                       AGENDA


              Special Meeting



            Wednesday, 22 May 2019

                    commencing at 1pm
          Council Chambers, 9 Pelican Street, Tewantin



Crs Tony Wellington (Chair), Jess Glasgow, Ingrid Jackson, Joe Jurisevic,
Frank Pardon, Brian Stockwell, Frank Wilkie



                    “Noosa Shire – different by nature”
Log in to download the original file

2019-05-22 Special Meeting Agenda(PDF, 709KB).pdf · 726 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 13 sections

Section 2

SPECIAL MEETING AGENDA                                         22 MAY 2019


TABLE OF CONTENTS

ITEM                                                                     PAGE


ATTENDANCE & APOLOGIES                                                        -

REPORTS                                                                      3

1      1819T062 - NOOSA AQUATIC CENTRE ROOF AND DECK REPLACEMENT             3

2      1819T120 - NOOSA AQUATIC CENTRE POOLS REFURBISHMENT                   9

MEETING CLOSURE                                                               -




                                                                   Page 2 of 14

Section 3

SPECIAL MEETING AGENDA                                                             22 MAY 2019


REPORTS
1                        1819T062 - NOOSA AQUATIC CENTRE ROOF AND DECK REPLACEMENT
DOCUMENT INFORM AT ION




Author                            Building & Facilities Coordinator, Chris Steel
                                  Infrastructure Services Department

Index                             ECM / Subject / 72.02 Noosa Aquatic Centre NAC

Attachments                       1.      1819T062 – Evaluation Workbook



EXECUTIVE SUMMARY
This report provides a recommendation for the contract award of the preferred contractor for the
Noosa Aquatic Centre (NAC) roof and deck replacement.

RECOMMENDATION
That Council note the report by the Building Facilities Coordinator to the Special Meeting dated
22 May 2019 and award contract 1819T062 to Ri-Con Contractors Pty Ltd for a lump sum price
of $364,644.00 (excl. GST).


REPORT
The proposed contract is to replace the existing roof and deck at the NAC. The roof and deck are
part of the original 1999 construction and have come to the end of their useful life.

The contract works are proposed to commence on site on the 24 June 2019 with construction
anticipated to be completed by the 14 August 2019. In order to allow for a small timeline overrun
contingency, the NAC is aiming for a public reopening on Monday 20 August 2019 (an 8-week
closure in total).

1.                       Design

The Noosa Aquatic Centre roof design will remain almost identical to the original with only a
slight change in roof sheeting profile. The specified product solution has also taken into
consideration the harsh environment present at the NAC. The decking design has been slightly
modified to provide for better DDA compliance and greater deck space for the public to utilise.

2.                       Tender Process

Due to the value of the works being greater than $200,000 and the complex nature of the project,
Council went out to tender in accordance with the Local Government Act 2009 to obtain
submissions from experienced and capable contractors.

The invitation to tender 1819T062 was released via VendorPanel on 15 March 2019 and
advertised in local publications, the Sunshine Coast Daily on 16 March 2019 and the Noosa
News on 19 March 2019.




                                                                                   Page 3 of 14

Section 4

SPECIAL MEETING AGENDA                                                           22 MAY 2019


The tender closed at 2.00pm, Tuesday 9 April 2019 with seven submissions received as follows:
 Constructions Solutions Group
 ICM Construction (QLD) Pty Ltd
 M51A Contracting Pty Ltd
 Metalla Pty Ltd
 Midson Construction (Qld) Pty Ltd.
 Ri-Con Contractors Pty Ltd
 Travis Drenth Constructions

3.   Tender Assessment

The tender evaluation panel (outlined below) comprised both internal staff and one external
expert who all undertook an assessment of the five conforming tender submissions.

