Attachment 5 - Documents referenced in conditions
Attached to the e-mail 2505-45871 SARA Response with conditions - OPW25/0072.
Scale Point 17874
TBM E/PIN
Culvert crossing array must be made up
of a minimum of 6 x 1800 mm wide cells
with a combined aperture width of at
least 10.8 meters
T*S15/0.5D18HLILLIPILLI
T*S20/1.0D18HCAMPHOR
T*S20/0.8D18HCAMPHOR T*S20/1D18HCAMPHOUR
T*S15/0.5D18HLILLIPILLI
17858
TBM G/PIN
X
T*S20/1.0D18HCAMPHOR X
T*S20/1.0D18HCAMPHOR 0.25D BLACK WATTLE
X
T*S20/1.0D18HCAMPHOR
17872
TBM D/PIN
X
T*S20/1.0D18HCAMPHOR
X
GNSS15
TBMC/PINGNSS
0 4 8 12m
TREE MANAGEMENT PLAN
Scale 1:200 @A1
A3 WEATHER PROOF (COREFLUTE) TREE
PROTECTION SIGNS TO BE SUPPLIED BY
THE CONTRACTOR. INSTALL ON TREE
PROTECTION FENCE AS FOLLOWS:
· 1 SIGN PER INDIVIDUAL TREE
· 1 SIGN PER 15 LINEAR METER FOR
FENCED VEGETATION AREAS
TREE
PROTECTION
ZONE EXISTING TREE:
X TAKE UP AND REMOVE FROM SITE, INCLUDING ROOT AS SPECIFIED
ON DETAIL PLANS.
NO ACCESS TREE PROTECTION AREA (TPZ) WITH TREE PROTECTION FENCE
REFER TO DETAIL PLANS AND TO AS4970(2009) & REFER TO MBRC-GI-0505
STRUCTURAL ROOT ZONE (SRZ)
REFER TO DETAIL PLANS AND TO AS4970(2009).
EXCAVATION WITHIN THIS ZONE IS STRICTLY
RESTRICTED TO HAND OR VACUUM EXCAVATION
Callaghan & Toth 36 ROSES ROAD FEDERAL
Civil, Environmental & Hydraulic Engineers C
MICHAEL JONES TREE MANAGEMENT PLAN
A1
OPERATIONAL WORKS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.