extensive
throughout project, including high risk work experience at working at heights and would be appointed
due to working at heights. as the principal contractor responsible for all workplace
health and safety of the designated site.
Multiple contractors working across Site management and design principles discussed with
different areas of the facility. Ri-Con and other awarded contractors.
Scope and Quality Risks Mitigation
Risk of not meeting project objectives. To be managed through Council officer reviews/
milestone meetings, and supported by specialist
consultants who developed the original design and
specifications.
Public Disruption and Council
Mitigation
Reputation Risks
Noise from plant and equipment may be a This will be minimised as much as possible with noisy
cause of disruption to local residents. works completed during business hours. Aside from the
onsite manager’s residence, closest surrounding
residence is 350m away.
Impact on NAC users Regular NAC attendees have already been notified of the
anticipated facility closure and will receive a more detailed
update following the formal award of the tender. The
closure has been deliberately scheduled to occur during
the facility’s quietest period.
Consultation
External Consultation - Community & Stakeholder
NAC management has communicated directly with regular NAC users and key stakeholders to
advise them of the upcoming closure. More detailed updates will be provided following award of
the tender. NAC management will work with Council’s Community Engagement branch to
continue to notify the public of the upcoming closure.
Internal Consultation
Corporate Services was consulted on both the procurement processes and budget matters.
Infrastructure Services was consulted on the tender scope, submissions and value.
Workplace Health and Safety (People & Culture) was consulted on the evaluation of tender
submissions.
Building & Plumbing Services provided building approval for the proposed works.
Asset Management identified the need to complete the works in order to address current
building issues.
Page 6 of 14
Section 7
SPECIAL MEETING AGENDA 22 MAY 2019
Departments/Sections Consulted:
X Chief Executive Officer X Community Services x Corporate Services
X Executive Officer x Director X Director
Executive Support Community Development X Financial Services
x Community Facilities ICT
Libraries & Galleries X Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
x Executive Services x Environment & Sustainable Development X Infrastructure Services
Director Director X Director
Community Engagement x Building & Plumbing Services x Asset Management
Customer Service Development Assessment X Buildings and Facilities
Governance Economic Development Civil Operations
x People and Culture Environmental Services Disaster Management
Strategic Land Use Planning X Infrastructure Planning,
Design and Delivery
Page 7 of 14
Section 8
SPECIAL MEETING AGENDA 22 MAY 2019
ATTACHMENT 1
Page 8 of 14
SPECIAL MEETING AGENDA 22 MAY 2019
ATTACHMENT 1
NOOSA SHIRE COUNCIL Weighted Attribute Evaluation Spreadsheet - Final Evaluation
NAME OF TENDERER PRICE
(Conforming Tenders Only) (excl of GST)
1
2
3
4 [ICM Construction (QLD) Pty Ltd
5 |Midson Construction (QLD) Pty Ltd
NON-CONFORMING TENDERS
[ConstructionSolutionsGroup, sd
IMSlaContractingPtyltd
1 2 3 4 5
PART A lion price elements Ltd Constructions the IF Layton Trust (QLD) Pty Ltd QLD) Pty Ltd
Resultant Resultant Resultant Resultant Resultant
Evaluation Criteria Weighting (%) score x score x ‘score x score x score x
foomancone | wm | | om | | eo | © | om | © | ew | m | 0
fomctecimctcmin | mm | > |» |» |= ||| @ || © | ww
peoosccroanmronans | om | = | ws | as | oe | | =m | = [ws] as | so
uiy CE | | tm | se | 2s | > | 350 | mo | soo | mo | 400 |
femasen | | | oe fos fam | | ow | m | om | os | om |
fomainooacoom | | ss | «|sm|os| |» iw] = ||
echnicatscore | sme] tea | ssz0 | ass | ss | oo
. HI-con Conractors P ravis D t Vietalla P td Al CM Construction Viidson Construction
ea nrc
otal Fees (Pc) 40% $364,644 $411,238 $512,684 $615,245 $645,277
Average Fees (Pav) S......ccsssseeseseeeeee $509,818
Price Score 128 119 99 79 73
Normalised Price Score (Pn) 100 93 7 62 57
Weighted Price Score (Pw)
Assesment Panel Member 2
Assesment Panel Member 5
Page 8 of 14Section 9
SPECIAL MEETING AGENDA 22 MAY 2019
2 1819T120 - NOOSA AQUATIC CENTRE POOLS REFURBISHMENT
DOCUMENT INFORM AT ION
Author Aquatic Facilities Coordinator, Stephen James
Community Services Department
Index ECM / Subject / 72.02 Noosa Aquatic Centre NAC
Attachments 1. 1819T120 – Evaluation Workbook
EXECUTIVE SUMMARY
This report provides a recommendation for the contract award of the preferred contractor for the
Noosa Aquatic Centre (NAC) Pools Refurbishment tender.