 Council Members
   - Building and Facilities Coordinator (Evaluation Chair)
   - Community Facilities Manager
   - Aquatic Facilities Coordinator
   - Project Manager, Infrastructure Services
   - Work Health and Safety Advisor

 External Experts
   - Contour (Roof and Deck)

The tenders were evaluated against the following criteria:
 Capability and Resourcing
 Contract Experience and Capacity
 Methodology
 Quality
 Health and Safety
 Contribution to Local Economy
 Price

The evaluation team met on several occasions to discuss the tenders with specific focus on the
timeline, project Gantt charts and the products being proposed. Additionally, clarifications of
tender submission responses, including the timeline and program duration, were sought from all
respondents and considered accordingly.

As a result of the evaluation Ri-Con Contractors Pty Ltd achieved the highest overall score and
were shortlisted as the preferred supplier.

The evaluation panel considers Ri-Con Contractors Pty Ltd to be the most advantageous to
Council and presents the best value for money. Ri-Con Contractors Pty Ltd’s tender submission
is favourable on the following basis:
 Demonstrated experience with similar large value commercial projects of this nature;
 Demonstrated good track record working for Noosa Council and on other similar projects;
 Ri-Con Contractors Pty Ltd have the necessary resources and processes in place to deliver
     the project;
 Proposed methodology minimises impact on customers and staff;
 Competitive pricing.




                                                                                  Page 4 of 14

Section 5

SPECIAL MEETING AGENDA                                                                 22 MAY 2019


4.      Program

As part of the tender clarification process, Ri-Con Contractors Pty Ltd clarified that completion of
the project could be accomplished in line with Council’s anticipated timeline, weather permitting.

The NAC will be closed to the public throughout the works which will also coincide with other
major works at the NAC within the 50m pool and plant room. Regular NAC attendees have
already been notified of the anticipated facility closure and will receive a more detailed update
following the award of the tender.

5.      Public Access to Sunshine Beach Skate Park

The Sunshine Beach Skate Park will remain operational during the construction project.
Adequate public car parking will generally be available, however, there will be times where the
car park is closed for safety reasons. During such times the skate park may still be accessed by
utilising the linking pathway from Girraween Court.

Previous Council Consideration
Nil.

Finance
Council’s draft 2019/20 Capital Works Program includes $350,000 funding for this capital project,
comprising $232,500 (excl. GST) for roof replacement and $117,500 for deck replacement (excl.
GST) as part of the asset management plan renewal program. All tender submissions came in
over budget to varying levels. It is proposed that the additional costs required to complete the
project be incorporated into the budget as part of the 2019/20 BR1 budget review in August
2019.

 Item                                                                        Cost (excl. GST)
 Costs to date (May 2019)                                                              $12,228.50
 Tendered Contract Value                                                             $364,644.00
 Superintendent Costs                                                                    $4586.50

 Total Project Cost                                                                  $381,459.00



Risks & Opportunities


 Finance Risks                              Mitigation
 Council requests for scope increases       This is to be mitigated through the Project Control Group
                                            (PCG) and Capital Works Executive (CWE) management
                                            and limitation of client requested scope variations
 Contractor claims for variations for       Mitigation through PCG and CWE with allowances made
 unforeseen issues.                         within the contingency.

 Program Risks                              Mitigation
 There is a potential that the project is   Construction through the typically dry season aims to
 delayed due to bad weather.                mitigate this.
 Materials supply.                          Continued communication and frequent meetings with the
                                            contractor to ensure industry suppliers are providing
                                            updates on project timing.



                                                                                        Page 5 of 14

Section 6

SPECIAL MEETING AGENDA                                                                        22 MAY 2019


 Program Risks                                  Mitigation
 Resource risk                                  Ri-Con Contractors Pty Ltd has nominated a capable
                                                team undertaking construction. The appointment of an
                                                external superintendent mitigates the resource risk for
                                                Council.
 Construction takes longer than allowed for.    The contractor has demonstrated to be well resourced
                                                with an ability to increase crews to reduce risk of delays.
                                                Liquidated damages will apply if the nominated timeline is
                                                not achieved by the contractor.

