Skip to the record
The gold standard in government transparency.

Original source · versioned page text

3836IDAS+Consent Form

Attached to the e-mail REC15/0010 Application to Reconfigure a Lot - 1 lot into 2 lots - Email 1 of 2.

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 

 

CO By making this application, |, the applicant, declare that the owner has given written consent to the making of the
application.

 

 

8. Does the application involve a State resource? (E.g. the application involves taking water or quarry material, or

interfering. with the. flow of water. Refer to the notes at the end of this form for more information) (Non-mandatory
requirement.) : :

 

 

Xx] No [| Notidentified whether or [[] Yes—complete Table J
not the application
involves a State
resource

 

Table J

 

Nature of State-owned resource (if identified)

 

 

 

 

9. Identify if any of the following apply to the premises (Tick applicable box/es.)

 

 

Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete Table K
On strategic port land under the Transport Infrastructure Act 1994—-complete Table L
In a tidal water area—complete Table M

On Brisbane core port land under the Transport Infrastructure Act 1994 (no table requires completion)

OOOOd

On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table requires completion)

 

Table K

 

Name of water body, watercourse or aquifer

 

 

 

 

 

 

 

 

Table L

Lot on plan description for strategic port land Port authority for the fot

Table M

Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)

 

 

 

 

10. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water
etc.)

 

No C] Yes—ensure the type, location and dimension of each easement is included in the plans submitted

 

 

11. Does the proposal include new building work or operational work on the premises? (Including any services.)

 

No CL Yes—ensure the nature, location and dimension of proposed works are included in plans submitted

 

5 IDAS form 1-

 

 
Log in to download the original file

3836IDAS+Consent Form.pdf · 591 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.