Officer: 	Mark Lewis
Direct Telephone: 	07 53296290
Our Reference:	OPW20/0083
Your Reference:	Crystal Street.
3 June 2020
Cooroy Rentals Pty Ltd TTE
PO Box 1040
NOOSAVILLE  QLD  4566
[email protected]
Dear Sir
Information Request
Planning Act 2016
I refer to your application and advise that Council requires further information to satisfactorily assess the proposal.
application details
Application No.	OPW20/0083
Street Address:	28 Crystal St Cooroy Qld 4563
Real Property Description:	Lot 27 RP 32777, Lot 28 RP 32777
Planning Scheme:	The Noosa Plan (8 June 2018)
INFORMATION REQUIRED
The information requested is set out below:
Issue
New Driveway to No 28 Crystal Street.
The finished levels of the driveway stand above the surrounding surface levels creating a trip hazard and the levels create the potential for runoff from the road reserve to be directed onto the adjoining property.
The finished levels of the driveway direct runoff from the driveway towards the site and the internal levels direct runoff towards the dwellings. The driveway does not include any features to control the surface runoff.
It is noted that the surface of the new driveway indicates that vehicles have been scrapping or bottoming out when using the driveway.
Information Required
Provide plans of the driveway that are either prepared by a Registered Professional Engineer of Queensland (RPEQ) or are endorsed by a RPEQ. The plans must include sufficient detail to demonstrate:
that the driveway will not create trip hazards in the road reserve and the extent of any filling works in the road reserve
that the driveway levels and associated filling works do not direct runoff from the road reserve on to the adjoining property
that the levels and grades of the driveway are sufficient to ensure that vehicles do not scrap or bottom out on the driveway or the road formation when entering and exiting the site. It is expected that the vehicle will be a B99 vehicle as described in AS/NZS2890.1:2004 and a longitudinal section extending from the centreline of the road formation to the property boundary will be included.
that the runoff from the driveway will not adversely impact on the functionality, longevity and structural integrity of the dwellings. Any necessary features to control and direct surface runoff must be included on the plans
Issue
New Driveway to No 26 Crystal Street.
The finished levels of the driveway in sections stand above the surrounding surface levels creating a trip hazard and the pipework under the driveway appears undersized and is causing scour in the road reserve at the outlet.
The finished levels of the driveway direct runoff from the driveway towards the site and the internal levels direct runoff towards the dwellings. The driveway does not include any features to control the surface runoff.
It is noted that the surface of the new driveway indicates that vehicles have been scrapping or bottoming out when using the driveway.
Information Required
Provide plans of the driveway that are either prepared by a Registered Professional Engineer of Queensland (RPEQ) or are endorsed by a RPEQ. The plans must include sufficient detail to demonstrate:
that the driveway will not create trip hazards in the road reserve and the extent of any filling works in the road reserve
that the pipework is of suitable size and include the measures to be installed at the outlet to prevent scour or damage to the road reserve
that the levels and grades of the driveway are sufficient to ensure that vehicles do not scrap or bottom out on the driveway or the road formation when entering and exiting the site. It is expected that the vehicle will be a B99 vehicle as described in AS/NZS2890.1:2004 and a longitudinal section extending from the centreline of the road formation to the property boundary will be included.
that the runoff from the driveway will not adversely impact on the functionality, longevity and structural integrity of the dwellings. Any necessary features to control and direct surface runoff must be included on the plans
due date for response to information request
The due date for providing the requested information is 5 September 2020. Please advise Council of your response to this information request in accordance with section 13 of the Development Assessment Rules.
If you do not provide a response before the due date, it will be taken as if you have decided not to respond to the information request and Council will continue with the assessment of your application.
other details
You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online Services” page can be accessed via "Quick Links" on the left hand side of the screen.
Should you have any further queries in relation to the above, please do not hesitate to contact me on the number above.
Yours faithfully,

Mark Lewis
Coordinator - Engineering

[word/footer1.xml]
Page 2 of 3

[word/footer2.xml]
PO Box 141		P. (07) 5329 6500	[email protected]	
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au
				Page 1 of 3

[word/header1.xml]
3

Used in these records

About this file

File size
73 KB (small file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

Information Request OPW20 0083.docx · 73 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.