 Safety Risks                                   Mitigation
 Workplace health and safety issues             Ri-Con Contractors Pty Ltd have demonstrated extensive
 throughout project, including high risk work   experience at working at heights and would be appointed
 due to working at heights.                     as the principal contractor responsible for all workplace
                                                health and safety of the designated site.
 Multiple contractors working across            Site management and design principles discussed with
 different areas of the facility.               Ri-Con and other awarded contractors.

 Scope and Quality Risks                        Mitigation
 Risk of not meeting project objectives.        To be managed through Council officer reviews/
                                                milestone meetings, and supported by specialist
                                                consultants who developed the original design and
                                                specifications.

 Public Disruption and Council
                                                Mitigation
 Reputation Risks
 Noise from plant and equipment may be a        This will be minimised as much as possible with noisy
 cause of disruption to local residents.        works completed during business hours. Aside from the
                                                onsite manager’s residence, closest surrounding
                                                residence is 350m away.
 Impact on NAC users                            Regular NAC attendees have already been notified of the
                                                anticipated facility closure and will receive a more detailed
                                                update following the formal award of the tender. The
                                                closure has been deliberately scheduled to occur during
                                                the facility’s quietest period.



Consultation
External Consultation - Community & Stakeholder
NAC management has communicated directly with regular NAC users and key stakeholders to
advise them of the upcoming closure. More detailed updates will be provided following award of
the tender. NAC management will work with Council’s Community Engagement branch to
continue to notify the public of the upcoming closure.
Internal Consultation
 Corporate Services was consulted on both the procurement processes and budget matters.
 Infrastructure Services was consulted on the tender scope, submissions and value.
 Workplace Health and Safety (People & Culture) was consulted on the evaluation of tender
   submissions.
 Building & Plumbing Services provided building approval for the proposed works.
 Asset Management identified the need to complete the works in order to address current
   building issues.


                                                                                               Page 6 of 14

Section 7

SPECIAL MEETING AGENDA                                                                      22 MAY 2019


Departments/Sections Consulted:

X   Chief Executive Officer   X   Community Services                      x   Corporate Services
X   Executive Officer         x   Director                                X   Director
    Executive Support             Community Development                   X   Financial Services
                              x   Community Facilities                        ICT
                                  Libraries & Galleries                   X   Procurement & Fleet
                                  Local Laws                                  Property
                                  Waste & Environmental Health                Revenue Services

x   Executive Services        x   Environment & Sustainable Development   X   Infrastructure Services
    Director                      Director                                X   Director
    Community Engagement      x   Building & Plumbing Services            x   Asset Management
    Customer Service              Development Assessment                  X   Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
x   People and Culture            Environmental Services                      Disaster Management
                                  Strategic Land Use Planning             X   Infrastructure Planning,
                                                                              Design and Delivery




                                                                                            Page 7 of 14

Section 8

SPECIAL MEETING AGENDA     22 MAY 2019


                         ATTACHMENT 1




                           Page 8 of 14

SPECIAL MEETING AGENDA                                                         22 MAY 2019

                                                                                ATTACHMENT 1

  NOOSA SHIRE COUNCIL    Weighted Attribute Evaluation Spreadsheet - Final Evaluation

 NAME OF TENDERER                         PRICE
  (Conforming Tenders Only)            (excl of GST)
1
2
3
4 [ICM Construction (QLD) Pty Ltd
5 |Midson Construction (QLD) Pty Ltd
  NON-CONFORMING TENDERS
  [ConstructionSolutionsGroup, sd
  IMSlaContractingPtyltd
                                           1            2            3           4           5
            PART A lion price elements    Ltd       Constructions the IF Layton Trust (QLD) Pty Ltd QLD) Pty Ltd
                                            Resultant    Resultant   Resultant    Resultant   Resultant
 Evaluation Criteria       Weighting (%)     score x     score x      ‘score x    score x      score x
foomancone             |     wm      | | om |         | eo | © | om | © | ew | m | 0
fomctecimctcmin         |     mm   | > |» |» |= ||| @ ||                                  © | ww
 peoosccroanmronans |        om    | = | ws | as | oe |            |  =m | = [ws] as | so
  uiy               CE           | | tm | se | 2s | > | 350 | mo | soo | mo | 400 |
femasen                  |         |     | oe fos fam |            | ow | m | om | os | om |
fomainooacoom |                    | ss | «|sm|os| |» iw] = ||
     echnicatscore   | sme]               tea    |    ssz0 | ass |             ss |          oo

