RFI 10.03.2020 - Appendix C - Memorandum cooroibah waterway crossing · MCU16/0099.01
There is little to no indication that formwork was used with no straight or flat edges. The concrete
finishes appear to be spread by hand, with no assurance that correct compaction techniques were
applied.
◼ The concrete extends up to the fence line for most of the length of the crossing.
◼ The concrete along the fence line is overlain with topsoil and grass cover that has formed over time
from flooding. A DCP test undertaken in this location found that the DCP refused at 0.15-0.20m bgl
(below ground level). Figure 4 is an image of the crossing along the fence line.
◼ The concrete is built up along the dam edge on the southern side with an approximate 200-500mm
difference between the rest of the crossing. Figure 5 presents a view of the concrete built up along
the dam edge on the southern side of crossing.
◼ Approximately 0.5m difference in the level between the two dams/waterways on each side of the
crossing.
◼ No major cracking and very minimal crumbling was observed in the concrete.
Figure 4: View of crossing along the fence line
Project 239146 File 247473 Cooroibah Waterway Crossing_Rev0.docx 2020-02-192020-02-19 Revision A Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI 10.03.2020 - Appendix C - Memorandum cooroibah waterway crossing.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.