RECOMMENDATION
That Council note the report by the Aquatic Facilities Coordinator to the Special Meeting dated 22
May 2019 and award contract 1819T120 to Alto Pacific Pty Ltd for a lump sum price of $245,080
(excl. GST).
REPORT
The proposed contract is to replace the existing coping tiles, grout, and expansion joints within
the 50m pool and replace wet decking in both the 50m and Program pools. A majority of these
components are original elements of the construction in 1999 and have come to the end of their
useful life.
The contract works are proposed to commence onsite on 1 July 2019, with completion of works
and refilling of the pool occurring by 18 August 2019. The facility will already be closed
throughout this time in order to facilitate the completion of other major roof and deck replacement
capital works. Management will look to negotiate the bringing forward of the pools refurbishment
start date to 24 June 2019 (aligning with the first day of the facility’s closure) in order to allow for
a small contingency for timeline overrun.
1. Design
The look and feel of the NAC will remain virtually unchanged as these works are predominately
functional in nature rather than focussed on enhancing aesthetics. The works will address safety
concerns with current wet decking and form an important part of the maintenance program aimed
at maximising the life of the asset.
2. Tender Process
Due to the value of the works being greater than $200,000 and the complex nature of the project,
Council went out to tender in accordance with the Local Government Act 2009 to obtain
experienced and capable contractors.
The invitation to tender 1819T120 was released via VendorPanel on 12 April 2019 and was
advertised in the Noosa News on 16 April 2019.
Page 9 of 14
Section 10
SPECIAL MEETING AGENDA 22 MAY 2019
The tender closed at 2.00pm, Tuesday 7 May 2019 with two submissions received:
Alto Pacific Pty Ltd
Leaf Building GROUP Pty Ltd
3. Tender Assessment
The tender evaluation panel (outlined below) comprised internal staff who undertook an
assessment of the two conforming tender submissions.
Council Members
- Aquatic Facilities Coordinator (Evaluation Chair)
- Community Facilities Manager
- Pool Operations Supervisor
- Project Manager, Infrastructure Services
- Workplace Health and Safety Advisor
The tenders were evaluated against the following criteria:
Capability and Resourcing
Contract Experience and Capacity
Methodology
Quality
Health and Safety
Environment and Sustainability
Contribution to Local Economy
Price
The evaluation team met to discuss the tenders with specific focus on the project timeline,
proposed methodology and recommended product solutions. Additionally, clarifications of tender
submission responses, including the proposed method of replacing the existing ‘non-standard’
wet deck, more information on recommended product solutions and confirmation of conformity
with a stipulated process for safe emptying of the 50m pool, were sought from all respondents
and considered accordingly.
As a result of the evaluation Alto Pacific Pty Ltd achieved the highest overall score and were
shortlisted as the preferred supplier.
The evaluation panel considers Alto Pacific Pty Ltd to be the most advantageous to Council and
presents the best value for money. Alto Pacific Pty Ltd’s tender submission is favourable on the
following basis:
Demonstrated previous experience with similar large value commercial projects of this
nature.
Demonstrated good track record working in the aquatic maintenance industry.
Alto Pacific Pty Ltd have the necessary resources and processes in place to deliver the
project.
Proposed methodology minimises impact on customers and staff.
Competitive pricing.
4. Program
Alto Pacific Pty Ltd’s submitted program timeline aligns with both Council’s expectations and the
timeline of other works occurring at the NAC at the same time.
Page 10 of 14
Section 11
SPECIAL MEETING AGENDA 22 MAY 2019
5. Public Access to Sunshine Beach Skate Park
The Sunshine Beach Skate Park will remain operational during the NAC’s public closure.
Adequate public car parking will generally be available, however, there will be times where the
car park is closed for safety reasons. During such times the skate park may still be accessed by
utilising the linking pathway from Girraween Court.
Previous Council Consideration
Nil.
Finance
Council’s draft 2019/20 Capital Works Program includes funding for the proposed works within
the various asset management plan (AMP) renewal program items. The total cost of the works
falls within budgeted parameters.
Item Cost (excl. GST)
Costs to date (May 2019) nil
Tendered Contract Value $245,080.00
Superintendent Costs nil
Total Project Cost $245,080.00
Risks & Opportunities
Finance Risks Mitigation
Council requests for scope increases This is to be mitigated through the Project Control Group
(PCG) and Capital Works Executive (CWE) management
and limitation of client requested scope variations
Contractor claims for variations for Mitigation through PCG and CWE with allowances made
unforeseen issues. within the contingency.