                   .                  HI-con Conractors P ravis D t Vietalla P td Al CM Construction Viidson Construction
                                                                              ea          nrc
  otal Fees (Pc)             40%        $364,644     $411,238     $512,684    $615,245     $645,277
  Average Fees (Pav) S......ccsssseeseseeeeee $509,818
 Price Score                              128          119          99          79           73
  Normalised Price Score (Pn)             100          93           7           62           57
  Weighted Price Score (Pw)

           Assesment Panel Member 2

            Assesment Panel Member 5

                                                                                     Page 8 of 14

Section 9

SPECIAL MEETING AGENDA                                                                   22 MAY 2019


2                        1819T120 - NOOSA AQUATIC CENTRE POOLS REFURBISHMENT
DOCUMENT INFORM AT ION




Author                            Aquatic Facilities Coordinator, Stephen James
                                  Community Services Department

Index                             ECM / Subject / 72.02 Noosa Aquatic Centre NAC

Attachments                       1.      1819T120 – Evaluation Workbook



EXECUTIVE SUMMARY
This report provides a recommendation for the contract award of the preferred contractor for the
Noosa Aquatic Centre (NAC) Pools Refurbishment tender.

RECOMMENDATION
That Council note the report by the Aquatic Facilities Coordinator to the Special Meeting dated 22
May 2019 and award contract 1819T120 to Alto Pacific Pty Ltd for a lump sum price of $245,080
(excl. GST).


REPORT
The proposed contract is to replace the existing coping tiles, grout, and expansion joints within
the 50m pool and replace wet decking in both the 50m and Program pools. A majority of these
components are original elements of the construction in 1999 and have come to the end of their
useful life.

The contract works are proposed to commence onsite on 1 July 2019, with completion of works
and refilling of the pool occurring by 18 August 2019. The facility will already be closed
throughout this time in order to facilitate the completion of other major roof and deck replacement
capital works. Management will look to negotiate the bringing forward of the pools refurbishment
start date to 24 June 2019 (aligning with the first day of the facility’s closure) in order to allow for
a small contingency for timeline overrun.

1.                       Design

The look and feel of the NAC will remain virtually unchanged as these works are predominately
functional in nature rather than focussed on enhancing aesthetics. The works will address safety
concerns with current wet decking and form an important part of the maintenance program aimed
at maximising the life of the asset.

2.                       Tender Process

Due to the value of the works being greater than $200,000 and the complex nature of the project,
Council went out to tender in accordance with the Local Government Act 2009 to obtain
experienced and capable contractors.

The invitation to tender 1819T120 was released via VendorPanel on 12 April 2019 and was
advertised in the Noosa News on 16 April 2019.




                                                                                         Page 9 of 14

Section 10

SPECIAL MEETING AGENDA                                                             22 MAY 2019


The tender closed at 2.00pm, Tuesday 7 May 2019 with two submissions received:

 Alto Pacific Pty Ltd
 Leaf Building GROUP Pty Ltd

3.   Tender Assessment

The tender evaluation panel (outlined below) comprised internal staff who undertook an
assessment of the two conforming tender submissions.

