9.0 Shed Site Class Report
Job No: 20/0609-C Date Tested: 10/07/2020 Site : 142 Playford Rd, Kin Kin (Shed) Client : David Rogalsky SCALE 1.500
Proposed Advanced Secondary Eco-Safe
Sand Filter with Large Capacity Pump
(To be installed)
Survey Pegged #9014
Proposed pressure-compensating Covered Fill Batter
Surface Drip Irrigation Area - 80m2
(Wasteflow or Netafim to be used)
(To be mulched, utilize existing plants, Proposed
border and install) Shed
On Level Cut/
BH2 Fill Platform
BH1
PN2 PN1
15m 20m
BH3
10m PT1 2m Cut
BH5
PT3 30% Slope
13% BH4
Slope 8m PT2