Program Risks Mitigation
There is a potential that the project is Construction through the typically dry season aims to
delayed due to bad weather. mitigate this.
Materials supply. Continued communication and frequent meetings with the
contractor to ensure industry suppliers are providing
updates on project timing.
Resource risk Alto Pacific Pty Ltd has nominated a capable team
undertaking construction. The use of permanent NAC
staff to oversee works with assistance from others utilises
an existing Council resource.
Construction takes longer than allowed for. The contractor has demonstrated to be well resourced
and has allowed for ‘catch up’ days within their program.
Liquidated damages will apply if the nominated timeline is
not achieved by the contractor.
Major damage to 50m pool shell when Contractor must empty pool in line with controlled pool
emptying emptying requirements. Contractor will be asked to
develop a risk plan specifically around this item in order to
identify required actions should issues arise.
Page 11 of 14
Section 12
SPECIAL MEETING AGENDA 22 MAY 2019
Safety Risks Mitigation
Workplace health and safety issues Alto Pacific Pty Ltd have demonstrated extensive
throughout project, including high risk work experience at working in this environment and would be
due to working at heights. appointed as the principal contractor responsible for all
workplace health and safety of the designated site.
Multiple contractors working across Site management and design principles discussed with
different areas of the project. Alto Pacific Pty Ltd and other awarded contractors.
Scope and Quality Risks Mitigation
Risk of not meeting project objectives. To be managed through Council officer reviews/
milestone meetings, and supported by the Aquatic
Facilities Coordinator and Pool Operations Supervisor
who have intimate knowledge of the facility and its use.
Public Disruption and Council
Mitigation
Reputation Risks
Noise from plant and equipment may be a This will be minimised as much as possible with noisy
cause of disruption to local residents. works completed during business hours. Aside from the
onsite manager’s residence, closest surrounding
residence is 350m away.
Impact on NAC users Regular NAC attendees have already been notified of the
anticipated facility closure and will receive a more detailed
update following the formal award of the tender. The
closure has been deliberately scheduled to occur during
the facility’s quietest period.
Consultation
External Consultation - Community & Stakeholder
NAC management has communicated directly with regular NAC users and key stakeholders to
advise them of the upcoming closure. More detailed updates will be provided following award of
the tender. NAC management will work with Council’s Community Engagement branch to
continue to notify the public of the upcoming closure.
Internal Consultation
Corporate Services was consulted on both the procurement processes and budget matters.
Infrastructure Services was consulted on the tender scope, submissions and value.
Workplace Health and Safety (People & Culture) was consulted on the evaluation of tender
submissions.
Asset Management identified the need to complete the works in order to address current
facility issues.
Waste & Environmental Health provided guidance and approval for draining water from the
50m pool into surrounding storm water points in order to facilitate the pool works.
Page 12 of 14
Section 13
SPECIAL MEETING AGENDA 22 MAY 2019
Departments/Sections Consulted:
X Chief Executive Officer X Community Services x Corporate Services
X Executive Officer x Director X Director
Executive Support Community Development X Financial Services
x Community Facilities ICT
Libraries & Galleries X Procurement & Fleet
Local Laws Property
x Waste & Environmental Health Revenue Services
x Executive Services Environment & Sustainable Development X Infrastructure Services
Director Director X Director
Community Engagement Building & Plumbing Services x Asset Management
Customer Service Development Assessment X Buildings and Facilities
Governance Economic Development Civil Operations
x People and Culture Environmental Services Disaster Management
Strategic Land Use Planning X Infrastructure Planning,
Design and Delivery
Page 13 of 14
Section 14
SPECIAL MEETING AGENDA 22 MAY 2019
ATTACHMENT 1
Page 14 of 14
SPECIAL MEETING AGENDA 22 MAY 2019
ATTACHMENT 1
NOOSA SHIRE COUNCIL Weighted Attribute Evaluation Spreadsheet - Final Evaluation
NAME OF TENDERER PRICE
(Conforming Tenders Only) {excl of GST)
1
2
Bt
NON-CONFORMING TENDERS
pias «| Ahan |
1 2
Resultant Resultant
Evaluation Criteria Weighting (%) score x score x
fomactmewscmy fs = fos |» | me |
foowene |e [| | oe |
a
famamey Pos of | |
oman | = fe fw |» | |
ee
festcamaee Pf Pw
Total Fees (Pc) $245,080 $303,216
Average Fees (Pav) $........ccssesssensee
Price Score 111 8s
Normalised Price Score (Pn) 100 81
Weighted Price Score (Pw)
aaenenceane teat
| Assesment PanelMember3— | WHSOfficer