 Council Members
   - Aquatic Facilities Coordinator (Evaluation Chair)
   - Community Facilities Manager
   - Pool Operations Supervisor
   - Project Manager, Infrastructure Services
   - Workplace Health and Safety Advisor

The tenders were evaluated against the following criteria:
 Capability and Resourcing
 Contract Experience and Capacity
 Methodology
 Quality
 Health and Safety
 Environment and Sustainability
 Contribution to Local Economy
 Price

The evaluation team met to discuss the tenders with specific focus on the project timeline,
proposed methodology and recommended product solutions. Additionally, clarifications of tender
submission responses, including the proposed method of replacing the existing ‘non-standard’
wet deck, more information on recommended product solutions and confirmation of conformity
with a stipulated process for safe emptying of the 50m pool, were sought from all respondents
and considered accordingly.

As a result of the evaluation Alto Pacific Pty Ltd achieved the highest overall score and were
shortlisted as the preferred supplier.

The evaluation panel considers Alto Pacific Pty Ltd to be the most advantageous to Council and
presents the best value for money. Alto Pacific Pty Ltd’s tender submission is favourable on the
following basis:
 Demonstrated previous experience with similar large value commercial projects of this
     nature.
 Demonstrated good track record working in the aquatic maintenance industry.
 Alto Pacific Pty Ltd have the necessary resources and processes in place to deliver the
     project.
 Proposed methodology minimises impact on customers and staff.
 Competitive pricing.

4.   Program

Alto Pacific Pty Ltd’s submitted program timeline aligns with both Council’s expectations and the
timeline of other works occurring at the NAC at the same time.




                                                                                  Page 10 of 14

Section 11

SPECIAL MEETING AGENDA                                                                       22 MAY 2019


5.      Public Access to Sunshine Beach Skate Park

The Sunshine Beach Skate Park will remain operational during the NAC’s public closure.
Adequate public car parking will generally be available, however, there will be times where the
car park is closed for safety reasons. During such times the skate park may still be accessed by
utilising the linking pathway from Girraween Court.

Previous Council Consideration
Nil.

Finance
Council’s draft 2019/20 Capital Works Program includes funding for the proposed works within
the various asset management plan (AMP) renewal program items. The total cost of the works
falls within budgeted parameters.

 Item                                                                             Cost (excl. GST)
 Costs to date (May 2019)                                                                             nil
 Tendered Contract Value                                                                   $245,080.00
 Superintendent Costs                                                                                 nil

 Total Project Cost                                                                        $245,080.00


Risks & Opportunities
 Finance Risks                                 Mitigation
 Council requests for scope increases          This is to be mitigated through the Project Control Group
                                               (PCG) and Capital Works Executive (CWE) management
                                               and limitation of client requested scope variations
 Contractor claims for variations for          Mitigation through PCG and CWE with allowances made
 unforeseen issues.                            within the contingency.

 Program Risks                                 Mitigation
 There is a potential that the project is      Construction through the typically dry season aims to
 delayed due to bad weather.                   mitigate this.
 Materials supply.                             Continued communication and frequent meetings with the
                                               contractor to ensure industry suppliers are providing
                                               updates on project timing.
 Resource risk                                 Alto Pacific Pty Ltd has nominated a capable team
                                               undertaking construction. The use of permanent NAC
                                               staff to oversee works with assistance from others utilises
                                               an existing Council resource.
 Construction takes longer than allowed for.   The contractor has demonstrated to be well resourced
                                               and has allowed for ‘catch up’ days within their program.
                                               Liquidated damages will apply if the nominated timeline is
                                               not achieved by the contractor.
 Major damage to 50m pool shell when           Contractor must empty pool in line with controlled pool
 emptying                                      emptying requirements. Contractor will be asked to
                                               develop a risk plan specifically around this item in order to
                                               identify required actions should issues arise.




                                                                                            Page 11 of 14

Section 12

SPECIAL MEETING AGENDA                                                                        22 MAY 2019


 Safety Risks                                   Mitigation
 Workplace health and safety issues             Alto Pacific Pty Ltd have demonstrated extensive
 throughout project, including high risk work   experience at working in this environment and would be
 due to working at heights.                     appointed as the principal contractor responsible for all
                                                workplace health and safety of the designated site.
 Multiple contractors working across            Site management and design principles discussed with
 different areas of the project.                Alto Pacific Pty Ltd and other awarded contractors.

 Scope and Quality Risks                        Mitigation
 Risk of not meeting project objectives.        To be managed through Council officer reviews/
                                                milestone meetings, and supported by the Aquatic
                                                Facilities Coordinator and Pool Operations Supervisor
                                                who have intimate knowledge of the facility and its use.

 Public Disruption and Council
                                                Mitigation
 Reputation Risks
 Noise from plant and equipment may be a        This will be minimised as much as possible with noisy
 cause of disruption to local residents.        works completed during business hours. Aside from the
                                                onsite manager’s residence, closest surrounding
                                                residence is 350m away.
 Impact on NAC users                            Regular NAC attendees have already been notified of the
                                                anticipated facility closure and will receive a more detailed
                                                update following the formal award of the tender. The
                                                closure has been deliberately scheduled to occur during
                                                the facility’s quietest period.



Consultation
External Consultation - Community & Stakeholder
NAC management has communicated directly with regular NAC users and key stakeholders to
advise them of the upcoming closure. More detailed updates will be provided following award of
the tender. NAC management will work with Council’s Community Engagement branch to
continue to notify the public of the upcoming closure.

Internal Consultation
 Corporate Services was consulted on both the procurement processes and budget matters.
 Infrastructure Services was consulted on the tender scope, submissions and value.
 Workplace Health and Safety (People & Culture) was consulted on the evaluation of tender
   submissions.
 Asset Management identified the need to complete the works in order to address current
   facility issues.
 Waste & Environmental Health provided guidance and approval for draining water from the
   50m pool into surrounding storm water points in order to facilitate the pool works.




                                                                                             Page 12 of 14

Section 13

SPECIAL MEETING AGENDA                                                                      22 MAY 2019


Departments/Sections Consulted:

X   Chief Executive Officer   X   Community Services                      x   Corporate Services
X   Executive Officer         x   Director                                X   Director
    Executive Support             Community Development                   X   Financial Services
                              x   Community Facilities                        ICT
                                  Libraries & Galleries                   X   Procurement & Fleet
                                  Local Laws                                  Property
                              x   Waste & Environmental Health                Revenue Services

x   Executive Services            Environment & Sustainable Development   X   Infrastructure Services
    Director                      Director                                X   Director
    Community Engagement          Building & Plumbing Services            x   Asset Management
    Customer Service              Development Assessment                  X   Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
x   People and Culture            Environmental Services                      Disaster Management
                                  Strategic Land Use Planning             X   Infrastructure Planning,
                                                                              Design and Delivery




                                                                                           Page 13 of 14

Section 14

SPECIAL MEETING AGENDA     22 MAY 2019


                         ATTACHMENT 1




                           Page 14 of 14

SPECIAL MEETING AGENDA                                                           22 MAY 2019

                                                                               ATTACHMENT 1

  NOOSA SHIRE COUNCIL       Weighted Attribute Evaluation Spreadsheet - Final Evaluation

  NAME OF TENDERER                            PRICE
  (Conforming Tenders Only)                {excl of GST)
1
2
Bt
  NON-CONFORMING TENDERS

             pias «| Ahan |
                                               1             2

                                                Resultant      Resultant
  Evaluation Criteria        Weighting (%)       score x       score x
  fomactmewscmy fs                         = fos |» | me |
 foowene |e [| | oe |
  a
 famamey Pos of |                                                |
   oman                   |      = fe fw |» |                     |
     ee
festcamaee                 Pf Pw

  Total Fees (Pc)                            $245,080      $303,216
 Average Fees (Pav) $........ccssesssensee
 Price Score                                   111           8s
 Normalised Price Score (Pn)                   100           81
  Weighted Price Score (Pw)

                aaenenceane                           teat
 |          Assesment PanelMember3— |                 WHSOfficer

                                                                                   Page 14 of 14

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.